Building permits by California Premier Solar Construction
| Trade | Permits | Last 12 mo | Usual filed value | vs trade | Active | Evidence | List position |
|---|---|---|---|---|---|---|---|
| Solar | 51 | 4 | — | — | Oct 2023 – Dec 2025 | Strong | #11 of 495 |
| Battery Storage | 9 | 1 | — | — | Oct 2023 – Oct 2025 | Limited | #21 of 149 |
List position: where the firm lands on the San Diego County (unincorporated) comparison for that trade at default settings (or at a typical budget), among firms without a license problem. It's a match score from public records, not a quality rating.
Filed value is what was written on the permit, not a quote or final bill. Some jobs never need a permit.
License
- Status on the license recordNo matching license record in CSLB's public file. A missing match can be a difference in how the name is written, not proof the firm is unlicensed.
- Check it yourselfCSLB license check
Complaints, lawsuits and the permit record
Our record covers building permits, not complaints or court cases. In San Diego County, CA, California Premier Solar Construction pulled 60 permits 2023–2025; about 98% of those old enough to judge reached completion, and 0 of 57 permits a year or more old are still open. To check complaints and lawsuits, search CSLB (CSLB license check), BBB complaints for California Premier Solar Construction and San Diego County court records.
We never say whether a complaint or lawsuit exists: we do not hold those records.
Questions
- How many permits has California Premier Solar Construction pulled in San Diego County, CA?60 matching permits between Oct 2023 and Dec 2025, 5 of them in the last 12 months.
- What work does California Premier Solar Construction do?By permit count: Solar, Battery Storage.
- Is California Premier Solar Construction licensed?No matching license record in CSLB's public file; check CSLB license check. A missing match can be a difference in how the name is written, not proof the firm is unlicensed.
- Are there complaints or lawsuits against California Premier Solar Construction?Our record covers building permits, not complaints or court cases. In San Diego County, CA, California Premier Solar Construction pulled 60 permits 2023–2025; about 98% of those old enough to judge reached completion, and 0 of 57 permits a year or more old are still open. To check complaints and lawsuits, search CSLB (CSLB license check), BBB complaints for California Premier Solar Construction and San Diego County court records.
- Are there reviews of California Premier Solar Construction in San Diego County, CA?We do not collect reviews. What we hold is the public permit record: California Premier Solar Construction pulled 60 permits in San Diego County, CA from Oct 2023 to Dec 2025, about 98% finished. For reviews, see the firm’s BBB profile or Google listing, and check them against this record.
Where California Premier Solar Construction works
The ZIP codes where California Premier Solar Construction filed the most of its 60 permits on homes in San Diego County (unincorporated), counted at each property's ZIP code. A ZIP code opens every permit we track there and the most active firms in each trade.
Similar solar installers in San Diego County (unincorporated)
The 5 solar installers closest to California Premier Solar Construction's 51 solar permits. Similar volume, not similar quality.
- Sky Source Solar Electric · 61 permits
- Alive Industries Inc · 57 permits
- Mars Builder Solutions · 51 permits
- Palomar Electric · 46 permits
- Sungenia Solar Construction · 43 permits
Compare all San Diego County (unincorporated) solar installers →
Compare California Premier Solar Construction with other San Diego County (unincorporated) solar contractors
Every permit record in the county, side by side. Pick what you value. The list moves.
Source: public permit records (San Diego County (unincorporated)), matched by contractor name. How the records work. Something wrong? Firms can request a correction.