Contractor Records
Home › Auburn › Plumbing

Plumbing permits in the City of Auburn, WA

Data through January 2025 · updated 19 Oct 2026

665 plumbing permits were issued in the City of Auburn, February 2023 through January 2025: about 332 a year and 17% of all permits. 344 plumbing permits in the last 12 months on file (Feb 2024–Jan 2025), 7% more than the 321 in the 12 months before. The busiest month is January. The usual one took 82 days from issue to the city's final. 98002 has the most, 285.

665permits issued
344last 12 months on file
Janbusiest month
82days, usual issue to final
79%finished
Jan 2025records through

Plumbing permits by month

Permits issued each month, February 2023 through January 2025.

Feb 2023: 28Feb2023Mar 2023: 30Apr 2023: 17May 2023: 29Jun 2023: 26Jul 2023: 29JulAug 2023: 36Sep 2023: 34Oct 2023: 17Nov 2023: 21Dec 2023: 19Jan 2024: 35Jan2024Feb 2024: 30Mar 2024: 32Apr 2024: 32May 2024: 44Jun 2024: 29Jul 2024: 23JulAug 2024: 23Sep 2024: 13Oct 2024: 28Nov 2024: 15Dec 2024: 32Jan 2025: 43Jan2025
The same numbers as a table
MonthPermits
Feb 202328
Mar 202330
Apr 202317
May 202329
Jun 202326
Jul 202329
Aug 202336
Sep 202334
Oct 202317
Nov 202321
Dec 202319
Jan 202435
Feb 202430
Mar 202432
Apr 202432
May 202444
Jun 202429
Jul 202423
Aug 202423
Sep 202413
Oct 202428
Nov 202415
Dec 202432
Jan 202543

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). January is the busiest (141), November the quietest (65). A busy month at the permit counter usually means a longer wait for a contractor.

January: 141 (100 = an average month)141February: 105 (100 = an average month)March: 112 (100 = an average month)April: 88 (100 = an average month)May: 132 (100 = an average month)June: 99 (100 = an average month)July: 94 (100 = an average month)August: 106 (100 = an average month)September: 85 (100 = an average month)October: 81 (100 = an average month)November: 65 (100 = an average month)December: 92 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January141
February105
March112
April88
May132
June99
July94
August106
September85
October81
November65
December92

Download this table (CSV)

How long a plumbing permit takes

Permits issued Feb 2023–Jan 2024, at least 12 months before the file ends. Usual days is the middle permit among the 255 with a final date.

MeasureValue
Permits issued Feb 2023–Jan 2024321
Finished79.4%
Expired1.2%
Usual days, issue to final82
Middle half, days13–188

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 665 plumbing permits.

ZIP codePermitsShare
9800228543%
9809219930%
9800117326%
980323under 1%
983913under 1%
983751under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Plumbing - Over The Counter26340%
Plumbing - Commercial13620%
Plumbing - Residential10916%
Sewer - Repair8212%
Sewer - New Connection589%
Sewer - Relocate/Replace81%
Mechanical - Commercial5under 1%
Sewer - Grinder Pump2under 1%
Mechanical - Over The Counter2under 1%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most plumbing permits in the City of Auburn open data file, February 2023 through January 2025, with 5 or more each. Share is the part of all 665 plumbing permits; 87% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Fast Water Heater Company457%
Peltram Plumbing LLC294%
JJ Plumbing LLC274%
Preventative Plumbing Solutions LLC264%
Rescue Rooter203%
Pacific Bath Company162%
Re-Bath of Seattle152%
KB Home112%
Roto Rooter Services Co102%
Repipe Plumbing Solutions LLC91%

Download this table (CSV)

Other kinds of work here

How Auburn compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in Seattle and Puget Sound. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Auburn open data, Permits (Socrata fted-8bve), read 19 Oct 2026. We count permits issued February 2023 through January 2025; denied and withdrawn permits are left out.

Building, mechanical, plumbing, side-sewer, demolition, fire-protection and sign permits issued by the City of Auburn for property inside city limits, in both its King County and Pierce County parts (Lea Hill, Lakeland Hills, West Hill and downtown). Electrical permits are issued by the Washington State Department of Labor & Industries and are not in this file. Unincorporated King County permits (the separate King County page) and neighbouring cities such as Kent, Federal Way, Algona and Pacific are not in this file. Street, utility, storm, grading and right-of-way permits are left out.

  • The city's open-data file stopped updating on 25 February 2025, so the window ends in January 2025, the last full month on file. Statuses are as of that date: permits finaled later still show as open.
  • The file has no declared job value, so we show no costs.
  • Electrical permits in Washington are issued by the state Department of Labor & Industries, not the city, so there is no electrical count here.
  • A final date is the city's finaled date, used only when the permit's status says finaled. For permits that were not finaled the file repeats the extract date, which we ignore.
  • Over-the-counter mechanical permits (furnaces, heat pumps, gas piping and gas appliances) count as HVAC; they carry no description, so water heaters filed as mechanical permits count there too.
  • Over-the-counter trade permits count as homes when the county parcel record shows a house, duplex, townhouse, condominium or mobile home on the lot.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in the City of Auburn, WA", https://contractorrecords.com/auburn-wa/plumbing-permits, data through January 2025, from City of Auburn Community Development building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits by ZIP code · Plumbing permits by permit type · Most active contractors by permits filed.

Common questions

  • How many plumbing permits does Auburn issue a year?About 332 a year in the City of Auburn: 665 permits issued February 2023 through January 2025, 344 of them in the last 12 months on file (to January 2025).
  • How long does a plumbing permit take in Auburn?The usual one took 82 days from issue to the city's final inspection, and the middle half took 13 to 188 days (255 permits issued Feb 2023–Jan 2024 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Auburn file the most plumbing permits?January (141 against an average month of 100); November is the quietest (65). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Auburn?98002, with 285 of the 665 (43%); then 98092 (199).