Home › Guides › Do I need a permit for an ADU in San Diego? The building permit, size and parking rules, fees and the 30-day plan route

Do I need a permit for an ADU in San Diego? The building permit, size and parking rules, fees and the 30-day plan route

Yes. Every ADU in the City of San Diego needs a building permit; Information Bulletin 400 says "There are no exemptions," and near the coast most also need a Coastal Development Permit. 640 firms filed 1,278 ADU permits from October 2023 to September 2026, at a usual value of $127,372, and the usual one reached final 442 days after issue.

By Contractor Records · data through October 15, 2026

The City's rules

From Information Bulletin 400 (January 2026, read 26 October 2026). Some of the newer rules are not yet in effect in the Coastal Overlay Zone; IB 400 lists which.

Rule What IB 400 says
Permit Building Permit or Combination Building Permit, "no exemptions"; Information Bulletin 125 decides which
Coastal A Coastal Development Permit for ADUs in the Coastal Overlay Zone not fully inside the existing house; in the non-appealable area it can be issued as a building permit if administrative findings are met
How many, single-dwelling zone One attached or detached ADU, one ADU converted from existing space or an accessory structure, and one JADU
Size New ADU 150 to 1,200 sq ft; one ADU up to 800 sq ft allowed even over the zone's floor area ratio
Height On single-unit lots, detached ADUs no more than two stories, within the zone's height limit
Fire zones In a Very High Fire Hazard Severity Zone, at least 4-foot side and rear setbacks
Parking "No parking spaces are required for ADUs outside of the Coastal Overlay Zone"
Sprinklers Only if the main house has them; a detached ADU does not trigger sprinklers in the house
Solar A newly built, non-manufactured detached ADU must have solar panels under the Energy Code, on the ADU or the house

More units through the ADU Home Density Bonus Program have their own limits and fees; see San Diego ADU bonus program. Look up your zone first in the City's ZAPP portal.

What to submit

IB 400's minimum for each ADU or JADU: site plan and vicinity map, floor and roof plans, elevations and sections, structural plans and details, structural or truss calculations, Title 24 energy calculations, the General Application (DS-3032), the Water Meter Data Card (DS-16) and the Storm Water Applicability Checklist (DS-560). Projects with a single house follow Project Submittal Manual Section 2A.

The preapproved-plan route. Under AB 1332 you can apply with a plan the City has preapproved; "Applications that utilize preapproved plans will be subject to a 30-day review." You license the plan from its designer, who sets the price, and it still has to meet the zone's development rules.

Who can pull it

A licensed builder. A new ADU is general building work, CSLB class B (CSLB classifications); check the license with the San Diego contractor license lookup. In our file 52.0% of ADU firms matched an active CSLB license, and 44.5% matched no license under the name on the permit; for those, ask who will hold the contract and check that name.

You, as owner-builder. The City's owner-builder verification form is DS-3042 (IB 301 refers to it). As owner-builder you are the responsible party for the build.

What it costs

IB 400 does not price the permit; it points to Information Bulletin 501 and the City's Fees page, and lists the charges that apply to ADUs:

Charge When it applies (IB 400)
Building permit and plan check Every ADU (IB 501)
School fees ADUs and JADUs, per Information Bulletin 146
General Plan Maintenance Fee All ADUs and JADUs since 9 August 2022
Development Impact Fees Per SDMC §142.0640(b)(1)
Regional Transportation Congestion Improvement Program fee Projects with more than one ADU
Inclusionary housing If ADUs bring the lot to 10 or more units (5 in the Coastal Overlay Zone)
Community Enhancement Fee Bonus-program ADUs only

Ask the City for a fee estimate on your square footage before you pay for full plans. Fees are paid online by e-check or card.

How to apply

  1. Find the zone and overlays in ZAPP: coastal, fire hazard, historic.
  2. Apply digitally in the City's Development Services Application Portal: under Building Applications choose "Building Construction". Changes after issue go in as "Construction Change to a Building Permit".
  3. Plan review, 30 days on a preapproved plan.
  4. Build and inspect. The permit lists the inspections; the final closes it. Since the August 2025 update most ADUs can then be split off and sold as condominiums after a 30-day offer to owner-occupant buyers; JADUs cannot.

What 1,278 San Diego ADU permits show

Measure City of San Diego ADUs
Permits, October 2023 to September 2026 1,278
Firms / active in the last 12 months 640 / 258
Usual filed value $127,372
Middle half of builders' usual job (93 firms with 3+ permits) $105,805 to $174,174
Reached final (permits a year or more old) 75.1%
Usual days from issue to final 442
Firms with a single permit 464 (72.5%)
Busiest / quietest month to file April (134) / September (58)

An ADU here is a long job: 442 days from issue to final is usual, and 75.1% of permits a year or more old had reached final. The field is fragmented: 72.5% of firms filed one ADU in three years and the busiest holds 2.8%, so ask any builder for addresses of finished San Diego ADUs and look them up. Values by size and home value: San Diego ADU cost; national: ADU construction cost.

Compare San Diego ADU builders by permits finished →

Related

Rules elsewhere: do I need a permit for an ADU. Unincorporated areas follow County rules: ADU cost in San Diego County. An existing unpermitted unit: can an unpermitted ADU be legalized. Past permits: San Diego building permit search. Counts by year: San Diego permit statistics.

What this does not tell you

Filed value is what the applicant declared and usually leaves out design, fees and site work. Our file does not say which ADUs used preapproved plans or the bonus program. IB 400 does not list fee amounts, so we give none.

How we know this

Permit, coastal, size, height, parking, sprinkler, solar, submittal, fee-category and application rules are quoted from the City of San Diego's Information Bulletin 400 (January 2026), read 26 October 2026; the owner-builder form from IB 301 and license classes from CSLB. Our figures are City of San Diego permits classified as ADUs, October 2023 to September 2026; the finished share uses permits a year or more old.

Numbers come from City of San Diego Development Services approvals, data through October 15, 2026. Nobody paid to be on this page and nobody can.

Questions

  • Do I need a permit to build an ADU in San Diego?

    Yes, always. Information Bulletin 400 says 'A Building Permit is required to create an ADU or JADU. There are no exemptions.' Depending on the number of units it is a Combination Building Permit or a Building Permit, and in the Coastal Overlay Zone most ADUs also need a Coastal Development Permit.

  • How big can an ADU be in San Diego?

    A new attached or detached ADU is 150 to 1,200 square feet of gross floor area. One ADU up to 800 square feet is allowed even if it pushes the lot over the zone's floor area ratio, and a conversion of existing space is not held to the 1,200 limit.

  • How long does an ADU permit take in San Diego?

    Plan review on the City's preapproved ADU plans is 30 days under AB 1332. Building takes longer: in our file the usual ADU permit reached final 442 days after it was issued.

  • What fees do you pay for an ADU in San Diego?

    IB 400 lists school fees, the General Plan Maintenance Fee on all ADUs and JADUs since 9 August 2022, Development Impact Fees under SDMC 142.0640(b)(1), and Regional Transportation Congestion Improvement Program fees when a project adds more than one ADU, plus building permit and plan check fees from Information Bulletin 501.

  • Do I need parking for an ADU in San Diego?

    Not outside the Coastal Overlay Zone. Inside it, a space is needed only in the Beach Impact Area outside a transit priority area, and even there not for an ADU of 500 square feet or less, an attached ADU, or a few other cases.