Roofing permits in the City of Brownsville, TX

Data through March 2026 · updated 23 Oct 2026

585 roofing permits were issued in the City of Brownsville, April 2024 through March 2026: about 292 a year and 18% of all permits. 273 roofing permits in the last 12 months on file (Apr 2025–Mar 2026), 12% fewer than the 312 in the 12 months before. The busiest month is April. 78526 has the most, 207.

What this file covers: The report lists the city's building permits issued from July 2023 to March 2026; it holds no separate electrical, plumbing or mechanical permits, so those trades are missing.

585permits issued
273last 12 months on file
Aprbusiest month
Mar 2026records through

Roofing permits by month

Permits issued each month, April 2024 through March 2026.

Apr 2024: 32Apr2024May 2024: 21Jun 2024: 28Jul 2024: 27JulAug 2024: 38Sep 2024: 32Oct 2024: 31Nov 2024: 17Dec 2024: 25Jan 2025: 22Jan2025Feb 2025: 15Mar 2025: 24Apr 2025: 41May 2025: 22Jun 2025: 14Jul 2025: 30JulAug 2025: 23Sep 2025: 23Oct 2025: 17Nov 2025: 17Dec 2025: 25Jan 2026: 22Jan2026Feb 2026: 19Mar 2026: 20
The same numbers as a table
MonthPermits
Apr 202432
May 202421
Jun 202428
Jul 202427
Aug 202438
Sep 202432
Oct 202431
Nov 202417
Dec 202425
Jan 202522
Feb 202515
Mar 202524
Apr 202541
May 202522
Jun 202514
Jul 202530
Aug 202523
Sep 202523
Oct 202517
Nov 202517
Dec 202525
Jan 202622
Feb 202619
Mar 202620

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (150), February the quietest (70). A busy month at the permit counter usually means a longer wait for a contractor.

January: 90 (100 = an average month)February: 70 (100 = an average month)March: 90 (100 = an average month)April: 150 (100 = an average month)150May: 88 (100 = an average month)June: 86 (100 = an average month)July: 117 (100 = an average month)August: 125 (100 = an average month)September: 113 (100 = an average month)October: 98 (100 = an average month)November: 70 (100 = an average month)December: 103 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January90
February70
March90
April150
May88
June86
July117
August125
September113
October98
November70
December103

Download this table (CSV)

ZIP codes with the most roofing permits

Counted at the property's ZIP code. Share is the part of the city's 585 roofing permits.

ZIP codePermitsShare
7852620735%
7852019834%
7852117630%
785663under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Roofing50686%
Commercial Roofing7413%
Residential Repairs5under 1%

Download this table (CSV)

Other kinds of work here

How these numbers are made

Source: City of Brownsville GIS, Accela Permits Report 03312026 (ArcGIS Online), read 23 Oct 2026. We count permits issued April 2024 through March 2026; denied and withdrawn permits are left out. The city's report lists issued permits only, with no status and no final date, so no finished share is shown.

Building permits the City of Brownsville issues inside city limits, as listed in a report from its Accela permit system: new houses and duplexes, re-roofs, repairs, alterations, additions, pools, solar, accessory structures, demolition, house moving, commercial and multi-family construction and signs. The report holds no separate electrical, plumbing or mechanical permits. Unincorporated Cameron County and other cities (Olmito, Los Fresnos, San Benito) are permitted by other offices.

  • The city's report names no contractor, so there are no contractor lists, rankings or firm pages for Brownsville.
  • The report is a one-off export dated March 31, 2026, so these pages end with March 2026.
  • It lists issued permits only, with no status, no final inspection date and no job value, so there is no finished share, no time to final and no costs.
  • Electrical, plumbing and mechanical permits are not in the report; the few repair permits that describe that kind of work are counted under those trades.
  • Homes are the report's residential permits; multi-family buildings count as other. The ZIP code is read from the end of each permit's address.
  • A permit number the report lists twice (usually a reissue) is counted once, at its first issue date.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in the City of Brownsville, TX", https://contractorrecords.com/brownsville/roofing-permits, data through March 2026, from City of Brownsville Building Inspections building-permit records.

Link to a table: By month · Season · By ZIP code · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits by ZIP code · Roofing permits by permit type.

Common questions

  • How many roofing permits does Brownsville issue a year?About 292 a year in the City of Brownsville: 585 permits issued April 2024 through March 2026, 273 of them in the last 12 months on file (to March 2026).
  • When do people in Brownsville file the most roofing permits?April (150 against an average month of 100); February is the quietest (70). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most roofing permits in Brownsville?78526, with 207 of the 585 (35%); then 78520 (198).