Contractor Records
Mesa › Firms › Solar Topps
SO

Solar Topps: building permits in Mesa, AZ

Solar Topps pulled 11 building permits in Mesa, AZ from Jan 2024 to Nov 2025, 3 in the last 12 months, across 2 trades (battery storage & solar, electrical). Top 9 of 47 for battery storage & solar in Mesa · name on permits: SOLAR TOPPS

11matching permits
3last 12 months
2trades
Limitedevidence strength

Building permits by Solar Topps

TradePermitsLast 12 moUsual filed valuevs tradeActiveEvidenceList position
Battery Storage & Solar103$40k2.9× the usual for the tradeJan 2024 – Nov 2025Limited#9 of 47
Electrical10——Dec 2024 – Dec 2024Limited—

List position: where the firm lands on the Mesa comparison for that trade at default settings (or at a typical budget), among firms without a license problem. It's a match score from public records, not a quality rating.

Filed value is what was written on the permit, not a quote or final bill; a usual value needs 5 or more priced permits in the trade. Some jobs never need a permit.

License

Complaints, lawsuits and the permit record

Our record covers building permits, not complaints or court cases. In Mesa, AZ, Solar Topps pulled 11 permits 2024–2025. To check complaints and lawsuits, search Arizona ROC (Arizona Registrar of Contractors), BBB complaints for Solar Topps and Maricopa County court records.

We never say whether a complaint or lawsuit exists: we do not hold those records.

Questions

Where Solar Topps works

The ZIP codes where Solar Topps filed the most of its 11 permits on homes in Mesa, counted at each property's ZIP code. A ZIP code opens every permit we track there and the most active firms in each trade.

Mesa permits by ZIP code →

Similar solar installers in Mesa

The 5 solar installers closest to Solar Topps's 10 battery storage & solar permits. Similar volume, not similar quality.

Compare all Mesa solar installers →

Compare Solar Topps with other Mesa battery storage & solar contractors

Every permit record in the city, side by side. Pick what you value. The list moves.

Source: public permit records (Mesa), matched by contractor name. How the records work. Something wrong? Firms can request a correction.