Contractor Records
Home › Chattanooga › ZIP 37406

Building permits in 37406, Chattanooga

Data through September 2026 · updated 18 Oct 2026

1,046 building permits were issued in ZIP code 37406 by the City of Chattanooga Land Development Office, October 2024 through September 2026: 8% of the 13,353 in Chattanooga, the 5th busiest ZIP code. Plumbing permits lead with 274. 495 permits in the last 12 months (Oct 2025–Sep 2026), 10% fewer than the 551 in the 12 months before. Permits from a city that runs its own permit office are not counted.

1,046permits in 37406
495last 12 months
100%for homes
91days, usual issue to final
Sep 2026records through

Permits in 37406 by kind of work

Share here is the part of the 1,046 permits in 37406; citywide is the same for all of Chattanooga.

Kind of workPermitsShare hereCitywide
Plumbing27426%31%
Electrical27026%26%
HVAC19519%19%
Remodels & repairs13113%8%
New homes12712%10%
Demolition313%2%
Additions10under 1%2%
Garages, sheds & shade structures7under 1%1%
Fences & walls1under 1%under 1%

Download this table (CSV)

Permits in 37406 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)3124496
202512541541
2026 (through September)9381508

Download this table (CSV)

How permits in 37406 finish

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

Measure37406Citywide
Permits issued Oct 2024–Sep 20255516,422
Finished46.1%50.0%
Usual days, issue to final9192

Download this table (CSV)

How these numbers are made

Source: City of Chattanooga Hub (ChattaData), All Permits (nightly CSV extract, ArcGIS item 9937e99e93de467eae5f592061c2672c), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Chattanooga Land Development Office issues inside the city: building, repair and replace, modification and demolition permits for homes, and electrical, plumbing, mechanical and gas permits the city marks residential. Commercial, industrial and institutional permits, street cuts, land disturbing, low voltage permits and certificates of occupancy in the same file are not counted. Unincorporated Hamilton County, East Ridge, Red Bank, Signal Mountain and the other towns run their own permit offices and are not in this file.

  • The file names a contractor company on about seven in ten of the permits counted here, and on none before 2020. The contractor table counts permits filed per firm among those; it does not rate, rank or compare their work.
  • The file has a declared cost on only a few commercial permits, so we show no costs.
  • The file's completion date is empty. A final date here is the date the city last changed the permit's status, on permits whose status is Complete. A permit with any other status (Active or Stopped) counts as open; the file has no expired status.
  • In mid-2025 the city renamed several permit types (for example 'Residential Building Permit Old' and 'Residential Modification Permit' became 'Residential Building Permit' and 'Residential Repair Replace'); both names are counted the same way.
  • A new house gets separate building, electrical, plumbing, mechanical and gas permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 37406, Chattanooga", https://contractorrecords.com/chattanooga/zip/37406, data through September 2026, from the City of Chattanooga Land Development Office building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 37406 by kind of work · Permits in 37406 by year · Permits in 37406: finished and days to final.

Common questions

  • How many building permits were issued in 37406?1,046 permits issued by the city in ZIP code 37406, October 2024 through September 2026: 274 plumbing, 270 electrical, 195 HVAC. 495 were in the last 12 months.
  • What is built most in 37406?Plumbing: 274 of the 1,046 permits (26%), against 31% citywide.
  • How long does a permit take in 37406?The usual permit issued here Oct 2024–Sep 2025 took 91 days from issue to final (254 permits with a final date), against 92 days citywide.
  • Who did the work in 37406?The city's file names contractors, but only on about seven in ten of these permits, and we have not matched the names to state license records, so we only count permits per firm and don't rate or rank them, so we don't list them by ZIP code. Ask a contractor for the permit numbers of past jobs and check them with the city.