Contractor Records
Home › Buffalo › Electrical

Electrical permits in Buffalo, NY

Data through September 2026 · updated 18 Oct 2026

6,358 electrical permits were issued in Buffalo, October 2024 through September 2026: about 3,179 a year and 27% of all permits. 3,170 electrical permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 3,188 in the 12 months before. The busiest month is October. 14215 has the most, 980.

6,358permits issued
3,170last 12 months
Octbusiest month
$3,100usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 318Oct2024Nov 2024: 267Dec 2024: 238Jan 2025: 270Jan2025Feb 2025: 205Mar 2025: 223Apr 2025: 277May 2025: 248Jun 2025: 307Jul 2025: 307JulAug 2025: 247Sep 2025: 281Oct 2025: 373Nov 2025: 374Dec 2025: 370Jan 2026: 219Jan2026Feb 2026: 217Mar 2026: 212Apr 2026: 251May 2026: 207Jun 2026: 223Jul 2026: 233JulAug 2026: 237Sep 2026: 254
The same numbers as a table
MonthPermits
Oct 2024318
Nov 2024267
Dec 2024238
Jan 2025270
Feb 2025205
Mar 2025223
Apr 2025277
May 2025248
Jun 2025307
Jul 2025307
Aug 2025247
Sep 2025281
Oct 2025373
Nov 2025374
Dec 2025370
Jan 2026219
Feb 2026217
Mar 2026212
Apr 2026251
May 2026207
Jun 2026223
Jul 2026233
Aug 2026237
Sep 2026254

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (130), February the quietest (80). A busy month at the permit counter usually means a longer wait for a contractor.

January: 92 (100 = an average month)February: 80 (100 = an average month)March: 82 (100 = an average month)April: 100 (100 = an average month)May: 86 (100 = an average month)June: 100 (100 = an average month)July: 102 (100 = an average month)August: 91 (100 = an average month)September: 101 (100 = an average month)October: 130 (100 = an average month)130November: 121 (100 = an average month)December: 115 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January92
February80
March82
April100
May86
June100
July102
August91
September101
October130
November121
December115

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 5,580 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$3,100
Middle half$1,135–$4,500

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 6,358 electrical permits.

ZIP codePermitsShare
1421598015%
142115979%
142164978%
142144968%
142134798%
142074407%
142204247%
142063936%
142083255%
142103185%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most electrical permits in the City of Buffalo permit file, October 2024 through September 2026, with 5 or more each. Share is the part of all 6,358 electrical permits; 61% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Affordable Electric Services by Sapienza1,01516%
Zacher Electric2063%
Agi Electric LLC1613%
Diana Apartments, LLC1412%
Brady Electric Inc1372%
Gallagher Electric1372%
Sila Services, dba T-Mark Plumbing1252%
Huber Electric Inc1172%
PJC Construction881%
O.S. Electric, Inc841%

Download this table (CSV)

How these numbers are made

Source: City of Buffalo Open Data, Permits dataset 9p2d-f3yt, read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's public file has no permit status and no final inspection date, only an expiration date, so no finished share is shown.

Building, electrical, plumbing, heating, demolition and other construction permits the City of Buffalo Department of Permit and Inspection Services issues inside city limits. Special use and change of use permits in the same file are not counted. Buffalo's suburbs (Amherst, Cheektowaga, Tonawanda and the rest of Erie County) run their own permit offices and are not in this file.

  • The file has no permit status and no final inspection date, so we show neither a finished share nor time to final.
  • The value is the value of work written on the permit, not the final cost of the job.
  • General repair permits cover roofing, siding, porches and other exterior work; we sort them into roofing and the other kinds of work by the permit's description.
  • The contractor names come from the city's licensed contractors list, matched on the licence number on the permit; permits with no licence number, or one not on the list, name no firm here.
  • A house job can need separate building, electrical, plumbing and heating permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Buffalo, NY", https://contractorrecords.com/buffalo/electrical-permits, data through September 2026, from the City of Buffalo Department of Permit and Inspection Services building-permit records.

Link to a table: By month · Season · Declared value · By ZIP code · Most active contractors by permits filed.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: declared value · Electrical permits by ZIP code · Most active contractors by permits filed.

Common questions

  • How many electrical permits does Buffalo issue a year?About 3,179 a year in Buffalo: 6,358 permits issued October 2024 through September 2026, 3,170 of them in the last 12 months.
  • When do people in Buffalo file the most electrical permits?October (130 against an average month of 100); February is the quietest (80). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Buffalo?14215, with 980 of the 6,358 (15%); then 14211 (597).