Demolition permits in Boca Raton, FL

Data through September 2026 · updated 20 Oct 2026

225 demolition permits were issued in Boca Raton, May 2024 through September 2026: about 93 a year and 1% of all permits. 91 demolition permits in the last 12 months (Oct 2025–Sep 2026), 10% fewer than the 101 in the 12 months before. The busiest month is April. 33432 has the most, 126.

225permits issued
91last 12 months
Aprbusiest month
$20,000usual declared value
Sep 2026records through

Demolition permits by month

Permits issued each month, May 2024 through September 2026.

May 2024: 5May2024Jun 2024: 4Jul 2024: 7JulAug 2024: 11Sep 2024: 6Oct 2024: 6Nov 2024: 5Dec 2024: 9Jan 2025: 13Jan2025Feb 2025: 9Mar 2025: 10Apr 2025: 9May 2025: 6Jun 2025: 9Jul 2025: 13JulAug 2025: 6Sep 2025: 6Oct 2025: 7Nov 2025: 8Dec 2025: 7Jan 2026: 2Jan2026Feb 2026: 3Mar 2026: 6Apr 2026: 13May 2026: 8Jun 2026: 12Jul 2026: 7JulAug 2026: 11Sep 2026: 7
The same numbers as a table
MonthPermits
May 20245
Jun 20244
Jul 20247
Aug 202411
Sep 20246
Oct 20246
Nov 20245
Dec 20249
Jan 202513
Feb 20259
Mar 202510
Apr 20259
May 20256
Jun 20259
Jul 202513
Aug 20256
Sep 20256
Oct 20257
Nov 20258
Dec 20257
Jan 20262
Feb 20263
Mar 20266
Apr 202613
May 20268
Jun 202612
Jul 20267
Aug 202611
Sep 20267

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (142), February the quietest (77). A busy month at the permit counter usually means a longer wait for a contractor.

January: 97 (100 = an average month)February: 77 (100 = an average month)March: 103 (100 = an average month)April: 142 (100 = an average month)142May: 82 (100 = an average month)June: 107 (100 = an average month)July: 116 (100 = an average month)August: 120 (100 = an average month)September: 82 (100 = an average month)October: 84 (100 = an average month)November: 84 (100 = an average month)December: 103 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January97
February77
March103
April142
May82
June107
July116
August120
September82
October84
November84
December103

Download this table (CSV)

What a demolition permit is declared at

The value written on the permit at application, from 223 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$20,000
Middle half$15,000–$33,500

Download this table (CSV)

ZIP codes with the most demolition permits

Counted at the property's ZIP code. Share is the part of the city's 225 demolition permits.

ZIP codePermitsShare
3343212656%
334873013%
334312812%
334862812%
3349663%
3343331%
334341under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential (BPR)19185%
Commercial (BPC)178%
Multifamily (BPM)178%

Download this table (CSV)

Nearby permit data

Demolition permits for other places in South Florida. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Boca Raton, Published Applied & Issued Permits (monthly Issued Permits files), read 20 Oct 2026. We count permits issued May 2024 through September 2026; denied and withdrawn permits are left out. The file carries no usable permit status, so it can't say which permits were finished, so no finished share is shown.

Permits the City of Boca Raton Building Division issues inside the city limits only. Homes with a Boca Raton mailing address west of the city are in unincorporated Palm Beach County, get their permits from the county and are not in this file.

  • The city's published permit files name no contractor, so there are no contractor lists, rankings or firm pages for Boca Raton.
  • The files list each permit when it is issued and carry no status and no final inspection date, so these pages cannot show which permits finished, expired or are still open, or how long a permit takes.
  • The city posts one file per month. The April 2024 file is empty and there is none for December 2023, so the window starts in May 2024.
  • The files have no permit type. The kind of work is read from each permit's short description. Homes are the city's residential (BPR) and single-family quick (BPQ) permit classes; multifamily (BPM) and commercial (BPC) permits are not counted as homes.
  • The value is the job value declared on the permit, which sets the fee. It is not a final cost.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in Boca Raton, FL", https://contractorrecords.com/boca-raton/demolition-permits, data through September 2026, from the City of Boca Raton Development Services building-permit records.

Link to a table: By month · Season · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits: declared value · Demolition permits by ZIP code · Demolition permits by permit type.

Common questions

  • How many demolition permits does Boca Raton issue a year?About 93 a year in Boca Raton: 225 permits issued May 2024 through September 2026, 91 of them in the last 12 months.
  • When do people in Boca Raton file the most demolition permits?April (142 against an average month of 100); February is the quietest (77). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most demolition permits in Boca Raton?33432, with 126 of the 225 (56%); then 33487 (30).