Contractor Records
Home › Everett › ZIP 98203

Building permits in 98203, Everett

Data through September 2026 · updated 19 Oct 2026

4,147 building permits were issued in ZIP code 98203 by the City of Everett Permit Services, October 2024 through September 2026: 36% of the 11,450 in Everett, the busiest ZIP code. Electrical permits lead with 1,882. 2,067 permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 2,080 in the 12 months before. Permits from a city that runs its own permit office are not counted.

4,147permits in 98203
2,067last 12 months
Sep 2026records through

Permits in 98203 by kind of work

Share here is the part of the 4,147 permits in 98203; citywide is the same for all of Everett.

Kind of workPermitsShare hereCitywide
Electrical1,88245%46%
HVAC89722%18%
Plumbing45411%12%
Roofing1484%3%
Remodels & repairs1363%3%
ADUs & casitas601%1%
New homes36under 1%1%
Demolition31under 1%1%
Solar30under 1%under 1%
Additions14under 1%under 1%
Garages, sheds & shade structures7under 1%under 1%
Pools & spas4under 1%under 1%
Other44811%14%

Download this table (CSV)

Permits in 98203 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2024 (from October)35452,180
2025122,0172,017
2026 (through September)91,5852,113

Download this table (CSV)

How these numbers are made

Source: City of Everett Open Data, Trakit Permits dataset 3w3u-656c, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's public file has no permit status and no final inspection date, only an expiration date on some permits, so no finished share is shown.

Building, electrical, mechanical, plumbing, solar, demolition, fire protection and sign permits the City of Everett Permit Services issues inside city limits. Water, sewer and franchise utility, public works and street use permits in the same file are not counted. Unincorporated Snohomish County, Mukilteo and the other nearby cities run their own permit offices and are not in this file.

  • The file has no permit status and no final inspection date, so we show neither a finished share nor time to final.
  • Most electrical permits don't say whether the property is a home or a business, so we don't split permits into homes and other buildings.
  • The value is the job value written on the permit, not the final cost of the job.
  • The ZIP code is read from the permit's site address.
  • A house job can need separate building, electrical, mechanical and plumbing permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 98203, Everett", https://contractorrecords.com/everett/zip/98203, data through September 2026, from the City of Everett Permit Services building-permit records.

Link to a table: By kind of work · By year.

Download the tables (CSV): Permits in 98203 by kind of work · Permits in 98203 by year.

Common questions

  • How many building permits were issued in 98203?4,147 permits issued by the city in ZIP code 98203, October 2024 through September 2026: 1,882 electrical, 897 HVAC, 454 plumbing. 2,067 were in the last 12 months.
  • What is built most in 98203?Electrical: 1,882 of the 4,147 permits (45%), against 46% citywide.
  • Who did the work in 98203?The city's file names contractors, but we have not matched the names to state license records, so we only count permits per firm and don't rate or rank them, so we don't list them by ZIP code. Ask a contractor for the permit numbers of past jobs and check them with the city.