Contractor Records
Home › Normal › Permit statistics

The Town of Normal, IL building permit statistics

Data through September 2026 · updated 20 Oct 2026

5,569 building permits issued in the Town of Normal, October 2024 through September 2026: about 2,784 a year. The biggest kind of work is remodels & repairs, with 1,269. 2,826 permits in the last 12 months (Oct 2025–Sep 2026), 3% more than the 2,743 in the 12 months before. 75% were permits for homes. The busiest month for permits is July.

5,569permits issued
2,826last 12 months
+3%vs the 12 months before
75%for homes
Julbusiest month
Sep 2026records through

By kind of work

Permits issued October 2024 through September 2026. Last 12 months is Oct 2025–Sep 2026; the 12 months before is Oct 2024–Sep 2025. Homes is the share issued as residential permits. Busiest month is the calendar month with the most permits on average.

Kind of workPermitsShareLast 12 mo12 mo beforeChangeHomesBusiest month
Remodels & repairs1,26923%425844−50%100%July
Plumbing1,07219%525547−4%77%February
HVAC98618%477509−6%81%June
Electrical95017%4744760%27%October
Roofing58911%5863+19433%97%April
Solar1773%9582+16%98%October
New homes1633%7093−25%100%April
Other2775%128149−14%7%May

Fewer than 100 permits, so no row: additions (34), demolition (21), garages, sheds & shade structures (18), pools & spas (13).

Download this table (CSV)

By year

Permits issued in each calendar year of the window. Per year scales a part year to 12 months.

YearMonthsPermitsPer year
2024 (from October)35092,036
2025122,9862,986
2026 (through September)92,0742,765

Download this table (CSV)

By month

Permits issued each month, October 2024 through September 2026. The tallest bar is the busiest month on file.

Oct 2024: 194Oct2024Nov 2024: 146Dec 2024: 169Jan 2025: 115Jan2025Feb 2025: 154Mar 2025: 151Apr 2025: 220May 2025: 270Jun 2025: 281Jul 2025: 404JulAug 2025: 328Sep 2025: 311Oct 2025: 327Nov 2025: 261Dec 2025: 164Jan 2026: 173Jan2026Feb 2026: 167Mar 2026: 231Apr 2026: 271May 2026: 256Jun 2026: 250Jul 2026: 232JulAug 2026: 250Sep 2026: 244
The same numbers as a table
MonthPermits
Oct 2024194
Nov 2024146
Dec 2024169
Jan 2025115
Feb 2025154
Mar 2025151
Apr 2025220
May 2025270
Jun 2025281
Jul 2025404
Aug 2025328
Sep 2025311
Oct 2025327
Nov 2025261
Dec 2025164
Jan 2026173
Feb 2026167
Mar 2026231
Apr 2026271
May 2026256
Jun 2026250
Jul 2026232
Aug 2026250
Sep 2026244

Download this table (CSV)

When each kind of work is filed

Permits by calendar month, 100 = an average month (the thin line), October 2024 through September 2026. Kinds of work do not all peak together. Each month is counted twice (once a year), so one unusual month still moves these numbers.

Remodels & repairs

1,269 permits · busiest July, quietest January

January: 26 (100 = an average month)February: 38 (100 = an average month)March: 59 (100 = an average month)April: 78 (100 = an average month)May: 83 (100 = an average month)June: 134 (100 = an average month)July: 212 (100 = an average month)212August: 171 (100 = an average month)September: 173 (100 = an average month)October: 122 (100 = an average month)November: 58 (100 = an average month)December: 47 (100 = an average month)JFMAMJJASOND

Plumbing

1,072 permits · busiest February, quietest January

January: 68 (100 = an average month)February: 126 (100 = an average month)126March: 87 (100 = an average month)April: 109 (100 = an average month)May: 114 (100 = an average month)June: 85 (100 = an average month)July: 107 (100 = an average month)August: 113 (100 = an average month)September: 109 (100 = an average month)October: 101 (100 = an average month)November: 84 (100 = an average month)December: 96 (100 = an average month)JFMAMJJASOND

HVAC

986 permits · busiest June, quietest September

January: 89 (100 = an average month)February: 71 (100 = an average month)March: 65 (100 = an average month)April: 101 (100 = an average month)May: 129 (100 = an average month)June: 139 (100 = an average month)139July: 133 (100 = an average month)August: 94 (100 = an average month)September: 51 (100 = an average month)October: 100 (100 = an average month)November: 125 (100 = an average month)December: 105 (100 = an average month)JFMAMJJASOND

Electrical

950 permits · busiest October, quietest January

January: 61 (100 = an average month)February: 67 (100 = an average month)March: 83 (100 = an average month)April: 95 (100 = an average month)May: 119 (100 = an average month)June: 97 (100 = an average month)July: 129 (100 = an average month)August: 112 (100 = an average month)September: 120 (100 = an average month)October: 136 (100 = an average month)136November: 100 (100 = an average month)December: 81 (100 = an average month)JFMAMJJASOND

Roofing

589 permits · busiest April, quietest December

January: 86 (100 = an average month)February: 31 (100 = an average month)March: 126 (100 = an average month)April: 181 (100 = an average month)181May: 134 (100 = an average month)June: 106 (100 = an average month)July: 79 (100 = an average month)August: 96 (100 = an average month)September: 159 (100 = an average month)October: 92 (100 = an average month)November: 92 (100 = an average month)December: 18 (100 = an average month)JFMAMJJASOND

Solar

177 permits · busiest October, quietest February

January: 68 (100 = an average month)February: 47 (100 = an average month)March: 68 (100 = an average month)April: 54 (100 = an average month)May: 81 (100 = an average month)June: 122 (100 = an average month)July: 88 (100 = an average month)August: 156 (100 = an average month)September: 149 (100 = an average month)October: 169 (100 = an average month)169November: 122 (100 = an average month)December: 75 (100 = an average month)JFMAMJJASOND

New homes

163 permits · busiest April, quietest September

January: 52 (100 = an average month)February: 44 (100 = an average month)March: 103 (100 = an average month)April: 191 (100 = an average month)191May: 110 (100 = an average month)June: 140 (100 = an average month)July: 96 (100 = an average month)August: 184 (100 = an average month)September: 37 (100 = an average month)October: 125 (100 = an average month)November: 52 (100 = an average month)December: 66 (100 = an average month)JFMAMJJASOND
The same numbers as a table
Kind of workJanFebMarAprMayJunJulAugSepOctNovDec
Remodels & repairs26385978831342121711731225847
Plumbing6812687109114851071131091018496
HVAC8971651011291391339451100125105
Electrical616783951199712911212013610081
Roofing86311261811341067996159929218
Solar68476854811228815614916912275
New homes524410319111014096184371255266

Download this table (CSV)

Homes and everything else

How the town classed each permit. Other covers commercial buildings, signs, towers and similar work.

Permit classPermitsShareLast 12 mo
Homes (residential)4,15475%2,127
Other1,41525%699

Download this table (CSV)

How Normal compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: Town of Normal GIS, OpenData/Permits_Public feature layer, read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The town's closeout is not consistently recorded: in every issue year only about a third of permits read Completed, however old, so no finished share is shown.

Residential and commercial building, HVAC, plumbing and electrical permits the Town of Normal issues inside town limits. Bloomington runs its own permit office and is not in this file.

  • The town's file starts in January 2022, when it moved to its current permit system.
  • The file has no final inspection date and no ZIP code, and only about a third of permits are marked Completed in every year, so we show no finished share, no time to final and no ZIP code pages.
  • The value is the valuation written on the permit, not the final cost of the job.
  • Electrical service permits (new and replacement services) don't say whether the property is a home, so they are not counted as residential.
  • A new house gets separate building, HVAC, plumbing and electrical permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "The Town of Normal, IL building permit statistics", https://contractorrecords.com/normal-il/permit-statistics, data through September 2026, from the Town of Normal Inspections Division building-permit records.

Link to a table: By kind of work · By year · By month · When each kind of work is filed · Homes and everything else.

Download the tables (CSV): Permits by kind of work · Permits by year · Permits by month · Permits by calendar month (index) · Homes and other permits.

Common questions

  • How many building permits does Normal issue a year?About 2,784 a year in the Town of Normal: 5,569 permits over 24 months, October 2024 through September 2026. 2,826 permits in the last 12 months (Oct 2025–Sep 2026), 3% more than the 2,743 in the 12 months before.
  • Are building permits up or down in Normal?2,826 permits in the last 12 months (Oct 2025–Sep 2026), 3% more than the 2,743 in the 12 months before. Roofing permits grew most (3 to 586); remodel and repair permits fell most (844 to 425).
  • What is the busiest month for permits in Normal?July, counting every kind of work (137 against an average month of 100). January is the quietest (62). Each kind of work has its own season; the charts above show them.
  • What share of Normal permits are for homes?75%: 4,154 of the 5,569 permits issued October 2024 through September 2026 were residential permits.