Contractor Records
Home › Guides › San Diego building permit search: how to look up permits on an address

San Diego building permit search: how to look up permits on an address

To look up an existing permit in the City of San Diego, start with Permit Finder, the City's map of permits back to 2003, searchable by address, parcel, project, permit or approval number. Development Services also lists OpenDSD Approval Search and Accela Citizen Access for newer filings (Records, read 23 October 2026). Our 42,447 San Diego approvals from October 2023 to September 2026 come from the City's Development Permits open data.

By Contractor Records · data through October 15, 2026

Where San Diego permits live

The City says you can "Conduct your own research for permits and applications from 2003 to present" for any City address, and self-service stations are available without an appointment during opening hours. OpenDSD takes the street number and the base road name ("Santa Fe" for 7325 W. Santa Fe St.); some permit types filed after 16 January 2018 are only in Accela (City of San Diego, read 22 October 2026).

These tools cover the City of San Diego only; other cities and unincorporated San Diego County keep their own records. None of the City's pages describe a contractor search; our compare pages group the City's approvals by firm.

How to look up the permits on a San Diego address

  1. Open Permit Finder and search the address or the parcel number.
  2. Click the parcel to list every permit and approval on it.
  3. For a permit from before 2018, open it in OpenDSD by project or approval number to see its status and inspections.
  4. For a recent permit, search Accela by record number.
  5. If you need the plans, not just the permit, book a records appointment (below).

How to read San Diego permit statuses

The City's data uses different words in the old and new systems. We treat these as finished:

Status in the record What it means Finished in our data?
Completed Signed off (pre-2021 system) Yes
Closed / Final Closed Closed after final Yes
Finaled Final inspection passed Yes
Issued Work allowed, not finished Not yet
Inspection Followup / Inspecting Inspections under way or a correction to clear Not yet

Closed rows carry a close date, which is how we time each firm's work. Completion rates use approvals a year or more old (San Diego about page, methodology).

When the permit you want is not online

Plans and paper files are not self-service. Development Services says building plans "require an in-person appointment with a team member", plans go back to about 1955, and copies cost $0.25 a page. Under California Health and Safety Code sections 19850 to 19853, plan copies need written permission from the current owner and the design professional who signed them (Information Bulletin 110). For homes built before 1955 the City points you to the County Assessor on 619-236-3771. Other records go through a Public Records Act request (read 23 October 2026).

What our San Diego file adds

Permit Finder answers "what was permitted on this parcel". We answer "what does this firm's San Diego record look like".

Trade Permits Firms Finished Usual days to final
Electrical, plumbing & HVAC (no-plan) 20,942 1,521 59.5% 84
Solar 10,027 423 73.3% 72
Remodel 1,681 534 79.1% 162
ADU 1,278 640 75.1% 442
Addition 671 422 82.7% 343
New home 389 91 91.1% 358

5,296 firms pulled the 42,447 approvals. Most small electrical, plumbing and HVAC jobs are filed under one combined no-plan permit, so they sit in one row; 59.5% of those a year or more old were finished.

The San Diego permit statistics page has the same file by trade, year and month; the firm lists are on the solar, remodel and ADU compare pages. To check the licence behind a name on a permit, use the San Diego contractor license lookup; to check whether your job needs a permit at all, see Do I need a permit?.

See every San Diego remodeler by finished permits →

What this does not tell you

Permit runners, designers and owner-builders are left out of our firm lists. Job values exist only on building permits. Our file covers October 2023 to September 2026.

How we know this

Search and records details are quoted from City of San Diego Development Services' Records page and Information Bulletin 110, read 22 and 23 October 2026. Statuses are from the City's development permits data, October 2023 to September 2026.

Numbers come from City of San Diego Development Services approvals, data through October 15, 2026. Nobody paid to be on this page and nobody can.

Questions

  • How do I find out if a permit was pulled on my house in San Diego?

    Search the address or parcel number in the City's Permit Finder map, which covers permits back to 2003. Open older permits in OpenDSD and newer ones in Accela Citizen Access.

  • Are San Diego building permits public record?

    Yes. The City says anyone can research permits and applications from 2003 on for a City address, online or at self-service stations. Plan copies are different: state law needs the owner's and the designer's written permission.

  • How do I get the plans for my San Diego house?

    Book a records appointment with Development Services. Plans go back to about 1955 and copies cost $0.25 a page; for older homes the City refers you to the County Assessor on 619-236-3771.

  • Can I search San Diego permits by contractor?

    The City's tools search by address, parcel, project or permit. Our San Diego compare pages list every approval from October 2023 to September 2026 under the firm that pulled it.

  • How long does a San Diego permit take to close?

    In our file the usual no-plan electrical, plumbing or HVAC permit closed in 84 days, a remodel in 162 and an ADU in 442.

Build your own list

Every firm with that kind of permit on record. Pick what you value. The list moves.