Home › Guides › Do I need a permit to build a new house in Chicago? Yes: Standard Plan Review, an architect-filed application and the GC license limits

Do I need a permit to build a new house in Chicago? Yes: Standard Plan Review, an architect-filed application and the GC license limits

Yes: a new house in Chicago needs a building permit through the Department of Buildings' Standard Plan Review, started online by an Illinois-licensed architect or structural engineer (or a licensed expediter), after zoning approval, and built under a City-licensed general contractor whose class covers the job's value. Builders filed 1,090 new-home permits in Chicago from October 2023 to September 2026; the usual one was filed at $440,000.

By Contractor Records · data through October 17, 2026

Which program and who files

The DOB's Standard Plan Review page (read 26 October 2026) calls it "the main permitting process for building permit applications which require architectural plans", for work including "new construction" of "single family homes". Key lines:

Rule What the City says
Zoning first "all projects require zoning approval"
Who prepares plans "The Standard Review Process requires an architect to prepare the drawings and documents"
Size limits New buildings up to 80 feet high, residential projects under 50 dwelling units, foundations and excavation no more than 12 feet deep
Point of contact Each project is assigned a Project Manager
Other permits Driveway, sewer and water permits may also be required

The new construction instructions (read 26 October 2026) add who can start it: "you must be an Illinois-licensed architect or structural engineer or a city-licensed expediter, and your license must be associated with your Dynamic Portal user account." So as an owner you cannot file a new-home permit yourself; your architect does.

How the application runs

  1. Zoning and address. The address must match a house number certificate from the Chicago Department of Transportation; a new street address has to be set up by DOB before the deposit can be paid. Every property PIN must be entered.
  2. Start in the Dynamic Portal as "New Construction with Plans", Standard Plan Review, with the estimated cost of materials and labor and the building area. If a building stood on the lot, the 9-digit wrecking (demolition) permit number goes in.
  3. Pay the deposit, then upload drawings and Form 400 to ProjectDox within the E-Plan system; the Form 400 cost, area, height and description must match the portal entries or issue is delayed.
  4. Contractors. The general contractor and trade contractors can be added later, but must be listed before the permit can issue.
  5. Issue. Pay the balance, print the permit and post it "in a location visible from a public street or sidewalk before any work begins"; approved drawings must be on site whenever work is happening.
  6. Certificate of occupancy. A new house (Group R-3) answers "Yes" to the certificate of occupancy question, so the job ends with a CO.

Who can build it

From the City's general contractor page (read 26 October 2026): a licensed and insured GC "is required for most types of building construction", and "Only one general contractor is allowed on the same project at the same time." The license page caps each class by project value:

Chicago GC class Maximum project value Minimum insurance per occurrence
E $500,000 $1 million
D $4 million $2 million
C $10 million $2 million
B $20 million $3 million
A Unlimited $5 million

With the usual new-home permit filed at $440,000 and the middle half of builders' usual values running $377,675 to $775,000, many Chicago houses sit near the Class E ceiling; a builder with a Class E license cannot take a job above $500,000. Check the class on Licensed Trade Contractors, along with the electrical, plumbing and mason contractors.

Owner as general contractor: allowed without a license for "an entirely residential property that is the individual's primary residence", no more than 6 units and no building over 3 stories, for one property a calendar year. But "An individual without a general contractor's license cannot perform or oversee work that requires a demolition permit or excavation notice", so ask DOB whether your foundation work triggers an excavation notice before planning to build your own.

What it costs

The fee depends on "construction type, occupancy type, area in square feet, and project scope", under the Chicago Construction Codes Administrative Provisions (Calculate the Cost of a Building Permit, read 26 October 2026). The City's online calculator reflects 2026 fees; permits issued from 1 January 2027 use the 2027 fee tables posted on the same page. We could not open the fee table PDFs, so we quote no amount; questions go to the assigned project manager or dob-info@cityofchicago.org. Driveway, sewer and water permits and any wrecking permit are separate.

What 1,090 Chicago new-home permits show

Measure Chicago new homes
Permits, October 2023 to September 2026 1,090
Builders 458
Builders with one permit only 281 (61.4%)
Builders with a permit in the last 12 months of the file 211
Usual filed value $440,000
Middle half of builders' usual value (3+ permits) $377,675 to $775,000
Marked complete (permits a year or more old) 37.8%
Estimated usual days to be marked complete 621
Builders with 10+ permits under 70% complete 20 of 21
Share held by the five busiest builders 11.9%
Busiest / quietest month (index, 100 = average) August (121) / January (66)

Chicago house building is a market of small builders: 458 names for 1,090 permits, 61.4% of them with one, and the five busiest holding only 11.9%. Completion in the City's file is low across the board, 37.8%, and 20 of 21 busy builders were under 70%, so an open new-home permit often reflects City paperwork rather than an unfinished house; ask the builder for the certificate of occupancy on their recent homes. Prices by home size: Chicago new home cost.

See every Chicago home builder by permits filed →

Related

Older permits on a lot: Chicago building permit search and the City's Building Permit and Inspection Records. Licenses: Chicago contractor license lookup. Smaller jobs: Chicago remodel permit and Chicago garage permit. Other places: do I need a permit to build a house. National prices: new home construction cost; what to ask: hiring a home builder. Counts by month: Chicago permit statistics.

What this does not tell you

Chicago's permit file has no completion date, so the days figure is our estimate from status and permit age, and "marked complete" understates finished houses. Filed values are the applicant's estimated cost. We do not match Chicago builders to the City's license list, so check the class yourself.

How we know this

Program scope, filing and posting rules are quoted from the City of Chicago Department of Buildings' Standard Plan Review page and its New Construction application instructions, the general contractor rules and class limits from its GC pages, and the fee basis from its Calculate the Cost of a Building Permit page, all read 26 October 2026. Counts are City of Chicago new construction permits for homes, October 2023 to September 2026; "marked complete" uses permits a year or more old and days are our estimate from permit status and age.

Numbers come from City of Chicago building permits (Chicago Data Portal), data through October 17, 2026. Nobody paid to be on this page and nobody can.

Questions

  • Do I need a permit to build a house in Chicago?

    Yes, a building permit through the Department of Buildings' Standard Plan Review program, which is the main route for applications that need architectural plans, including new single-family homes. Zoning approval comes first, and the application is started online by an Illinois-licensed architect or structural engineer or a City-licensed expediter.

  • How much is a building permit for a new house in Chicago?

    Chicago sets the fee by construction type, occupancy, area in square feet and scope, using the fee tables in force when the permit issues (2026 Amended tables for 2026, new tables from 1 January 2027). The City's online calculator estimates it; you pay a deposit to start and the balance at issue.

  • Can I be my own general contractor for a new house in Chicago?

    Only for your primary residence with no more than 6 units and no building over 3 stories, once a calendar year, and an unlicensed owner 'cannot perform or oversee work that requires a demolition permit or excavation notice'. Otherwise you need a City-licensed general contractor whose class covers the project value.

  • Which general contractor license does a new house in Chicago need?

    One whose class covers the project value: Class E up to $500,000, Class D up to $4 million, Class C up to $10 million, Class B up to $20 million and Class A unlimited. The usual Chicago new-home permit in our file was filed at $440,000.

  • How long does it take to build a house in Chicago once permitted?

    Long. Our estimate of the usual time for a Chicago new-home permit to be marked complete is 621 days, and only 37.8% of new-home permits a year or more old were marked complete at all.