Contractor Records
Home › Baltimore › Demolition

Demolition permits in the City of Baltimore, MD

Data through September 2026 · updated 18 Oct 2026

226 demolition permits were issued in the City of Baltimore, June 2025 through September 2026: about 170 a year and under 1% of all permits. The busiest month is March. 21223 has the most, 35.

226permits issued
136last 12 months
Marbusiest month
Sep 2026records through

Demolition permits by month

Permits issued each month, June 2025 through September 2026.

Jun 2025: 11Jun2025Jul 2025: 20JulAug 2025: 29Sep 2025: 30Oct 2025: 21Nov 2025: 12Dec 2025: 14Jan 2026: 14Jan2026Feb 2026: 5Mar 2026: 29Apr 2026: 8May 2026: 1Jun 2026: 8Jul 2026: 7JulAug 2026: 7Sep 2026: 10
The same numbers as a table
MonthPermits
Jun 202511
Jul 202520
Aug 202529
Sep 202530
Oct 202521
Nov 202512
Dec 202514
Jan 202614
Feb 20265
Mar 202629
Apr 20268
May 20261
Jun 20268
Jul 20267
Aug 20267
Sep 202610

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (205), May the quietest (7). A busy month at the permit counter usually means a longer wait for a contractor.

January: 99 (100 = an average month)February: 35 (100 = an average month)March: 205 (100 = an average month)205April: 57 (100 = an average month)May: 7 (100 = an average month)June: 67 (100 = an average month)July: 96 (100 = an average month)August: 127 (100 = an average month)September: 142 (100 = an average month)October: 149 (100 = an average month)November: 85 (100 = an average month)December: 99 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January99
February35
March205
April57
May7
June67
July96
August127
September142
October149
November85
December99

Download this table (CSV)

ZIP codes with the most demolition permits

Counted at the property's ZIP code. Share is the part of the city's 226 demolition permits.

ZIP codePermitsShare
212233515%
212173515%
212162511%
212182310%
21215136%
21202125%
21213115%
21211104%
2123094%
2120184%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Demolition17678%
Demolition (old system)3515%
Residential combination84%
Commercial combination42%
Combination building (old system)31%

Download this table (CSV)

Nearby permit data

Demolition permits for other places in Baltimore. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Open Baltimore: Housing and Building Permits 2019-Present (DHCD, ArcGIS layer Building Permits), read 18 Oct 2026. We count permits issued June 2025 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Building and demolition permits the City of Baltimore issues inside city limits: combination permits for homes and for commercial buildings (which cover building, electrical, plumbing and mechanical work in one permit) and demolition (razing) permits. Use-and-occupancy permits, temporary event permits, zoning appeals, permit modifications and extensions of earlier permits in the same file are not counted. Baltimore County, which surrounds the city, is a separate jurisdiction with its own permit office and is not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Baltimore.
  • The file has no status and no final inspection date, so we show no finished share and no time to final; every permit is listed as open.
  • The city moved to a new permit system in early 2025 (permit numbers changed from COM to BRCM and BCCM, and February 2025 has almost no permits), and monthly counts settle only from June 2025, so the window starts there and is shorter than two years.
  • Most work is issued as one combination permit for building, electrical, plumbing and mechanical work, and the file has no trade field, so the kind of work is read from the permit's description: a permit that names one trade counts under that trade, and a renovation that covers several counts as a remodel. Fire-protection, sign and antenna work counts as other.
  • Homes are the city's residential combination permits; commercial combination permits, including those for apartment buildings, count as other.
  • The value is the cost declared on the permit. The ZIP code comes from the city's property records for the permit's block and lot.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in the City of Baltimore, MD", https://contractorrecords.com/baltimore/demolition-permits, data through September 2026, from Baltimore City Department of Housing & Community Development, Permits and Inspections building-permit records.

Link to a table: By month · Season · By ZIP code · Permit types.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits by ZIP code · Demolition permits by permit type.

Common questions

  • How many demolition permits does Baltimore issue a year?About 170 a year in the City of Baltimore: 226 permits issued June 2025 through September 2026, 136 of them in the last 12 months.
  • When do people in Baltimore file the most demolition permits?March (205 against an average month of 100); May is the quietest (7). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most demolition permits in Baltimore?21223, with 35 of the 226 (15%); then 21217 (35).