Garage, shed and shade structure permits in the City of Baltimore, MD

Data through September 2026 · updated 18 Oct 2026

435 garage, shed and shade structure permits were issued in the City of Baltimore, June 2025 through September 2026: about 326 a year and 1% of all permits. The busiest month is April. 21230 has the most, 99.

435permits issued
324last 12 months
Aprbusiest month
$8,500usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, June 2025 through September 2026.

Jun 2025: 19Jun2025Jul 2025: 40JulAug 2025: 27Sep 2025: 25Oct 2025: 24Nov 2025: 23Dec 2025: 21Jan 2026: 26Jan2026Feb 2026: 15Mar 2026: 23Apr 2026: 39May 2026: 26Jun 2026: 44Jul 2026: 22JulAug 2026: 25Sep 2026: 36
The same numbers as a table
MonthPermits
Jun 202519
Jul 202540
Aug 202527
Sep 202525
Oct 202524
Nov 202523
Dec 202521
Jan 202626
Feb 202615
Mar 202623
Apr 202639
May 202626
Jun 202644
Jul 202622
Aug 202625
Sep 202636

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (143), February the quietest (55). A busy month at the permit counter usually means a longer wait for a contractor.

January: 96 (100 = an average month)February: 55 (100 = an average month)March: 85 (100 = an average month)April: 143 (100 = an average month)143May: 96 (100 = an average month)June: 116 (100 = an average month)July: 114 (100 = an average month)August: 96 (100 = an average month)September: 112 (100 = an average month)October: 88 (100 = an average month)November: 85 (100 = an average month)December: 77 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January96
February55
March85
April143
May96
June116
July114
August96
September112
October88
November85
December77

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 391 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$8,500
Middle half$4,000–$18,000

Download this table (CSV)

ZIP codes with the most garage, shed and shade structure permits

Counted at the property's ZIP code. Share is the part of the city's 435 garage, shed and shade structure permits.

ZIP codePermitsShare
212309923%
21218379%
21224327%
21206235%
21229225%
21214225%
21210215%
21212215%
21215205%
21211194%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential combination40693%
Combination building (old system)297%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Baltimore. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Open Baltimore: Housing and Building Permits 2019-Present (DHCD, ArcGIS layer Building Permits), read 18 Oct 2026. We count permits issued June 2025 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building and demolition permits the City of Baltimore issues inside city limits: combination permits for homes and for commercial buildings (which cover building, electrical, plumbing and mechanical work in one permit) and demolition (razing) permits. Use-and-occupancy permits, temporary event permits, zoning appeals, permit modifications and extensions of earlier permits in the same file are not counted. Baltimore County, which surrounds the city, is a separate jurisdiction with its own permit office and is not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Baltimore.
  • The file has no status and no final inspection date, so we show no finished share and no time to final; every permit is listed as open.
  • The city moved to a new permit system in early 2025 (permit numbers changed from COM to BRCM and BCCM, and February 2025 has almost no permits), and monthly counts settle only from June 2025, so the window starts there and is shorter than two years.
  • Most work is issued as one combination permit for building, electrical, plumbing and mechanical work, and the file has no trade field, so the kind of work is read from the permit's description: a permit that names one trade counts under that trade, and a renovation that covers several counts as a remodel. Fire-protection, sign and antenna work counts as other.
  • Homes are the city's residential combination permits; commercial combination permits, including those for apartment buildings, count as other.
  • The value is the cost declared on the permit. The ZIP code comes from the city's property records for the permit's block and lot.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in the City of Baltimore, MD", https://contractorrecords.com/baltimore/accessory-permits, data through September 2026, from Baltimore City Department of Housing & Community Development, Permits and Inspections building-permit records.

Link to a table: By month · Season · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by ZIP code · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Baltimore issue a year?About 326 a year in the City of Baltimore: 435 permits issued June 2025 through September 2026, 324 of them in the last 12 months.
  • When do people in Baltimore file the most garage, shed and shade structure permits?April (143 against an average month of 100); February is the quietest (55). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most garage, shed and shade structure permits in Baltimore?21230, with 99 of the 435 (23%); then 21218 (37).