Contractor Records
Home › Guides › Denver ADU rules since citywide ADUs: owner occupancy, the licensed-contractor rule, and what ADU permits were filed at

Denver ADU rules since citywide ADUs: owner occupancy, the licensed-contractor rule, and what ADU permits were filed at

Since 16 December 2024 Denver allows accessory dwelling units in every residential area, about 70% of the city's land against 36% before (Denver Community Planning and Development, read 23 October 2026), but the permit must be pulled by a licensed contractor, not the owner. Builders filed 262 ADU permits in Denver from October 2023 to September 2026, usually at $137,144.

By Contractor Records · data through October 16, 2026

The rules that matter before you call a builder

Rule What Denver says
Where Any zone district that allows a new single-unit dwelling; one ADU per primary dwelling unit
Owner occupancy In single-unit districts the owner must live in the main house when applying, unless both are built at once; since the 2024 change the ADU may still be used if the owner moves later
Who builds "ADUs must be built by a licensed contractor"; "Homeowners cannot apply for permits to build an ADU"
Size, height, setbacks Set per zone district in the Denver Zoning Code
Not allowed as an ADU Mobile homes, RVs, tiny homes on wheels, travel trailers
Driveway No separate driveway unless the new access is from an alley
Address The ADU gets its own address
Renting it short-term Short-term rentals, ADUs included, need a City license
HOAs The City does not review HOA rules; state law HB 24-1152 overrides HOA rules that prevent ADUs

Sources: the Citywide ADUs project page and the City's ADU permit page.

The permit, step by step

  1. Zoning, building and sewer use (SUDP) together. The contractor applies in E-permits under "New Accessory Dwelling Unit" and uploads the documents with the first application so all three reviews run at once.
  2. Survey only if construction is within three feet of a property line (improvement survey when structures exist).
  3. Soils report. The City's checklist for new homes and additions requires a current geotechnical soils report for new conditioned accessory structures and wherever expansive soils are likely (DRC R401.4). Budget for it in a detached ADU quote.
  4. Trade permits for electrical, plumbing, mechanical and roofing go through Quick Permits; since 22 May 2025 new construction needs an issued Residential Construction Permit first.
  5. Other approvals as they apply: a certificate of appropriateness in a landmark district, the City Forester for right-of-way or protected trees, a demolition permit for a garage you are replacing, and Denver Water, where "a new license may be required" and extra fees may apply.
  6. Certificate of Occupancy before anyone lives in it.

What 262 Denver ADU permits show

Measure Denver ADU
Permits, October 2023 to September 2026 262
Firms / active in the last year of data 162 / 77
Usual filed value $137,144
Middle half of builders' usual value (24 builders) $102,992 to $175,000
Builders with a single ADU permit 122 (75.3%)
Busiest / quietest month June (128) / February (68)

ADU building in Denver is spread thin: 75.3% of the firms on these permits filed only one. Most contractors you talk to will have built one or two, so ask for the address of a finished ADU and look up its permit and Certificate of Occupancy yourself. A detached ADU usually sits next to a garage rebuild or addition in the same file; compare Denver addition cost and Denver garage cost. Filed values by firm are on Denver ADU cost.

Compare Denver ADU builders by permits →

Related

Licenses: Denver contractor license lookup. Finding a permit by address: Denver building permit search. ADU or addition: ADU vs addition. Statewide licensing: checking a contractor license in Colorado.

What this does not tell you

Denver's records do not give a reliable close date for ADU permits, so we show no completion rate or timeline for them. Filed values are construction estimates on the application, not the final cost, and leave out tap fees and design. Zone district standards decide what fits on a given lot; check them with the City before paying for plans.

How we know this

Rules are from Denver Community Planning and Development's Citywide ADUs page, the ADU permit page and the Permitting Checklist for New Homes and Additions, all read 23 October 2026. Permit counts are City and County of Denver residential permits classified as ADUs, October 2023 to September 2026; the firm range uses builders with three or more ADU permits.

Numbers come from City and County of Denver residential construction and demolition permits, data through October 16, 2026. Nobody paid to be on this page and nobody can.

Questions

  • Are ADUs allowed everywhere in Denver?

    In all residential areas. City Council passed the Citywide ADUs measure on 18 November 2024 and it took effect on 16 December 2024, allowing ADUs on 70% of Denver's land, up from 36%. ADUs are allowed in every zone district that allows a new single-unit dwelling.

  • Do I have to live on the property to build an ADU in Denver?

    In single-unit zone districts, the owner must live in the main house when applying for the ADU permits, unless the house and ADU are built at the same time. Since the 2024 change, the ADU can still be used if the owner later moves away.

  • Can a homeowner pull an ADU permit in Denver?

    No. Denver's ADU permit page says ADUs must be built by a licensed contractor and homeowners cannot apply for the permits to build one.

  • How much does an ADU cost in Denver?

    The usual Denver ADU permit was filed at $137,144 (262 permits, October 2023 to September 2026), and the middle half of builders with three or more ADU permits usually filed between $102,992 and $175,000. That is construction value, before design, tap fees and soils work.

  • Can my HOA stop me from building an ADU in Denver?

    The City says it does not regulate or review HOA rules and tells owners in metro districts or HOAs to check their bylaws. The state law the measure implements, House Bill 24-1152, overrides HOA rules that prevent ADUs, according to Denver Community Planning and Development.

Build your own list

Every firm with that kind of permit on record. Pick what you value. The list moves.