Contractor Records
Home › El Paso › New homes

New home permits in the City of El Paso, TX

Data through June 2026 · updated 19 Oct 2026

1,559 new home permits were issued in the City of El Paso, July 2024 through June 2026: about 780 a year and 61% of all permits. 654 new home permits in the last 12 months on file (Jul 2025–Jun 2026), 28% fewer than the 905 in the 12 months before. The busiest month is July.

What this file covers: The city publishes only new construction: new homes and new commercial buildings, shells, additions and tenant improvements. Remodels, re-roofs, pools, demolition and trade permits are not in the file.

1,559permits issued
654last 12 months on file
Julbusiest month
Jun 2026records through

New home permits by month

Permits issued each month, July 2024 through June 2026.

Jul 2024: 109Jul2024Aug 2024: 99Sep 2024: 72Oct 2024: 89Nov 2024: 82Dec 2024: 50Jan 2025: 53Jan2025Feb 2025: 59Mar 2025: 73Apr 2025: 72May 2025: 84Jun 2025: 63Jul 2025: 93JulAug 2025: 69Sep 2025: 61Oct 2025: 58Nov 2025: 40Dec 2025: 35Jan 2026: 46Jan2026Feb 2026: 55Mar 2026: 48Apr 2026: 72May 2026: 40Jun 2026: 37
The same numbers as a table
MonthPermits
Jul 2024109
Aug 202499
Sep 202472
Oct 202489
Nov 202482
Dec 202450
Jan 202553
Feb 202559
Mar 202573
Apr 202572
May 202584
Jun 202563
Jul 202593
Aug 202569
Sep 202561
Oct 202558
Nov 202540
Dec 202535
Jan 202646
Feb 202655
Mar 202648
Apr 202672
May 202640
Jun 202637

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (155), December the quietest (65). A busy month at the permit counter usually means a longer wait for a contractor.

January: 76 (100 = an average month)February: 88 (100 = an average month)March: 93 (100 = an average month)April: 111 (100 = an average month)May: 95 (100 = an average month)June: 77 (100 = an average month)July: 155 (100 = an average month)155August: 129 (100 = an average month)September: 102 (100 = an average month)October: 113 (100 = an average month)November: 94 (100 = an average month)December: 65 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January76
February88
March93
April111
May95
June77
July155
August129
September102
October113
November94
December65

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
New Single Family1,52398%
New Duplex Family Buildings362%

Download this table (CSV)

How these numbers are made

Source: City of El Paso Planning, New Residential and New Commercial building permit layers (ArcGIS), read 19 Oct 2026. We count permits issued July 2024 through June 2026; denied and withdrawn permits are left out. El Paso's new construction file has had no permit status since 2020, so no finished share is shown.

New construction permits the City of El Paso issues inside the city limits: new homes, duplexes and small multifamily buildings, and new commercial buildings, shells, commercial additions and tenant improvements. Remodels, re-roofs, pools, demolition and electrical, plumbing and mechanical permits are not in the city's published file. Unincorporated El Paso County and the separate towns of Horizon City, Socorro, Anthony, Vinton and Clint are not included.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for El Paso.
  • The file covers new construction only. It has no remodel, re-roof, pool, demolition, electrical, plumbing or mechanical permits.
  • Since 2020 the file has no status, final date, job value or ZIP code, so it can't show which permits finished, how long a permit takes or what work cost.
  • The file holds no permits issued in July 2026, so the window ends in June 2026.
  • New homes include duplexes; triplexes and fourplexes count as other. Commercial permits, including apartment buildings and tenant improvements, count as other.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in the City of El Paso, TX", https://contractorrecords.com/el-paso/new-home-permits, data through June 2026, from the City of El Paso Planning and Inspections Department building-permit records.

Link to a table: By month · Season · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits by permit type.

Common questions

  • How many new home permits does El Paso issue a year?About 780 a year in the City of El Paso: 1,559 permits issued July 2024 through June 2026, 654 of them in the last 12 months on file (to June 2026).
  • When do people in El Paso file the most new home permits?July (155 against an average month of 100); December is the quietest (65). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.