Contractor Records
Home › King County › New homes

New home permits in unincorporated King County, WA

Data through September 2026 · updated 23 Oct 2026

380 new home permits were issued in unincorporated King County, October 2024 through September 2026: about 190 a year and 5% of all permits. 148 new home permits in the last 12 months (Oct 2025–Sep 2026), 36% fewer than the 232 in the 12 months before. The busiest month is June. 98003 has the most, 42.

380permits issued
148last 12 months
Junbusiest month
$511,052usual declared value
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 23Oct2024Nov 2024: 11Dec 2024: 19Jan 2025: 21Jan2025Feb 2025: 16Mar 2025: 25Apr 2025: 15May 2025: 15Jun 2025: 27Jul 2025: 20JulAug 2025: 19Sep 2025: 21Oct 2025: 21Nov 2025: 12Dec 2025: 8Jan 2026: 9Jan2026Feb 2026: 11Mar 2026: 13Apr 2026: 15May 2026: 7Jun 2026: 19Jul 2026: 11JulAug 2026: 11Sep 2026: 11
The same numbers as a table
MonthPermits
Oct 202423
Nov 202411
Dec 202419
Jan 202521
Feb 202516
Mar 202525
Apr 202515
May 202515
Jun 202527
Jul 202520
Aug 202519
Sep 202521
Oct 202521
Nov 202512
Dec 20258
Jan 20269
Feb 202611
Mar 202613
Apr 202615
May 20267
Jun 202619
Jul 202611
Aug 202611
Sep 202611

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (145), May the quietest (69). A busy month at the permit counter usually means a longer wait for a contractor.

January: 95 (100 = an average month)February: 85 (100 = an average month)March: 120 (100 = an average month)April: 95 (100 = an average month)May: 69 (100 = an average month)June: 145 (100 = an average month)145July: 98 (100 = an average month)August: 95 (100 = an average month)September: 101 (100 = an average month)October: 139 (100 = an average month)November: 73 (100 = an average month)December: 85 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January95
February85
March120
April95
May69
June145
July98
August95
September101
October139
November73
December85

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 358 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$511,052
Middle half$355,644–$810,156

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the county's 380 new home permits.

ZIP codePermitsShare
980034211%
98001328%
98178298%
98042236%
98022226%
98038205%
98045185%
98146185%
98072174%
98053174%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Building/Dwelling-Single35593%
Residential Building/Dwelling-Mobile257%

Download this table (CSV)

Nearby permit data

New home permits for other places in Seattle and Puget Sound. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: King County Local Services, monthly Issued Permits Reports (Excel), read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The county's monthly report shows each permit's status only as of the month it was issued and never updates it, so no finished share is shown.

Building permits King County Local Services issues for unincorporated land only: homes, additions, remodels, heating and mechanical, demolition and commercial buildings. Seattle, Bellevue, Redmond, Kent, Renton and the other cities issue their own permits; Seattle and Bellevue have their own pages on this site. Fire, grading and right-of-way permits are not counted.

  • King County publishes its issued permits as a monthly spreadsheet; these pages stack the reports from October 2024 on.
  • Each permit is listed once, in the month it was issued, with its status as of that report, so the file can't say which permits were later finished, and there is no final date.
  • The county's file names no contractor (only the applicant, often the homeowner), so there are no contractor lists, rankings or firm pages for King County.
  • Electrical permits in unincorporated King County come from Washington Labor & Industries and plumbing permits from Public Health, so there are no electrical or plumbing counts here.
  • Residential mechanical permits (heat pumps, furnaces, ducts) are over half of the county's permits and carry no declared value; values are the job value on the other permits.
  • Additions, accessory buildings and remodels are split out of the county's addition/improvement permits by their descriptions.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in unincorporated King County, WA", https://contractorrecords.com/king-county/new-home-permits, data through September 2026, from King County Department of Local Services, Permitting building-permit records.

Link to a table: By month · Season · Declared value · By ZIP code · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: declared value · New homes permits by ZIP code · New homes permits by permit type.

Common questions

  • How many new home permits does King County issue a year?About 190 a year in unincorporated King County: 380 permits issued October 2024 through September 2026, 148 of them in the last 12 months.
  • When do people in King County file the most new home permits?June (145 against an average month of 100); May is the quietest (69). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in King County?98003, with 42 of the 380 (11%); then 98001 (32).