Contractor Records
Provo › Firms › Spring Solar, LLC
SP

Spring Solar, LLC: building permits in Provo, UT

Spring Solar, LLC pulled 18 building permits in Provo, UT from May 2024 to Sep 2026, 9 in the last 12 months, across 1 trade (solar). Top 1 of 40 for solar in Provo · name on permits: SPRING SOLAR, LLC

18matching permits
9last 12 months
1trade
Moderateevidence strength

Building permits by Spring Solar, LLC

TradePermitsLast 12 moUsual filed valuevs tradeActiveEvidenceList position
Solar189$14k0.61× the usual for the tradeMay 2024 – Sep 2026Moderate#1 of 40

List position: where the firm lands on the Provo comparison for that trade at default settings (or at a typical budget), among firms without a license problem. It's a match score from public records, not a quality rating.

Filed value is what was written on the permit, not a quote or final bill. Some jobs never need a permit.

License

Complaints, lawsuits and the permit record

Our record covers building permits, not complaints or court cases. In Provo, UT, Spring Solar, LLC pulled 18 permits 2024–2026; about 31% of those old enough to judge reached completion, and 6 of 11 permits a year or more old are still open. To check complaints and lawsuits, search Utah DOPL (Utah DOPL license lookup), BBB complaints for Spring Solar, LLC and Utah County court records.

We never say whether a complaint or lawsuit exists: we do not hold those records.

Questions

Where Spring Solar, LLC works

The ZIP codes where Spring Solar, LLC filed the most of its 18 permits on homes in Provo, counted at each property's ZIP code. A ZIP code opens every permit we track there and the most active firms in each trade.

Provo permits by ZIP code →

Similar solar installers in Provo

The 5 solar installers closest to Spring Solar, LLC's 18 solar permits. Similar volume, not similar quality.

Compare all Provo solar installers →

Compare Spring Solar, LLC with other Provo solar contractors

Every permit record in the city, side by side. Pick what you value. The list moves.

Source: public permit records (Provo), matched by contractor name. How the records work. Something wrong? Firms can request a correction.