Building permits by ZIP code in Charlotte and the rest of Mecklenburg County

Data through September 2026 · updated 26 Oct 2026

29 ZIP codes have 250 or more building permits in Charlotte and the rest of Mecklenburg County, June 2025 through September 2026. 28078 is the busiest with 11,343 (8% of 143,503). Together they hold 100% of the permits.

ZIP codes by permits

Busiest first, June 2025 through September 2026. Top kind of work is the one with the most permits in that ZIP code.

ZIP codePermitsShareTop kind of work
2807811,3438%Electrical (4,195)
282779,2086%Electrical (4,032)
282698,5156%Electrical (3,324)
282117,2175%Electrical (2,825)
282156,7925%Electrical (2,406)
282266,6955%Electrical (2,669)
282166,4484%Electrical (2,271)
282106,3084%Electrical (2,578)
282786,0564%Electrical (2,340)
282056,0464%Electrical (2,403)
282085,4024%Electrical (1,870)
282145,3444%Electrical (1,819)
282705,2054%Electrical (2,119)
281055,0754%Electrical (2,054)
282275,0504%Electrical (2,014)
282095,0073%Electrical (1,852)
280314,9413%Electrical (1,915)
282624,4013%Electrical (1,610)
282134,2313%Electrical (1,563)
282733,9533%Electrical (1,632)
282032,9142%Electrical (1,208)
280362,8432%Electrical (1,173)
282072,6652%Electrical (1,057)
282022,5522%Electrical (1,171)
282172,4602%Electrical (946)
281342,0151%Electrical (727)
282121,7961%Electrical (725)
282061,7691%Electrical (547)
282041,158under 1%Electrical (496)

6 more ZIP codes have fewer than 250 permits each (84 in all), so no page.

Download this table (CSV)

How these numbers are made

Source: Mecklenburg County GIS, AccelaAllPermits FeatureServer layer 0, with the older BuildingPermits layer for permits still issued in the old system, read 26 Oct 2026. We count permits issued June 2025 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Mecklenburg County Code Enforcement issued anywhere in the county: Charlotte, the towns of Huntersville, Cornelius, Matthews, Mint Hill, Davidson and Pineville, and unincorporated land. The county issues building, electrical, mechanical and plumbing permits for every town, so this one file covers them all. Fire, sign and site-work permits count as other.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Mecklenburg County or Charlotte.
  • The county moved its permits to a new system (Accela) in spring 2025. The window starts in June 2025, once the new system's file was filling at its usual rate, so it covers 16 months and there is no comparison with the 12 months before. Permits still issued under the old system for older projects come from the county's older building permit layer and are counted too.
  • Electrical, mechanical (HVAC) and plumbing permits are only in the new system's file. Each new home gets its own electrical, mechanical and plumbing permits, and those count under those trades. Monthly plumbing and electrical counts keep rising through early 2026 as projects started under the old system finish.
  • The new system files an equipment changeout as an umbrella record with separate mechanical, electrical or plumbing permits under it; we count the trade permits, not the umbrella record.
  • The kind of work comes from the county's type of work and census building code; roofing, solar, pools, additions and decks are picked out of residential alteration permits by their descriptions.
  • Job value is the building cost the applicant declared on the permit; most trade permits have none. A final date is the county's completion date.
  • Apartment, condo and hotel buildings count as other, not as homes. Cancelled, withdrawn and replaced permits are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits by ZIP code in Charlotte and the rest of Mecklenburg County", https://contractorrecords.com/mecklenburg-county/zip/, data through September 2026, from Mecklenburg County Code Enforcement building-permit records.

Link to a table: ZIP codes by permits.

Download the tables (CSV): ZIP codes by permits.

Common questions

  • Which ZIP code in Mecklenburg County has the most building permits?28078, with 11,343 permits, June 2025 through September 2026; then 28277 (9,208).
  • Can I see the permits for one address in Mecklenburg County?Not here: we publish permits by ZIP code without street addresses. The county keeps each property's permit history; search its records by address or permit number.