Data through May 2026 · updated 19 Oct 2026

963 home addition permits were issued in Fairfax County, June 2024 through May 2026: about 482 a year and 5% of all permits. 481 home addition permits in the last 12 months on file (Jun 2025–May 2026), about the same as the 482 in the 12 months before. The busiest month is April. The usual one took 177 days from issue to the county's final. 22042 has the most, 59.

What this file covers: The county publishes its building permits only; electrical, plumbing, mechanical and other trade permits are not in the file.

963permits issued
481last 12 months on file
Aprbusiest month
177days, usual issue to final
74%finished
May 2026records through

Home addition permits by month

Permits issued each month, June 2024 through May 2026.

Jun 2024: 45Jun2024Jul 2024: 32JulAug 2024: 37Sep 2024: 48Oct 2024: 51Nov 2024: 36Dec 2024: 43Jan 2025: 42Jan2025Feb 2025: 30Mar 2025: 44Apr 2025: 38May 2025: 36Jun 2025: 33Jul 2025: 40JulAug 2025: 37Sep 2025: 32Oct 2025: 39Nov 2025: 47Dec 2025: 34Jan 2026: 26Jan2026Feb 2026: 48Mar 2026: 43Apr 2026: 60May 2026: 42
The same numbers as a table
MonthPermits
Jun 202445
Jul 202432
Aug 202437
Sep 202448
Oct 202451
Nov 202436
Dec 202443
Jan 202542
Feb 202530
Mar 202544
Apr 202538
May 202536
Jun 202533
Jul 202540
Aug 202537
Sep 202532
Oct 202539
Nov 202547
Dec 202534
Jan 202626
Feb 202648
Mar 202643
Apr 202660
May 202642

Download this table (CSV)

When home addition permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (122), January the quietest (85). A busy month at the permit counter usually means a longer wait for a contractor.

January: 85 (100 = an average month)February: 97 (100 = an average month)March: 108 (100 = an average month)April: 122 (100 = an average month)122May: 97 (100 = an average month)June: 97 (100 = an average month)July: 90 (100 = an average month)August: 92 (100 = an average month)September: 100 (100 = an average month)October: 112 (100 = an average month)November: 103 (100 = an average month)December: 96 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January85
February97
March108
April122
May97
June97
July90
August92
September100
October112
November103
December96

Download this table (CSV)

How long a home addition permit takes

Permits issued Jun 2024–May 2025, at least 12 months before the file ends. Usual days is the middle permit among the 358 with a final date.

MeasureValue
Permits issued Jun 2024–May 2025482
Finished74.3%
Usual days, issue to final177
Middle half, days115–261

Download this table (CSV)

ZIP codes with the most home addition permits

Counted at the property's ZIP code. Share is the part of the county's 963 home addition permits.

ZIP codePermitsShare
22042596%
22003525%
22308465%
22032465%
22150374%
22180354%
22066354%
22101344%
22182323%
22151323%

Download this table (CSV)

Nearby permit data

Home addition permits for other places in Washington, DC. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Fairfax County Open Data, Building Records PLUS (Land Development Services), read 19 Oct 2026. We count permits issued June 2024 through May 2026; denied and withdrawn permits are left out.

Building permits Fairfax County Land Development Services issues for the county and the towns it serves (Vienna, Herndon and Clifton), including places such as Reston, McLean, Springfield, Annandale, Centreville and Chantilly. The independent cities of Fairfax and Falls Church run their own permit offices and are not in this file (a Fairfax or Falls Church mailing address outside those cities is). The county does not publish its electrical, plumbing, mechanical or other trade permits.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Fairfax County.
  • The file has no declared job value, so we show no costs.
  • The county publishes only building permits: residential and commercial new construction and additions or alterations. Electrical, plumbing, HVAC, roofing and other trade permits are not in the file, so those kinds of work do not appear here.
  • The file has no work description. Home additions, sunrooms, garages and sheds are picked out from the short project name on the permit; decks, porches, basements, kitchens, baths and other alterations count as remodels and repairs.
  • Permits issued from June 2026 on were still arriving in the county's file when it was pulled in October 2026, so the window ends in May 2026.
  • A final date is the date the county closed the permit. Certificates of occupancy are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Home addition permits in Fairfax County, VA", https://contractorrecords.com/fairfax-county/addition-permits, data through May 2026, from Fairfax County Land Development Services building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code.

Download the tables (CSV): Additions permits by month · Additions permits by calendar month (index) · Additions permits: days to final · Additions permits by ZIP code.

Common questions

  • How many home addition permits does Fairfax County issue a year?About 482 a year in Fairfax County: 963 permits issued June 2024 through May 2026, 481 of them in the last 12 months on file (to May 2026).
  • How long does a home addition permit take in Fairfax County?The usual one took 177 days from issue to the county's final inspection, and the middle half took 115 to 261 days (358 permits issued Jun 2024–May 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Fairfax County file the most home addition permits?April (122 against an average month of 100); January is the quietest (85). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most home addition permits in Fairfax County?22042, with 59 of the 963 (6%); then 22003 (52).