Contractor Records
Home › Baltimore › Permits by ZIP code

Building permits by ZIP code in the City of Baltimore

Data through September 2026 · updated 18 Oct 2026

24 ZIP codes have 250 or more building permits in the City of Baltimore, June 2025 through September 2026. 21230 is the busiest with 3,167 (9% of 37,029). Together they hold 99% of the permits.

ZIP codes by permits

Busiest first, June 2025 through September 2026. Top kind of work is the one with the most permits in that ZIP code.

ZIP codePermitsShareTop kind of work
212303,1679%Remodels & repairs (681)
212182,9178%Remodels & repairs (894)
212152,9108%Remodels & repairs (998)
212172,8998%Remodels & repairs (1,092)
212132,5787%Remodels & repairs (984)
212232,4327%Remodels & repairs (990)
212242,3526%Remodels & repairs (733)
212162,1496%Remodels & repairs (826)
212291,8205%Remodels & repairs (533)
212061,5474%Remodels & repairs (424)
212021,2793%Remodels & repairs (297)
212141,2653%Remodels & repairs (374)
212111,2623%Remodels & repairs (341)
212391,1943%Electrical (359)
212121,1083%Remodels & repairs (312)
212051,0873%Remodels & repairs (401)
212018792%Remodels & repairs (243)
212318002%Remodels & repairs (248)
212106562%Remodels & repairs (170)
212255682%Remodels & repairs (187)
212075612%Remodels & repairs (168)
212094951%Remodels & repairs (105)
212083811%HVAC (337)
21234346under 1%Plumbing (94)

10 more ZIP codes have fewer than 250 permits each (344 in all), so no page.

Download this table (CSV)

How these numbers are made

Source: Open Baltimore: Housing and Building Permits 2019-Present (DHCD, ArcGIS layer Building Permits), read 18 Oct 2026. We count permits issued June 2025 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building and demolition permits the City of Baltimore issues inside city limits: combination permits for homes and for commercial buildings (which cover building, electrical, plumbing and mechanical work in one permit) and demolition (razing) permits. Use-and-occupancy permits, temporary event permits, zoning appeals, permit modifications and extensions of earlier permits in the same file are not counted. Baltimore County, which surrounds the city, is a separate jurisdiction with its own permit office and is not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Baltimore.
  • The file has no status and no final inspection date, so we show no finished share and no time to final; every permit is listed as open.
  • The city moved to a new permit system in early 2025 (permit numbers changed from COM to BRCM and BCCM, and February 2025 has almost no permits), and monthly counts settle only from June 2025, so the window starts there and is shorter than two years.
  • Most work is issued as one combination permit for building, electrical, plumbing and mechanical work, and the file has no trade field, so the kind of work is read from the permit's description: a permit that names one trade counts under that trade, and a renovation that covers several counts as a remodel. Fire-protection, sign and antenna work counts as other.
  • Homes are the city's residential combination permits; commercial combination permits, including those for apartment buildings, count as other.
  • The value is the cost declared on the permit. The ZIP code comes from the city's property records for the permit's block and lot.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits by ZIP code in the City of Baltimore", https://contractorrecords.com/baltimore/zip/, data through September 2026, from Baltimore City Department of Housing & Community Development, Permits and Inspections building-permit records.

Link to a table: ZIP codes by permits.

Download the tables (CSV): ZIP codes by permits.

Common questions

  • Which ZIP code in Baltimore has the most building permits?21230, with 3,167 permits, June 2025 through September 2026; then 21218 (2,917).
  • Can I see the permits for one address in Baltimore?Not here: we publish permits by ZIP code without street addresses. The city keeps each property's permit history; search its records by address or permit number.