563 electrical permits were issued in the Town of Holly Springs, October 2025 through September 2026: about 563 a year and 21% of all permits. The busiest month is August. 27540 has the most, 486.

563permits issued
563last 12 months
Augbusiest month
$1,320usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2025 through September 2026.

Oct 2025: 35Oct2025Nov 2025: 32Dec 2025: 41Jan 2026: 40Jan2026Feb 2026: 31Mar 2026: 48Apr 2026: 55May 2026: 48Jun 2026: 46Jul 2026: 64JulAug 2026: 65Sep 2026: 58
The same numbers as a table
MonthPermits
Oct 202535
Nov 202532
Dec 202541
Jan 202640
Feb 202631
Mar 202648
Apr 202655
May 202648
Jun 202646
Jul 202664
Aug 202665
Sep 202658

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (139), February the quietest (66). A busy month at the permit counter usually means a longer wait for a contractor.

January: 85 (100 = an average month)February: 66 (100 = an average month)March: 102 (100 = an average month)April: 117 (100 = an average month)May: 102 (100 = an average month)June: 98 (100 = an average month)July: 136 (100 = an average month)August: 139 (100 = an average month)139September: 124 (100 = an average month)October: 75 (100 = an average month)November: 68 (100 = an average month)December: 87 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January85
February66
March102
April117
May102
June98
July136
August139
September124
October75
November68
December87

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 520 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$1,320
Middle half$1,000–$2,565

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the town's 563 electrical permits.

ZIP codePermitsShare
2754048686%
275396011%
275621under 1%

Download this table (CSV)

The town's own permit types

How the town filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical Single Trade48987%
Conditional Power387%
Generator366%

Download this table (CSV)

Other kinds of work here

Nearby permit data

Electrical permits for other places in Raleigh–Durham. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Town of Holly Springs Monthly Reporting, Permits Issued reports (xlsx), read 19 Oct 2026. We count permits issued October 2025 through September 2026; denied and withdrawn permits are left out. The town's monthly reports list permits as they were issued, with a status on only some months, so they can't show which permits were later finished, so no finished share is shown.

Building and trade permits the Town of Holly Springs issued for property in the town and its planning area: new homes, home alterations and additions, HVAC and water heater change-outs, electrical, plumbing, pool, solar, sign and commercial building permits. Wake County, Apex, Fuquay-Varina, Cary and Raleigh run their own permit offices and are not in this file (some Holly Springs addresses carry an Apex or Fuquay-Varina mailing ZIP). Zoning-only, driveway, encroachment, utility, civil drawing, alcohol (ABC) and temporary-use permits are left out.

  • The town posts only its last 12 monthly Permits Issued reports, so these pages cover 12 months (October 2025 to September 2026) and can't compare with the year before.
  • The reports name no contractor, so there are no contractor lists, rankings or firm pages for Holly Springs.
  • The reports have no final inspection date or kept-up status, so we show no finished share and no time to final.
  • The value is the total valuation declared on the permit, which sets the fee. It is not a final cost.
  • Home additions include sunrooms and screened porches; decks, covered porches and detached accessory buildings are counted as garages, sheds and shade structures.
  • Homes means single-family houses, townhouses and duplexes; apartments and commercial buildings are counted as other.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in the Town of Holly Springs, NC", https://contractorrecords.com/holly-springs/electrical-permits, data through September 2026, from Town of Holly Springs Development Services building-permit records.

Link to a table: By month · Season · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: declared value · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Holly Springs issue a year?About 563 a year in the Town of Holly Springs: 563 permits issued October 2025 through September 2026, 563 of them in the last 12 months.
  • When do people in Holly Springs file the most electrical permits?August (139 against an average month of 100); February is the quietest (66). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Holly Springs?27540, with 486 of the 563 (86%); then 27539 (60).