592 new home permits were issued in the City of Prattville, June 2020 through May 2022: about 296 a year and 13% of all permits. 282 new home permits in the last 12 months on file (Jun 2021–May 2022), 9% fewer than the 310 in the 12 months before. The busiest month is April.

592permits issued
282last 12 months on file
Aprbusiest month
May 2022records through

New home permits by month

Permits issued each month, June 2020 through May 2022.

Jun 2020: 28Jun2020Jul 2020: 35JulAug 2020: 36Sep 2020: 21Oct 2020: 36Nov 2020: 18Dec 2020: 28Jan 2021: 15Jan2021Feb 2021: 11Mar 2021: 32Apr 2021: 30May 2021: 20Jun 2021: 12Jul 2021: 31JulAug 2021: 11Sep 2021: 33Oct 2021: 17Nov 2021: 21Dec 2021: 21Jan 2022: 33Jan2022Feb 2022: 22Mar 2022: 28Apr 2022: 38May 2022: 15
The same numbers as a table
MonthPermits
Jun 202028
Jul 202035
Aug 202036
Sep 202021
Oct 202036
Nov 202018
Dec 202028
Jan 202115
Feb 202111
Mar 202132
Apr 202130
May 202120
Jun 202112
Jul 202131
Aug 202111
Sep 202133
Oct 202117
Nov 202121
Dec 202121
Jan 202233
Feb 202222
Mar 202228
Apr 202238
May 202215

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (138), February the quietest (67). A busy month at the permit counter usually means a longer wait for a contractor.

January: 97 (100 = an average month)February: 67 (100 = an average month)March: 122 (100 = an average month)April: 138 (100 = an average month)138May: 71 (100 = an average month)June: 81 (100 = an average month)July: 134 (100 = an average month)August: 95 (100 = an average month)September: 109 (100 = an average month)October: 107 (100 = an average month)November: 79 (100 = an average month)December: 99 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January97
February67
March122
April138
May71
June81
July134
August95
September109
October107
November79
December99

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential: New Building57397%
Residential: Manufactured Home Installation193%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most new home permits in the City of Prattville Building Permits (ArcGIS FeatureServer) file, June 2020 through May 2022, with 5 or more each. Share is the part of all 592 new home permits; 97% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Stone Martin Builders32855%
Lowder New Homes9115%
Goodwyn Building Company8014%
Goodwayn Building Company81%
Blake Custom Homes71%
Till Properties5under 1%

Download this table (CSV)

How these numbers are made

Source: City of Prattville Building Permits (ArcGIS FeatureServer), read 20 Oct 2026. We count permits issued June 2020 through May 2022; denied and withdrawn permits are left out. The city kept the permit status up to date only in 2018 and 2019, so most later permits still read Issued whether or not the work was finished, so no finished share is shown.

Building and trade permits the City of Prattville issued: residential and commercial building, electrical, plumbing, gas, mechanical, sign, fence and demolition permits. Millbrook, Autaugaville and unincorporated Autauga and Elmore counties are not in this file. Grading, stormwater, plat, temporary use and street-cut permits are left out.

  • The city's open permit layer is a static copy that stops with applications filed in June 2022 (it was last updated in 2024 with a few stragglers), so these pages end with May 2022, the last full month.
  • The file has no final inspection date and its status was not kept up after 2019, so we show no finished share and no time to final.
  • A declared value is filled on only about a quarter of permits, mostly new buildings, so we show no costs.
  • The file has no ZIP code, so there are no ZIP code pages for Prattville.
  • Electrical, plumbing, gas and mechanical permits for a new house are separate permits, so a new home also shows up under those trades. Gas permits are counted with plumbing.
  • Contractor names are the business named on the permit; owner-builders and personal names are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in the City of Prattville, AL", https://contractorrecords.com/prattville/new-home-permits, data through May 2022, from City of Prattville Planning & Development building-permit records.

Link to a table: By month · Season · Permit types · Most active contractors by permits filed.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits by permit type · Most active contractors by permits filed.

Common questions

  • How many new home permits does Prattville issue a year?About 296 a year in the City of Prattville: 592 permits issued June 2020 through May 2022, 282 of them in the last 12 months on file (to May 2022).
  • When do people in Prattville file the most new home permits?April (138 against an average month of 100); February is the quietest (67). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.