2,488 building permits were issued in ZIP code 52403 by the City of Cedar Rapids Building Services, October 2024 through September 2026: 16% of the 15,190 in the City of Cedar Rapids, the 3rd busiest ZIP code. HVAC permits lead with 513. 1,118 permits in the last 12 months (Oct 2025–Sep 2026), 18% fewer than the 1,370 in the 12 months before. Permits from a city that runs its own permit office are not counted.

2,488permits in 52403
1,118last 12 months
78%for homes
Sep 2026records through

Permits in 52403 by kind of work

Share here is the part of the 2,488 permits in 52403; citywide is the same for all of the City of Cedar Rapids.

Kind of workPermitsShare hereCitywide
HVAC51321%21%
Electrical40116%16%
Plumbing38816%17%
Demolition13under 1%under 1%
Other1,17347%45%

Download this table (CSV)

Permits in 52403 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)33431,372
2025121,3231,323
2026 (through September)98221,096

Download this table (CSV)

How these numbers are made

Source: City of Cedar Rapids Building Services, monthly Permit Reports (Permits Issued by Permit Type), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. Each monthly report shows a permit's status only on the day it was run and is never updated, so no finished share is shown.

Building, trade, sewer, demolition and sign permits the City of Cedar Rapids Building Services issues inside the city limits only. Marion, Hiawatha, Robins and unincorporated Linn County issue their own permits and are not in this file.

  • The city's monthly reports name no contractor, so there are no contractor lists, rankings or firm pages for Cedar Rapids.
  • Each monthly report shows a permit's status only on the day the report was run and is never updated, and it has no final inspection date, so these pages cannot show which permits finished or how long a permit takes.
  • In mid-2025 the city moved to a new permit system whose reports describe a building permit only as residential or commercial. So the two years compare like with like, all building permits are counted under Other; heating and air conditioning, electrical, plumbing and sewer, and demolition permits are split out.
  • Zoning clearances, oversize-load, erosion-control and floodplain permits are left out.
  • The value is the valuation on the permit, which sets the fee; trade permits often carry none. It is not a final cost.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 52403, the City of Cedar Rapids", https://contractorrecords.com/cedar-rapids/zip/52403, data through September 2026, from the City of Cedar Rapids Building Services building-permit records.

Link to a table: By kind of work · By year.

Download the tables (CSV): Permits in 52403 by kind of work · Permits in 52403 by year.

Common questions

  • How many building permits were issued in 52403?2,488 permits issued by the city in ZIP code 52403, October 2024 through September 2026: 513 HVAC, 401 electrical, 388 plumbing. 1,118 were in the last 12 months.
  • What is built most in 52403?HVAC: 513 of the 2,488 permits (21%), against 21% citywide.
  • Who did the work in 52403?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.