14,557 building permits issued in Irving, March 2023 through February 2025: about 7,278 a year. The biggest kind of work is plumbing, with 3,275. 6,743 permits in the last 12 months on file (Mar 2024–Feb 2025), 14% fewer than the 7,814 in the 12 months before. 70% were permits for homes. The busiest month for permits is May.

14,557permits issued
6,743last 12 months on file
−14%vs the 12 months before
70%for homes
Maybusiest month
Feb 2025records through

By kind of work

Permits issued March 2023 through February 2025. Last 12 months on file is Mar 2024–Feb 2025; the 12 months before is Mar 2023–Feb 2024. Homes is the share issued as residential permits. Busiest month is the calendar month with the most permits on average.

Kind of workPermitsShareLast 12 mo12 mo beforeChangeHomesBusiest month
Plumbing3,27522%1,6201,655−2%75%January
Roofing1,80812%5531,255−56%93%May
Electrical1,67311%833840−1%51%June
HVAC1,3629%614748−18%85%July
Remodels & repairs1,3039%601702−14%100%October
Fences & walls9977%504493+2%81%March
Garages, sheds & shade structures4933%242251−4%100%May
Solar4233%174249−30%98%October
New homes3612%171190−10%100%October
Additions1601%7783−7%100%October
Demolition136under 1%7561+23%46%December
Other2,50517%1,2541,2510%15%June

Fewer than 100 permits, so no row: pools & spas (61).

Download this table (CSV)

By year

Permits issued in each calendar year of the window. Per year scales a part year to 12 months.

YearMonthsPermitsPer year
2023 (from March)106,5977,916
2024126,9096,909
2025 (through February)21,0516,306

Download this table (CSV)

By month

Permits issued each month, March 2023 through February 2025. The tallest bar is the busiest month on file.

Mar 2023: 665Mar2023Apr 2023: 702May 2023: 769Jun 2023: 759Jul 2023: 639JulAug 2023: 691Sep 2023: 585Oct 2023: 714Nov 2023: 601Dec 2023: 472Jan 2024: 626Jan2024Feb 2024: 591Mar 2024: 567Apr 2024: 597May 2024: 633Jun 2024: 551Jul 2024: 601JulAug 2024: 617Sep 2024: 541Oct 2024: 608Nov 2024: 490Dec 2024: 487Jan 2025: 499Jan2025Feb 2025: 552
The same numbers as a table
MonthPermits
Mar 2023665
Apr 2023702
May 2023769
Jun 2023759
Jul 2023639
Aug 2023691
Sep 2023585
Oct 2023714
Nov 2023601
Dec 2023472
Jan 2024626
Feb 2024591
Mar 2024567
Apr 2024597
May 2024633
Jun 2024551
Jul 2024601
Aug 2024617
Sep 2024541
Oct 2024608
Nov 2024490
Dec 2024487
Jan 2025499
Feb 2025552

Download this table (CSV)

When each kind of work is filed

Permits by calendar month, 100 = an average month (the thin line), March 2023 through February 2025. Kinds of work do not all peak together. Each month is counted twice (once a year), so one unusual month still moves these numbers.

Plumbing

3,275 permits · busiest January, quietest June

January: 121 (100 = an average month)121February: 113 (100 = an average month)March: 96 (100 = an average month)April: 90 (100 = an average month)May: 90 (100 = an average month)June: 86 (100 = an average month)July: 87 (100 = an average month)August: 103 (100 = an average month)September: 92 (100 = an average month)October: 109 (100 = an average month)November: 104 (100 = an average month)December: 109 (100 = an average month)JFMAMJJASOND

Roofing

1,808 permits · busiest May, quietest December

January: 67 (100 = an average month)February: 75 (100 = an average month)March: 84 (100 = an average month)April: 166 (100 = an average month)May: 196 (100 = an average month)196June: 127 (100 = an average month)July: 97 (100 = an average month)August: 104 (100 = an average month)September: 86 (100 = an average month)October: 90 (100 = an average month)November: 60 (100 = an average month)December: 48 (100 = an average month)JFMAMJJASOND

Electrical

1,673 permits · busiest June, quietest September

January: 88 (100 = an average month)February: 92 (100 = an average month)March: 118 (100 = an average month)April: 86 (100 = an average month)May: 111 (100 = an average month)June: 126 (100 = an average month)126July: 88 (100 = an average month)August: 111 (100 = an average month)September: 85 (100 = an average month)October: 92 (100 = an average month)November: 113 (100 = an average month)December: 91 (100 = an average month)JFMAMJJASOND

HVAC

1,362 permits · busiest July, quietest December

January: 72 (100 = an average month)February: 70 (100 = an average month)March: 82 (100 = an average month)April: 110 (100 = an average month)May: 122 (100 = an average month)June: 137 (100 = an average month)July: 143 (100 = an average month)143August: 123 (100 = an average month)September: 93 (100 = an average month)October: 107 (100 = an average month)November: 78 (100 = an average month)December: 63 (100 = an average month)JFMAMJJASOND

Remodels & repairs

1,303 permits · busiest October, quietest November

January: 82 (100 = an average month)February: 106 (100 = an average month)March: 114 (100 = an average month)April: 104 (100 = an average month)May: 99 (100 = an average month)June: 88 (100 = an average month)July: 96 (100 = an average month)August: 112 (100 = an average month)September: 109 (100 = an average month)October: 134 (100 = an average month)134November: 75 (100 = an average month)December: 82 (100 = an average month)JFMAMJJASOND

Fences & walls

997 permits · busiest March, quietest December

January: 76 (100 = an average month)February: 107 (100 = an average month)March: 114 (100 = an average month)114April: 112 (100 = an average month)May: 111 (100 = an average month)June: 110 (100 = an average month)July: 96 (100 = an average month)August: 113 (100 = an average month)September: 95 (100 = an average month)October: 104 (100 = an average month)November: 90 (100 = an average month)December: 72 (100 = an average month)JFMAMJJASOND

Garages, sheds & shade structures

493 permits · busiest May, quietest December

January: 90 (100 = an average month)February: 83 (100 = an average month)March: 112 (100 = an average month)April: 127 (100 = an average month)May: 134 (100 = an average month)134June: 80 (100 = an average month)July: 110 (100 = an average month)August: 97 (100 = an average month)September: 105 (100 = an average month)October: 100 (100 = an average month)November: 105 (100 = an average month)December: 58 (100 = an average month)JFMAMJJASOND

Solar

423 permits · busiest October, quietest January

January: 43 (100 = an average month)February: 54 (100 = an average month)March: 125 (100 = an average month)April: 125 (100 = an average month)May: 113 (100 = an average month)June: 108 (100 = an average month)July: 122 (100 = an average month)August: 108 (100 = an average month)September: 96 (100 = an average month)October: 136 (100 = an average month)136November: 88 (100 = an average month)December: 82 (100 = an average month)JFMAMJJASOND
The same numbers as a table
Kind of workJanFebMarAprMayJunJulAugSepOctNovDec
Plumbing121113969090868710392109104109
Roofing6775841661961279710486906048
Electrical88921188611112688111859211391
HVAC727082110122137143123931077863
Remodels & repairs821061141049988961121091347582
Fences & walls7610711411211111096113951049072
Garages, sheds & shade structures9083112127134801109710510010558
Solar4354125125113108122108961368882

Download this table (CSV)

Homes and everything else

How the city classed each permit. Other covers commercial buildings, signs, towers and similar work.

Permit classPermitsShareLast 12 mo
Homes (residential)10,19170%4,628
Other4,36630%2,115

Download this table (CSV)

By ZIP code

The 10 ZIP codes with the most permits, counted at the property's ZIP code. A ZIP code can cross into a city that runs its own permit office; only the city's permits are counted.

ZIP codePermitsShareTop kind of work
750623,71326%Roofing (862)
750632,89320%Plumbing (772)
750602,76219%Plumbing (498)
750612,67018%Plumbing (646)
750381,3599%Plumbing (335)
750398696%Plumbing (159)
7501935under 1%Solar (9)
761159under 1%Other
750143under 1%Other
752613under 1%Demolition (1)

All 6 ZIP codes with 250+ permits →

Download this table (CSV)

How Irving compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Permit statistics for other places in Dallas–Fort Worth. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Irving ArcGIS Online, Residential Permits Issued (Feb 15, 2022 to present) and Commercial Permits Issued (2/15/22 to present), read 23 Oct 2026. We count permits issued March 2023 through February 2025; denied and withdrawn permits are left out. Only the city's commercial permit table carries a status and a finaled date, and the residential table, which holds most permits, has neither, so no finished share is shown.

Building and trade permits the City of Irving issued inside the city limits, from the city's residential and commercial issued-permit tables. Certificates of occupancy, temporary-use and event permits are left out.

  • The city's files name no contractor, so there are no contractor lists, rankings or firm pages for Irving.
  • The city's tables stop at February 28, 2025 and have not been updated since, so these pages end with February 2025.
  • Homes and other buildings come from two separate city tables: every permit in the residential table counts as a home, every permit in the commercial table as other property.
  • Only the commercial table has a status and a finaled date, so we show no finished share and no time to final.
  • The value is the valuation declared on the permit; for trade permits it is often a small figure for the trade work only.
  • Withdrawn commercial permits are left out. Alteration permits are sorted into a trade where the city's description names one (roof, HVAC, plumbing, electrical, solar).

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Irving, TX building permit statistics", https://contractorrecords.com/irving/permit-statistics, data through February 2025, from City of Irving Inspections building-permit records.

Link to a table: By kind of work · By year · By month · When each kind of work is filed · Homes and everything else · By ZIP code.

Download the tables (CSV): Permits by kind of work · Permits by year · Permits by month · Permits by calendar month (index) · Homes and other permits · Permits by ZIP code.

Common questions

  • How many building permits does Irving issue a year?About 7,278 a year in Irving: 14,557 permits over 24 months, March 2023 through February 2025. 6,743 permits in the last 12 months on file (Mar 2024–Feb 2025), 14% fewer than the 7,814 in the 12 months before.
  • Are building permits up or down in Irving?6,743 permits in the last 12 months on file (Mar 2024–Feb 2025), 14% fewer than the 7,814 in the 12 months before. Demolition permits grew most (61 to 75); roofing permits fell most (1,255 to 553).
  • What is the busiest month for permits in Irving?May, counting every kind of work (116 against an average month of 100). December is the quietest (79). Each kind of work has its own season; the charts above show them.
  • What share of Irving permits are for homes?70%: 10,191 of the 14,557 permits issued March 2023 through February 2025 were residential permits.