Contractor Records
Home › Everett › HVAC

HVAC permits in Everett, WA

Data through September 2026 · updated 19 Oct 2026

2,100 HVAC permits were issued in Everett, October 2024 through September 2026: about 1,050 a year and 18% of all permits. 1,002 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 9% fewer than the 1,098 in the 12 months before. The busiest month is July. 98203 has the most, 897.

2,100permits issued
1,002last 12 months
Julbusiest month
$7,904usual declared value
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 112Oct2024Nov 2024: 113Dec 2024: 76Jan 2025: 89Jan2025Feb 2025: 89Mar 2025: 102Apr 2025: 95May 2025: 76Jun 2025: 82Jul 2025: 103JulAug 2025: 76Sep 2025: 85Oct 2025: 87Nov 2025: 67Dec 2025: 97Jan 2026: 81Jan2026Feb 2026: 61Mar 2026: 75Apr 2026: 93May 2026: 93Jun 2026: 82Jul 2026: 97JulAug 2026: 68Sep 2026: 101
The same numbers as a table
MonthPermits
Oct 2024112
Nov 2024113
Dec 202476
Jan 202589
Feb 202589
Mar 2025102
Apr 202595
May 202576
Jun 202582
Jul 2025103
Aug 202576
Sep 202585
Oct 202587
Nov 202567
Dec 202597
Jan 202681
Feb 202661
Mar 202675
Apr 202693
May 202693
Jun 202682
Jul 202697
Aug 202668
Sep 2026101

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (114), August the quietest (82). A busy month at the permit counter usually means a longer wait for a contractor.

January: 97 (100 = an average month)February: 86 (100 = an average month)March: 101 (100 = an average month)April: 107 (100 = an average month)May: 97 (100 = an average month)June: 94 (100 = an average month)July: 114 (100 = an average month)114August: 82 (100 = an average month)September: 106 (100 = an average month)October: 114 (100 = an average month)November: 103 (100 = an average month)December: 99 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January97
February86
March101
April107
May97
June94
July114
August82
September106
October114
November103
December99

Download this table (CSV)

What an HVAC permit is declared at

The value written on the permit at application, from 2,081 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$7,904
Middle half$3,500–$15,000

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 2,100 HVAC permits.

ZIP codePermitsShare
9820389743%
9820171434%
9820831115%
982041778%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Mechanical: Residential Mechanical1,62878%
Mechanical: Commercial Mechanical (Plan Review Required)46922%
Mechanical3under 1%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most HVAC permits in the City of Everett TRAKiT permit file, October 2024 through September 2026, with 5 or more each. Share is the part of all 2,100 HVAC permits; 91% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
CM Heating LLC28013%
CM Air Pros LLC1286%
Fast Water Heater Company914%
Home Comfort Alliance LLC573%
Puget Heating Co Inc553%
Washington Energy Svcs Co LLC512%
Seatown Electric Htg & Air LLC462%
Greenwood Htng & Home Services432%
Essential Heating & Air412%
Cozy Heating Inc311%

Download this table (CSV)

Nearby permit data

HVAC permits for other places in Seattle and Puget Sound. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Everett Open Data, Trakit Permits dataset 3w3u-656c, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's public file has no permit status and no final inspection date, only an expiration date on some permits, so no finished share is shown.

Building, electrical, mechanical, plumbing, solar, demolition, fire protection and sign permits the City of Everett Permit Services issues inside city limits. Water, sewer and franchise utility, public works and street use permits in the same file are not counted. Unincorporated Snohomish County, Mukilteo and the other nearby cities run their own permit offices and are not in this file.

  • The file has no permit status and no final inspection date, so we show neither a finished share nor time to final.
  • Most electrical permits don't say whether the property is a home or a business, so we don't split permits into homes and other buildings.
  • The value is the job value written on the permit, not the final cost of the job.
  • The ZIP code is read from the permit's site address.
  • A house job can need separate building, electrical, mechanical and plumbing permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in Everett, WA", https://contractorrecords.com/everett/hvac-permits, data through September 2026, from the City of Everett Permit Services building-permit records.

Link to a table: By month · Season · Declared value · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: declared value · HVAC permits by ZIP code · HVAC permits by permit type · Most active contractors by permits filed.

Common questions

  • How many HVAC permits does Everett issue a year?About 1,050 a year in Everett: 2,100 permits issued October 2024 through September 2026, 1,002 of them in the last 12 months.
  • When do people in Everett file the most HVAC permits?July (114 against an average month of 100); August is the quietest (82). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Everett?98203, with 897 of the 2,100 (43%); then 98201 (714).