Demolition permits in Baltimore County, MD

Data through September 2026 · updated 20 Oct 2026

299 demolition permits were issued in Baltimore County, October 2024 through September 2026: about 150 a year and under 1% of all permits. 140 demolition permits in the last 12 months (Oct 2025–Sep 2026), 12% fewer than the 159 in the 12 months before. The busiest month is October. 21220 has the most, 25.

299permits issued
140last 12 months
Octbusiest month
$15,000usual declared value
Sep 2026records through

Demolition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 16Oct2024Nov 2024: 11Dec 2024: 17Jan 2025: 13Jan2025Feb 2025: 6Mar 2025: 15Apr 2025: 19May 2025: 12Jun 2025: 13Jul 2025: 16JulAug 2025: 10Sep 2025: 11Oct 2025: 23Nov 2025: 10Dec 2025: 12Jan 2026: 13Jan2026Feb 2026: 10Mar 2026: 9Apr 2026: 9May 2026: 9Jun 2026: 11Jul 2026: 19JulAug 2026: 9Sep 2026: 6
The same numbers as a table
MonthPermits
Oct 202416
Nov 202411
Dec 202417
Jan 202513
Feb 20256
Mar 202515
Apr 202519
May 202512
Jun 202513
Jul 202516
Aug 202510
Sep 202511
Oct 202523
Nov 202510
Dec 202512
Jan 202613
Feb 202610
Mar 20269
Apr 20269
May 20269
Jun 202611
Jul 202619
Aug 20269
Sep 20266

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (157), February the quietest (64). A busy month at the permit counter usually means a longer wait for a contractor.

January: 104 (100 = an average month)February: 64 (100 = an average month)March: 96 (100 = an average month)April: 112 (100 = an average month)May: 84 (100 = an average month)June: 96 (100 = an average month)July: 140 (100 = an average month)August: 76 (100 = an average month)September: 68 (100 = an average month)October: 157 (100 = an average month)157November: 84 (100 = an average month)December: 116 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January104
February64
March96
April112
May84
June96
July140
August76
September68
October157
November84
December116

Download this table (CSV)

What a demolition permit is declared at

The value written on the permit at application, from 281 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$15,000
Middle half$5,000–$30,000

Download this table (CSV)

ZIP codes with the most demolition permits

Counted at the property's ZIP code. Share is the part of the county's 299 demolition permits.

ZIP codePermitsShare
21220258%
21221238%
21204186%
21030155%
21228145%
21222134%
21219134%
21208124%
21227124%
21117114%

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Razing21572%
Commercial Razing8428%

Download this table (CSV)

Nearby permit data

Demolition permits for other places in Baltimore. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Baltimore County GIS, Active Development map service: Cityworks Permits, Electrical Permits, Plumbing Permits and Gas Permits layers, read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing and gas permits issued by Baltimore County Permits, Approvals and Inspections, which covers the whole county (it has no incorporated towns): Towson, Catonsville, Dundalk, Essex, Parkville, Pikesville, Owings Mills, Randallstown, Perry Hall, White Marsh and the rest. Baltimore City is a separate jurisdiction with its own permit office and is not in this file; the few trade permits whose ZIP code lies wholly inside Baltimore City are left out. Grading, storm-water and use-and-occupancy permits are not counted.

  • The county's files name no contractor, so there are no contractor lists, rankings or firm pages for Baltimore County.
  • The files carry no final inspection or completion date, so we show no time to final.
  • Electrical, plumbing and gas permits are marked complete when the county signs them off. Building permits in the county's current system are rarely marked closed, so building work (new homes, decks, fences, additions, remodels, commercial work) almost always shows as open and the finished share mostly reflects trade permits.
  • The estimated cost is filled on building permits only; trade permits carry no job value.
  • Gas permits for furnaces and boilers count as HVAC; gas permits for water heaters, ranges, dryers and gas lines count as plumbing. The county publishes no separate mechanical permits, so heat pumps and air conditioners appear under electrical.
  • Solar counts come from solar building permits; the matching electrical permit for the same job counts under electrical. Fire-sprinkler permits count as other.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in Baltimore County, MD", https://contractorrecords.com/baltimore-county/demolition-permits, data through September 2026, from Baltimore County Permits, Approvals and Inspections building-permit records.

Link to a table: By month · Season · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits: declared value · Demolition permits by ZIP code · Demolition permits by permit type.

Common questions

  • How many demolition permits does Baltimore County issue a year?About 150 a year in Baltimore County: 299 permits issued October 2024 through September 2026, 140 of them in the last 12 months.
  • When do people in Baltimore County file the most demolition permits?October (157 against an average month of 100); February is the quietest (64). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most demolition permits in Baltimore County?21220, with 25 of the 299 (8%); then 21221 (23).