Contractor Records
Home › Brownsville › Permit statistics

The City of Brownsville, TX building permit statistics

Data through March 2026 · updated 23 Oct 2026

3,268 building permits issued in the City of Brownsville, April 2024 through March 2026: about 1,634 a year. The biggest kind of work is new homes, with 1,608. 1,710 permits in the last 12 months on file (Apr 2025–Mar 2026), 10% more than the 1,558 in the 12 months before. 79% were permits for homes. The busiest month for permits is April.

What this file covers: The report lists the city's building permits issued from July 2023 to March 2026; it holds no separate electrical, plumbing or mechanical permits, so those trades are missing.

3,268permits issued
1,710last 12 months on file
+10%vs the 12 months before
79%for homes
Aprbusiest month
Mar 2026records through

By kind of work

Permits issued April 2024 through March 2026. Last 12 months on file is Apr 2025–Mar 2026; the 12 months before is Apr 2024–Mar 2025. Homes is the share issued as residential permits. Busiest month is the calendar month with the most permits on average.

Kind of workPermitsShareLast 12 mo12 mo beforeChangeHomesBusiest month
New homes1,60849%824784+5%100%March
Roofing58518%273312−12%87%April
Remodels & repairs1274%7354+35%100%July
Other62519%352273+29%5%May

Fewer than 100 permits, so no row: pools & spas (83), solar (67), demolition (63), additions (59), garages, sheds & shade structures (26), fences & walls (15), plumbing (9), electrical (1).

Download this table (CSV)

By year

Permits issued in each calendar year of the window. Per year scales a part year to 12 months.

YearMonthsPermitsPer year
2024 (from April)91,1491,532
2025121,6911,691
2026 (through March)34281,712

Download this table (CSV)

By month

Permits issued each month, April 2024 through March 2026. The tallest bar is the busiest month on file.

Apr 2024: 169Apr2024May 2024: 157Jun 2024: 110Jul 2024: 130JulAug 2024: 177Sep 2024: 107Oct 2024: 126Nov 2024: 74Dec 2024: 99Jan 2025: 139Jan2025Feb 2025: 134Mar 2025: 136Apr 2025: 173May 2025: 164Jun 2025: 124Jul 2025: 155JulAug 2025: 113Sep 2025: 160Oct 2025: 116Nov 2025: 114Dec 2025: 163Jan 2026: 128Jan2026Feb 2026: 121Mar 2026: 179
The same numbers as a table
MonthPermits
Apr 2024169
May 2024157
Jun 2024110
Jul 2024130
Aug 2024177
Sep 2024107
Oct 2024126
Nov 202474
Dec 202499
Jan 2025139
Feb 2025134
Mar 2025136
Apr 2025173
May 2025164
Jun 2025124
Jul 2025155
Aug 2025113
Sep 2025160
Oct 2025116
Nov 2025114
Dec 2025163
Jan 2026128
Feb 2026121
Mar 2026179

Download this table (CSV)

When each kind of work is filed

Permits by calendar month, 100 = an average month (the thin line), April 2024 through March 2026. Kinds of work do not all peak together. Each month is counted twice (once a year), so one unusual month still moves these numbers.

New homes

1,608 permits · busiest March, quietest November

January: 102 (100 = an average month)February: 96 (100 = an average month)March: 139 (100 = an average month)139April: 130 (100 = an average month)May: 133 (100 = an average month)June: 81 (100 = an average month)July: 97 (100 = an average month)August: 96 (100 = an average month)September: 90 (100 = an average month)October: 84 (100 = an average month)November: 63 (100 = an average month)December: 90 (100 = an average month)JFMAMJJASOND

Roofing

585 permits · busiest April, quietest February

January: 90 (100 = an average month)February: 70 (100 = an average month)March: 90 (100 = an average month)April: 150 (100 = an average month)150May: 88 (100 = an average month)June: 86 (100 = an average month)July: 117 (100 = an average month)August: 125 (100 = an average month)September: 113 (100 = an average month)October: 98 (100 = an average month)November: 70 (100 = an average month)December: 103 (100 = an average month)JFMAMJJASOND

Remodels & repairs

127 permits · busiest July, quietest May

January: 76 (100 = an average month)February: 85 (100 = an average month)March: 57 (100 = an average month)April: 123 (100 = an average month)May: 47 (100 = an average month)June: 76 (100 = an average month)July: 208 (100 = an average month)208August: 142 (100 = an average month)September: 132 (100 = an average month)October: 57 (100 = an average month)November: 94 (100 = an average month)December: 104 (100 = an average month)JFMAMJJASOND
The same numbers as a table
Kind of workJanFebMarAprMayJunJulAugSepOctNovDec
New homes1029613913013381979690846390
Roofing90709015088861171251139870103
Remodels & repairs76855712347762081421325794104

Download this table (CSV)

Homes and everything else

How the city classed each permit. Other covers commercial buildings, signs, towers and similar work.

Permit classPermitsShareLast 12 mo
Homes (residential)2,57979%1,331
Other68921%379

Download this table (CSV)

By ZIP code

The 10 ZIP codes with the most permits, counted at the property's ZIP code. A ZIP code can cross into a city that runs its own permit office; only the city's permits are counted.

ZIP codePermitsShareTop kind of work
785261,11134%New homes (608)
785201,01631%New homes (439)
7852199230%New homes (444)
78575411%New homes (31)
7856628under 1%New homes (20)
785865under 1%New homes (4)
782502under 1%Other
785851under 1%New homes (1)
770701under 1%Other
785521under 1%Other

All 3 ZIP codes with 250+ permits →

Download this table (CSV)

How Brownsville compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Brownsville GIS, Accela Permits Report 03312026 (ArcGIS Online), read 23 Oct 2026. We count permits issued April 2024 through March 2026; denied and withdrawn permits are left out. The city's report lists issued permits only, with no status and no final date, so no finished share is shown.

Building permits the City of Brownsville issues inside city limits, as listed in a report from its Accela permit system: new houses and duplexes, re-roofs, repairs, alterations, additions, pools, solar, accessory structures, demolition, house moving, commercial and multi-family construction and signs. The report holds no separate electrical, plumbing or mechanical permits. Unincorporated Cameron County and other cities (Olmito, Los Fresnos, San Benito) are permitted by other offices.

  • The city's report names no contractor, so there are no contractor lists, rankings or firm pages for Brownsville.
  • The report is a one-off export dated March 31, 2026, so these pages end with March 2026.
  • It lists issued permits only, with no status, no final inspection date and no job value, so there is no finished share, no time to final and no costs.
  • Electrical, plumbing and mechanical permits are not in the report; the few repair permits that describe that kind of work are counted under those trades.
  • Homes are the report's residential permits; multi-family buildings count as other. The ZIP code is read from the end of each permit's address.
  • A permit number the report lists twice (usually a reissue) is counted once, at its first issue date.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "The City of Brownsville, TX building permit statistics", https://contractorrecords.com/brownsville/permit-statistics, data through March 2026, from City of Brownsville Building Inspections building-permit records.

Link to a table: By kind of work · By year · By month · When each kind of work is filed · Homes and everything else · By ZIP code.

Download the tables (CSV): Permits by kind of work · Permits by year · Permits by month · Permits by calendar month (index) · Homes and other permits · Permits by ZIP code.

Common questions

  • How many building permits does Brownsville issue a year?About 1,634 a year in the City of Brownsville: 3,268 permits over 24 months, April 2024 through March 2026. 1,710 permits in the last 12 months on file (Apr 2025–Mar 2026), 10% more than the 1,558 in the 12 months before.
  • Are building permits up or down in Brownsville?1,710 permits in the last 12 months on file (Apr 2025–Mar 2026), 10% more than the 1,558 in the 12 months before. New home permits grew most (784 to 824); roofing permits fell most (312 to 273).
  • What is the busiest month for permits in Brownsville?April, counting every kind of work (126 against an average month of 100). November is the quietest (69). Each kind of work has its own season; the charts above show them.
  • What share of Brownsville permits are for homes?79%: 2,579 of the 3,268 permits issued April 2024 through March 2026 were residential permits.