Contractor Records
Home › Mecklenburg County › ZIP 28262

Building permits in 28262, Charlotte and the rest of Mecklenburg County

Data through September 2026 · updated 26 Oct 2026

4,401 building permits were issued in ZIP code 28262 by Mecklenburg County Code Enforcement, June 2025 through September 2026: 3% of the 143,503 in Charlotte and the rest of Mecklenburg County, the 18th busiest ZIP code. Electrical permits lead with 1,610. Permits from a city that runs its own permit office are not counted.

4,401permits in 28262
3,759last 12 months
66%for homes
63days, usual issue to final
Sep 2026records through

Permits in 28262 by kind of work

Share here is the part of the 4,401 permits in 28262; countywide is the same for all of Charlotte and the rest of Mecklenburg County.

Kind of workPermitsShare hereCountywide
Electrical1,61037%39%
HVAC1,16827%29%
Plumbing60514%12%
New homes58013%7%
Remodels & repairs37under 1%3%
Demolition25under 1%1%
Garages, sheds & shade structures21under 1%1%
Additions19under 1%1%
Solar9under 1%under 1%
Roofing4under 1%under 1%
Pools & spas3under 1%under 1%
ADUs & casitas1under 1%under 1%
Other3197%5%

Download this table (CSV)

Permits in 28262 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2025 (from June)71,2742,184
2026 (through September)93,1274,169

Download this table (CSV)

How permits in 28262 finish

Permits issued Jun 2025–Sep 2025, at least 12 months before the file ends.

Measure28262Countywide
Permits issued Jun 2025–Sep 202564230,481
Finished71.5%82.0%
Expired17.8%12.0%
Usual days, issue to final6363

Download this table (CSV)

How these numbers are made

Source: Mecklenburg County GIS, AccelaAllPermits FeatureServer layer 0, with the older BuildingPermits layer for permits still issued in the old system, read 26 Oct 2026. We count permits issued June 2025 through September 2026; denied and withdrawn permits are left out.

Building and trade permits that Mecklenburg County Code Enforcement issued anywhere in the county: Charlotte, the towns of Huntersville, Cornelius, Matthews, Mint Hill, Davidson and Pineville, and unincorporated land. The county issues building, electrical, mechanical and plumbing permits for every town, so this one file covers them all. Fire, sign and site-work permits count as other.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for Mecklenburg County or Charlotte.
  • The county moved its permits to a new system (Accela) in spring 2025. The window starts in June 2025, once the new system's file was filling at its usual rate, so it covers 16 months and there is no comparison with the 12 months before. Permits still issued under the old system for older projects come from the county's older building permit layer and are counted too.
  • Electrical, mechanical (HVAC) and plumbing permits are only in the new system's file. Each new home gets its own electrical, mechanical and plumbing permits, and those count under those trades. Monthly plumbing and electrical counts keep rising through early 2026 as projects started under the old system finish.
  • The new system files an equipment changeout as an umbrella record with separate mechanical, electrical or plumbing permits under it; we count the trade permits, not the umbrella record.
  • The kind of work comes from the county's type of work and census building code; roofing, solar, pools, additions and decks are picked out of residential alteration permits by their descriptions.
  • Job value is the building cost the applicant declared on the permit; most trade permits have none. A final date is the county's completion date.
  • Apartment, condo and hotel buildings count as other, not as homes. Cancelled, withdrawn and replaced permits are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 28262, Charlotte and the rest of Mecklenburg County", https://contractorrecords.com/mecklenburg-county/zip/28262, data through September 2026, from Mecklenburg County Code Enforcement building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 28262 by kind of work · Permits in 28262 by year · Permits in 28262: finished and days to final.

Common questions

  • How many building permits were issued in 28262?4,401 permits issued by the county in ZIP code 28262, June 2025 through September 2026: 1,610 electrical, 1,168 HVAC, 605 plumbing. 3,759 were in the last 12 months.
  • What is built most in 28262?Electrical: 1,610 of the 4,401 permits (37%), against 39% countywide.
  • How long does a permit take in 28262?The usual permit issued here Jun 2025–Sep 2025 took 63 days from issue to final (456 permits with a final date), against 63 days countywide.
  • Who did the work in 28262?The county's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the county.