Contractor Records
Home › Chattanooga › Permits by ZIP code

Building permits by ZIP code in Chattanooga

Data through September 2026 · updated 18 Oct 2026

14 ZIP codes have 250 or more building permits in Chattanooga, October 2024 through September 2026. 37421 is the busiest with 2,864 (21% of 13,353). Together they hold 99% of the permits.

ZIP codes by permits

Busiest first, October 2024 through September 2026. Top kind of work is the one with the most permits in that ZIP code.

ZIP codePermitsShareTop kind of work
374212,86421%Plumbing (950)
374051,62812%Plumbing (502)
373431,53411%Plumbing (502)
374041,1409%Plumbing (328)
374061,0468%Plumbing (274)
374118106%Electrical (223)
374197996%Plumbing (259)
374106715%Plumbing (203)
374156065%Electrical (168)
374166025%Plumbing (177)
374075174%Plumbing (136)
374083843%Plumbing (137)
374093503%Plumbing (98)
374032702%Plumbing (94)

5 more ZIP codes have fewer than 250 permits each (131 in all), so no page.

Download this table (CSV)

How these numbers are made

Source: City of Chattanooga Hub (ChattaData), All Permits (nightly CSV extract, ArcGIS item 9937e99e93de467eae5f592061c2672c), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Chattanooga Land Development Office issues inside the city: building, repair and replace, modification and demolition permits for homes, and electrical, plumbing, mechanical and gas permits the city marks residential. Commercial, industrial and institutional permits, street cuts, land disturbing, low voltage permits and certificates of occupancy in the same file are not counted. Unincorporated Hamilton County, East Ridge, Red Bank, Signal Mountain and the other towns run their own permit offices and are not in this file.

  • The file names a contractor company on about seven in ten of the permits counted here, and on none before 2020. The contractor table counts permits filed per firm among those; it does not rate, rank or compare their work.
  • The file has a declared cost on only a few commercial permits, so we show no costs.
  • The file's completion date is empty. A final date here is the date the city last changed the permit's status, on permits whose status is Complete. A permit with any other status (Active or Stopped) counts as open; the file has no expired status.
  • In mid-2025 the city renamed several permit types (for example 'Residential Building Permit Old' and 'Residential Modification Permit' became 'Residential Building Permit' and 'Residential Repair Replace'); both names are counted the same way.
  • A new house gets separate building, electrical, plumbing, mechanical and gas permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits by ZIP code in Chattanooga", https://contractorrecords.com/chattanooga/zip/, data through September 2026, from the City of Chattanooga Land Development Office building-permit records.

Link to a table: ZIP codes by permits.

Download the tables (CSV): ZIP codes by permits.

Common questions

  • Which ZIP code in Chattanooga has the most building permits?37421, with 2,864 permits, October 2024 through September 2026; then 37405 (1,628).
  • Can I see the permits for one address in Chattanooga?Not here: we publish permits by ZIP code without street addresses. The city keeps each property's permit history; search its records by address or permit number.