Contractor Records
Home › Auburn › ZIP 98002

Building permits in 98002, the City of Auburn

Data through January 2025 · updated 19 Oct 2026

1,335 building permits were issued in ZIP code 98002 by City of Auburn Community Development, February 2023 through January 2025: 35% of the 3,821 in the City of Auburn, the 2nd busiest ZIP code. HVAC permits lead with 503. 611 permits in the last 12 months on file (Feb 2024–Jan 2025), 16% fewer than the 724 in the 12 months before. Permits from a city that runs its own permit office are not counted.

1,335permits in 98002
611last 12 months on file
55%for homes
63days, usual issue to final
Jan 2025records through

Permits in 98002 by kind of work

Share here is the part of the 1,335 permits in 98002; citywide is the same for all of the City of Auburn.

Kind of workPermitsShare hereCitywide
HVAC50338%43%
Plumbing28521%17%
Solar675%4%
Remodels & repairs524%2%
Demolition322%2%
Garages, sheds & shade structures242%2%
Roofing222%1%
Additions141%1%
New homes7under 1%3%
Fences & walls5under 1%4%
ADUs & casitas4under 1%under 1%
Other32024%20%

Download this table (CSV)

Permits in 98002 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2023 (from February)11684746
202412603603
2025 (through January)148576

Download this table (CSV)

How permits in 98002 finish

Permits issued Feb 2023–Jan 2024, at least 12 months before the file ends.

Measure98002Citywide
Permits issued Feb 2023–Jan 20247241,937
Finished67.5%69.4%
Expired6.8%6.1%
Usual days, issue to final6363

Download this table (CSV)

How these numbers are made

Source: City of Auburn open data, Permits (Socrata fted-8bve), read 19 Oct 2026. We count permits issued February 2023 through January 2025; denied and withdrawn permits are left out.

Building, mechanical, plumbing, side-sewer, demolition, fire-protection and sign permits issued by the City of Auburn for property inside city limits, in both its King County and Pierce County parts (Lea Hill, Lakeland Hills, West Hill and downtown). Electrical permits are issued by the Washington State Department of Labor & Industries and are not in this file. Unincorporated King County permits (the separate King County page) and neighbouring cities such as Kent, Federal Way, Algona and Pacific are not in this file. Street, utility, storm, grading and right-of-way permits are left out.

  • The city's open-data file stopped updating on 25 February 2025, so the window ends in January 2025, the last full month on file. Statuses are as of that date: permits finaled later still show as open.
  • The file has no declared job value, so we show no costs.
  • Electrical permits in Washington are issued by the state Department of Labor & Industries, not the city, so there is no electrical count here.
  • A final date is the city's finaled date, used only when the permit's status says finaled. For permits that were not finaled the file repeats the extract date, which we ignore.
  • Over-the-counter mechanical permits (furnaces, heat pumps, gas piping and gas appliances) count as HVAC; they carry no description, so water heaters filed as mechanical permits count there too.
  • Over-the-counter trade permits count as homes when the county parcel record shows a house, duplex, townhouse, condominium or mobile home on the lot.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 98002, the City of Auburn", https://contractorrecords.com/auburn-wa/zip/98002, data through January 2025, from City of Auburn Community Development building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 98002 by kind of work · Permits in 98002 by year · Permits in 98002: finished and days to final.

Common questions

  • How many building permits were issued in 98002?1,335 permits issued by the city in ZIP code 98002, February 2023 through January 2025: 503 HVAC, 285 plumbing, 67 solar. 611 were in the last 12 months on file (to January 2025).
  • What is built most in 98002?HVAC: 503 of the 1,335 permits (38%), against 43% citywide.
  • How long does a permit take in 98002?The usual permit issued here Feb 2023–Jan 2024 took 63 days from issue to final (488 permits with a final date), against 63 days citywide.
  • Who did the work in 98002?The city's file names contractors, but the file has no job value, so we only count permits per firm and don't rate, rank or profile firms from it, so we don't list them by ZIP code. Ask a contractor for the permit numbers of past jobs and check them with the city.