Electrical permits in Baton Rouge and East Baton Rouge Parish, LA

Data through September 2026 · updated 19 Oct 2026

2,516 electrical permits were issued in Baton Rouge and East Baton Rouge Parish, October 2024 through September 2026: about 1,258 a year and 24% of all permits. 1,055 electrical permits in the last 12 months (Oct 2025–Sep 2026), 28% fewer than the 1,461 in the 12 months before. The busiest month is October. 70808 has the most, 345.

2,516permits issued
1,055last 12 months
Octbusiest month
$2,500usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 190Oct2024Nov 2024: 119Dec 2024: 93Jan 2025: 103Jan2025Feb 2025: 125Mar 2025: 123Apr 2025: 121May 2025: 109Jun 2025: 124Jul 2025: 131JulAug 2025: 122Sep 2025: 101Oct 2025: 91Nov 2025: 57Dec 2025: 66Jan 2026: 68Jan2026Feb 2026: 60Mar 2026: 83Apr 2026: 90May 2026: 84Jun 2026: 109Jul 2026: 131JulAug 2026: 111Sep 2026: 105
The same numbers as a table
MonthPermits
Oct 2024190
Nov 2024119
Dec 202493
Jan 2025103
Feb 2025125
Mar 2025123
Apr 2025121
May 2025109
Jun 2025124
Jul 2025131
Aug 2025122
Sep 2025101
Oct 202591
Nov 202557
Dec 202566
Jan 202668
Feb 202660
Mar 202683
Apr 202690
May 202684
Jun 2026109
Jul 2026131
Aug 2026111
Sep 2026105

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (134), December the quietest (76). A busy month at the permit counter usually means a longer wait for a contractor.

January: 82 (100 = an average month)February: 88 (100 = an average month)March: 98 (100 = an average month)April: 101 (100 = an average month)May: 92 (100 = an average month)June: 111 (100 = an average month)July: 125 (100 = an average month)August: 111 (100 = an average month)September: 98 (100 = an average month)October: 134 (100 = an average month)134November: 84 (100 = an average month)December: 76 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January82
February88
March98
April101
May92
June111
July125
August111
September98
October134
November84
December76

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 2,362 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$2,500
Middle half$1,000–$12,625

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 2,516 electrical permits.

ZIP codePermitsShare
7080834514%
7080625710%
7081525410%
708052379%
708162088%
708021978%
708091285%
708071215%
708141195%
707911004%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical Permit (R)1,39555%
Generator Permit (R)61725%
Electrical Permit (C)42217%
Generator Permit (C)823%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most electrical permits in the EBR Building Permits file, October 2024 through September 2026, with 5 or more each. Share is the part of all 2,516 electrical permits; 72% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Optimize Solutions, LLC25010%
Accutemp Service Corporation542%
Joseph Matthews Enterprises LLC462%
Digirolamo Electric, LLC452%
Cajun Electric L.L.C.402%
HMC Generators, L.L.C.392%
Accutemp321%
Steadfast Electric, LLC301%
Nicotri Electric, Inc.281%
McLeod Electric LLC271%

Download this table (CSV)

How these numbers are made

Source: Open Data BR, EBR Building Permits (7fq7-8j7r), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city-parish's public file has no permit status and no final inspection or completion date, so no finished share is shown.

Construction permits the consolidated City of Baton Rouge / Parish of East Baton Rouge issues: the City of Baton Rouge and the parish's unincorporated areas. Occupancy permits, short-term rental registrations, complaints and land clearing permits in the same file are not counted.

  • The file has no permit status and no final inspection or completion date, so we show neither a finished share nor time to final.
  • The value is the project value written on the permit, not the final cost of the job. Demolition permits carry no value.
  • The file names a contractor on about three in four of the permits counted here: nine in ten new home, roofing and pool permits, about half of plumbing, gas, fence and demolition permits.
  • A new house gets separate building, electrical, plumbing, gas and mechanical permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Baton Rouge and East Baton Rouge Parish, LA", https://contractorrecords.com/baton-rouge/electrical-permits, data through September 2026, from the City of Baton Rouge / Parish of East Baton Rouge Department of Development building-permit records.

Link to a table: By month · Season · Declared value · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: declared value · Electrical permits by ZIP code · Electrical permits by permit type · Most active contractors by permits filed.

Common questions

  • How many electrical permits does Baton Rouge issue a year?About 1,258 a year in Baton Rouge and East Baton Rouge Parish: 2,516 permits issued October 2024 through September 2026, 1,055 of them in the last 12 months.
  • When do people in Baton Rouge file the most electrical permits?October (134 against an average month of 100); December is the quietest (76). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Baton Rouge?70808, with 345 of the 2,516 (14%); then 70806 (257).