Seattle electrical in numbers
| What we measured | Seattle |
|---|---|
| Electrical permits on homes, three years | 20,201 |
| Firms | 899 |
| Firms matched to an active L&I record | 83.5% |
| Usual filed value | $4,067 |
| Middle half of firms' usual value | $2,250 to $8,000 |
| Usual days from permit to completion | 42 |
| Completed (permits a year or more old) | 94.5% |
| 10th / 90th-percentile firm (10+ permits) | 85.7% / 98.9% |
| Firms under 70% completed | 2 of 286 |
Only 71.5% of electrical permits carry a filed value, so the value figures rest on that share. EV chargers are filed separately: 3,347 permits from 385 firms. For prices nationally, see electrical work cost.
Which license a Seattle electrician needs
Electrical work in Washington needs an L&I electrical contractor license, separate from the general contractor registration a remodeler holds. The firm must have an assigned administrator or master electrician, and it carries a $4,000 electrical contractor bond (L&I, read 22 October 2026). A bond that size covers little if a big job goes wrong: treat it as a sign of a real business, not as your protection.
The five-minute check: search the firm on L&I Verify by name or license number. Check that the record is an electrical contractor license (not only a construction registration), that it is active, and look at the same page for bond lawsuits, workers' comp status and infractions. More in the Seattle contractor license lookup.
The permit rule for electrical work in Seattle
SDCI's electrical permit page says "You need an electrical permit any time electrical wiring is installed, altered, extended, or connected", and that Seattle City Light handles "service changes or new services" (SDCI, read 22 October 2026). So a panel upgrade usually means two parties: the electrician's permit and inspection, and a City Light disconnect and reconnect. Ask who books City Light. Owners may do their own work "when they own and occupy the property"; for hired work, the electrician buys the permit. Building without a required permit can bring fines of "up to $500 per day" (SDCI).
Once the job is booked, search your address on the Seattle Services Portal: the electrical permit should name your electrician, and after the inspection, show as completed. Panel rules in other cities are in do I need a permit for an electrical panel upgrade.
Red flags in the Seattle record
- An L&I record that is not active. 81 electrical firms on Seattle permits (9.0%) matched an L&I record that is no longer active. They pulled permits in the window; check today's status.
- A completion share under 85.7%. Few busy Seattle electricians fall below that line (2 under 70%), so one that does has something to explain.
- A firm that stopped filing. 41 electrical firms with 5 or more permits filed none in the last 12 months.
- A general contractor doing the wiring itself on a construction registration alone. Ask for the electrical contractor's license number, whoever does the work.
- "No permit needed." Under SDCI's rule almost any wiring change needs one.
The busiest Seattle electricians in the last 12 months
Ranked by Seattle electrical permits in the last 12 months of the window. Volume, not quality.
| Firm | Permits, last 12 months | Permits, three years |
|---|---|---|
| As You Wish Electric | 317 | 1,089 |
| Kemly Electric Inc | 311 | 814 |
| Seatown Electric Corp | 288 | 860 |
| Greenwood Htng & Home Services | 277 | 599 |
| Mirsky Electric Inc | 195 | 545 |
The five busiest firms hold 19.4% of Seattle's electrical permits, so most jobs go to smaller shops. Each firm's completion share and L&I status are on the compare list.
See every Seattle electrician by completion and L&I status →
What the Seattle record does not tell you
A completed permit means the inspector passed the work; it does not tell you whether the electrician's price was fair or whether the crew was tidy. Permits carry no L&I number, so firms are matched by business name, and 5.5% had no match; unmatched is not unlicensed. Some permits are for small jobs filed at a nominal value, which pulls the usual value down. Insurance never appears on a permit. The national checklist with ten questions is in hiring an electrician.
How we know this
Permits are City of Seattle (SDCI) electrical permits on single-family and duplex homes, 2023-10 to 2026-09. "Completed" uses permits a year or more old; days to completion is the median from issue to completion. Percentile and under-70% figures use electrical firms with 10 or more permits; the filed-value range uses firms with 3 or more. The busiest-firm table ranks by permits in the last 12 months. License status is our name match to Washington L&I's contractor license file. Rules are quoted from L&I and SDCI pages, read 22 October 2026.
Numbers come from City of Seattle (SDCI) building, trade and electrical permits on single-family and duplex homes (the city's open-data exports), data through October 17, 2026. Nobody paid to be on this page and nobody can.
Questions
- How do I choose an electrician in Seattle?
Check the firm's L&I electrical contractor license (not just a general contractor registration), make sure it pulls the SDCI electrical permit, and read its Seattle record. 94.5% of Seattle electrical permits a year or more old were completed, usually in 42 days; among firms with 10 or more permits, even the 10th-percentile firm completed 85.7%.
- Does an electrician need a license in Seattle?
Yes. Washington L&I licenses electrical contractors separately from general contractor registration; the firm needs an assigned administrator or master electrician and a $4,000 electrical contractor bond. Check it on L&I Verify.
- Do I need a permit for electrical work in Seattle?
SDCI says you need an electrical permit any time electrical wiring is installed, altered, extended or connected. A service change or new service also goes through Seattle City Light. Owners may do their own work when they own and occupy the property.
- How much does an electrician cost in Seattle?
The usual Seattle electrical permit was filed at $4,067, and the middle half of electrical firms had a usual filed value between $2,250 and $8,000. A panel upgrade and an outlet move file very differently, so compare like with like.
- How many electricians work in Seattle?
899 firms pulled 20,201 electrical permits on Seattle homes in three years, and 639 filed at least one in the last 12 months.
Build your own list
Every firm with that kind of permit on record. Pick what you value. The list moves.
Related guides
- General contractor vs handyman: where your state draws the line
- Is a Level 2 EV charger worth it? Cost, panel capacity and the end of the federal credit
- Seattle building permit search: Services Portal, permit history tool and old microfilm
- Seattle contractor license lookup: which license, where to search, and what the permits show
For one city
- Electrical Contractor — Washington L&I (2026-10-22)
- Verify a Contractor, Tradesperson or Business — Washington L&I (2026-10-22)
- Electrical Permit — Seattle SDCI (accessed 2026-10-22)
- Construction Without a Permit — Seattle SDCI (accessed 2026-10-22)
- Seattle Services Portal — City of Seattle (2026-10-22)