2,115 building permits issued in Murphy, October 2024 through September 2026: about 1,058 a year. The biggest kind of work is roofing, with 1,065. 1,025 permits in the last 12 months (Oct 2025–Sep 2026), 6% fewer than the 1,090 in the 12 months before. 100% were permits for homes. The busiest month for permits is May.

What this file covers: The appraisal district records Murphy's permits on homes only: commercial permits are not counted.

2,115permits issued
1,025last 12 months
−6%vs the 12 months before
100%for homes
Maybusiest month
Sep 2026records through

By kind of work

Permits issued October 2024 through September 2026. Last 12 months is Oct 2025–Sep 2026; the 12 months before is Oct 2024–Sep 2025. Homes is the share issued as residential permits. Busiest month is the calendar month with the most permits on average.

Kind of workPermitsShareLast 12 mo12 mo beforeChangeHomesBusiest month
Roofing1,06550%488577−15%100%June
Remodels & repairs27913%135144−6%100%February
HVAC25112%128123+4%100%April
Plumbing20810%11494+21%100%October
Garages, sheds & shade structures1045%4658−21%100%February

Fewer than 100 permits, so no row: new homes (49), electrical (33), pools & spas (32), solar (26), fences & walls (12), additions (9), demolition (8), other (39).

Download this table (CSV)

By year

Permits issued in each calendar year of the window. Per year scales a part year to 12 months.

YearMonthsPermitsPer year
2024 (from October)3125500
2025121,3221,322
2026 (through September)9668891

Download this table (CSV)

By month

Permits issued each month, October 2024 through September 2026. The tallest bar is the busiest month on file.

Oct 2024: 42Oct2024Nov 2024: 46Dec 2024: 37Jan 2025: 20Jan2025Feb 2025: 52Mar 2025: 45Apr 2025: 123May 2025: 142Jun 2025: 154Jul 2025: 133JulAug 2025: 132Sep 2025: 164Oct 2025: 155Nov 2025: 115Dec 2025: 87Jan 2026: 69Jan2026Feb 2026: 103Mar 2026: 80Apr 2026: 35May 2026: 96Jun 2026: 70Jul 2026: 69JulAug 2026: 82Sep 2026: 64
The same numbers as a table
MonthPermits
Oct 202442
Nov 202446
Dec 202437
Jan 202520
Feb 202552
Mar 202545
Apr 2025123
May 2025142
Jun 2025154
Jul 2025133
Aug 2025132
Sep 2025164
Oct 2025155
Nov 2025115
Dec 202587
Jan 202669
Feb 2026103
Mar 202680
Apr 202635
May 202696
Jun 202670
Jul 202669
Aug 202682
Sep 202664

Download this table (CSV)

When each kind of work is filed

Permits by calendar month, 100 = an average month (the thin line), October 2024 through September 2026. Kinds of work do not all peak together. Each month is counted twice (once a year), so one unusual month still moves these numbers.

Roofing

1,065 permits · busiest June, quietest January

January: 36 (100 = an average month)February: 55 (100 = an average month)March: 55 (100 = an average month)April: 75 (100 = an average month)May: 157 (100 = an average month)June: 159 (100 = an average month)159July: 123 (100 = an average month)August: 131 (100 = an average month)September: 143 (100 = an average month)October: 119 (100 = an average month)November: 82 (100 = an average month)December: 64 (100 = an average month)JFMAMJJASOND

Remodels & repairs

279 permits · busiest February, quietest June

January: 60 (100 = an average month)February: 168 (100 = an average month)168March: 77 (100 = an average month)April: 103 (100 = an average month)May: 103 (100 = an average month)June: 47 (100 = an average month)July: 60 (100 = an average month)August: 99 (100 = an average month)September: 129 (100 = an average month)October: 99 (100 = an average month)November: 163 (100 = an average month)December: 90 (100 = an average month)JFMAMJJASOND

HVAC

251 permits · busiest April, quietest December

January: 48 (100 = an average month)February: 57 (100 = an average month)March: 81 (100 = an average month)April: 153 (100 = an average month)153May: 143 (100 = an average month)June: 143 (100 = an average month)July: 115 (100 = an average month)August: 139 (100 = an average month)September: 129 (100 = an average month)October: 81 (100 = an average month)November: 67 (100 = an average month)December: 43 (100 = an average month)JFMAMJJASOND

Plumbing

208 permits · busiest October, quietest February

January: 98 (100 = an average month)February: 46 (100 = an average month)March: 144 (100 = an average month)April: 58 (100 = an average month)May: 98 (100 = an average month)June: 98 (100 = an average month)July: 115 (100 = an average month)August: 81 (100 = an average month)September: 121 (100 = an average month)October: 162 (100 = an average month)162November: 69 (100 = an average month)December: 110 (100 = an average month)JFMAMJJASOND

Garages, sheds & shade structures

104 permits · busiest February, quietest January

January: 12 (100 = an average month)February: 185 (100 = an average month)185March: 69 (100 = an average month)April: 104 (100 = an average month)May: 104 (100 = an average month)June: 173 (100 = an average month)July: 127 (100 = an average month)August: 69 (100 = an average month)September: 104 (100 = an average month)October: 92 (100 = an average month)November: 127 (100 = an average month)December: 35 (100 = an average month)JFMAMJJASOND
The same numbers as a table
Kind of workJanFebMarAprMayJunJulAugSepOctNovDec
Roofing365555751571591231311431198264
Remodels & repairs60168771031034760991299916390
HVAC485781153143143115139129816743
Plumbing98461445898981158112116269110
Garages, sheds & shade structures1218569104104173127691049212735

Download this table (CSV)

Homes and everything else

How the city classed each permit. Other covers commercial buildings, signs, towers and similar work.

Permit classPermitsShareLast 12 mo
Homes (residential)2,115100%1,025
Other00%0

Download this table (CSV)

How Murphy compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Permit statistics for other places in Dallas–Fort Worth. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Collin Central Appraisal District, building permits (data.texas.gov dataset 82ee-gbj5), rows for the City of Murphy, read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The appraisal district's copy has no status and no final date, so no finished share is shown.

Permits the City of Murphy issues for homes, as the Collin Central Appraisal District records them: re-roofs, mechanical, plumbing and electrical work, foundation repairs, windows, new houses, accessory buildings, solar, pools, additions, remodels and demolition. Commercial property is not counted. Murphy lies wholly in Collin County, and the countywide Collin County file is not published on this site, so nothing here is counted twice.

  • Murphy does not publish its own permit file; these are the city's permits on homes as the Collin Central Appraisal District records them from the city's monthly permit reports.
  • The district's copy names a builder or contractor on most permits. We show how many permits the most active ones filed, which is volume, not quality; we have not matched them to Texas license records.
  • The district's copy has no status and no final date, so there is no finished share and no time to final.
  • Re-roof permits jumped from a handful a month to about a hundred from April 2025 and eased off in 2026; the file does not say why.
  • Mechanical, plumbing, electrical, foundation and window permits are filed as miscellaneous and sorted into a kind of work from the district's short note; a few with no note count as other.
  • The value is the permit value the district recorded; most permits carry one.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Murphy, TX building permit statistics", https://contractorrecords.com/murphy-tx/permit-statistics, data through September 2026, from the City of Murphy (as recorded by the Collin Central Appraisal District) building-permit records.

Link to a table: By kind of work · By year · By month · When each kind of work is filed · Homes and everything else.

Download the tables (CSV): Permits by kind of work · Permits by year · Permits by month · Permits by calendar month (index) · Homes and other permits.

Common questions

  • How many building permits does Murphy issue a year?About 1,058 a year in Murphy: 2,115 permits over 24 months, October 2024 through September 2026. 1,025 permits in the last 12 months (Oct 2025–Sep 2026), 6% fewer than the 1,090 in the 12 months before.
  • Are building permits up or down in Murphy?1,025 permits in the last 12 months (Oct 2025–Sep 2026), 6% fewer than the 1,090 in the 12 months before. Plumbing permits grew most (94 to 114); roofing permits fell most (577 to 488).
  • What is the busiest month for permits in Murphy?May, counting every kind of work (135 against an average month of 100). January is the quietest (50). Each kind of work has its own season; the charts above show them.
  • What share of Murphy permits are for homes?100%: 2,115 of the 2,115 permits issued October 2024 through September 2026 were residential permits.