Building permits in 92010, the City of Carlsbad

Data through December 2023 · updated 19 Oct 2026

1,162 building permits were issued in ZIP code 92010 by City of Carlsbad Building Division, April 2022 through December 2023: 14% of the 8,366 in the City of Carlsbad, the 4th busiest ZIP code. Solar permits lead with 517. Permits from a city that runs its own permit office are not counted.

1,162permits in 92010
677last 12 months on file
95%for homes
145days, usual issue to final
Dec 2023records through

Permits in 92010 by kind of work

Share here is the part of the 1,162 permits in 92010; citywide is the same for all of the City of Carlsbad.

Kind of workPermitsShare hereCitywide
Solar51744%39%
HVAC16915%17%
Plumbing11810%12%
Roofing978%8%
Electrical877%7%
Remodels & repairs545%5%
Pools & spas252%3%
Additions141%1%
Garages, sheds & shade structures121%1%
ADUs & casitas7under 1%under 1%
Fences & walls4under 1%under 1%
Other585%6%

Download this table (CSV)

Permits in 92010 by year

Permits issued in each calendar year of the window.

YearMonthsPermitsPer year
2022 (from April)9485647
202312677677

Download this table (CSV)

How permits in 92010 finish

Permits issued Apr 2022–Dec 2022, at least 12 months before the file ends.

Measure92010Citywide
Permits issued Apr 2022–Dec 20224853,601
Finished65.8%64.8%
Expired0.2%0.1%
Usual days, issue to final145150

Download this table (CSV)

How these numbers are made

Source: City of Carlsbad GIS BuildingPermits (BLDS format, ArcGIS FeatureServer), read 19 Oct 2026. We count permits issued April 2022 through December 2023; denied and withdrawn permits are left out.

Building permits the City of Carlsbad issued inside the city limits, residential and commercial, for applications filed in 2022 and 2023. Carlsbad issues one building permit per job, so re-roofs, solar, water heaters and HVAC change-outs are building permits here. Neighbouring Oceanside, Vista, San Marcos, Encinitas and unincorporated San Diego County are not in this file.

  • The city's open permit layer holds only permits applied for in 2022 and 2023 and was last updated in January 2024, so these pages end with December 2023. Newer Carlsbad permits are only in the city's own permit lookup.
  • Because the layer starts with 2022 applications, permits applied for in 2021 and issued later are missing; the window starts in April 2022, when the monthly counts settle. Long-review jobs such as new homes are undercounted in the first months.
  • The file names no contractor, so there are no contractor lists, rankings or firm pages for Carlsbad.
  • The file has no declared job value, so we show no costs.
  • The file has no work-type field. The kind of work is read from the permit description (re-roof, solar PV, water heater, furnace and so on); commercial permits are counted as other unless they are roofing, solar or pools.
  • A final date is the city's completed date on a permit closed as finaled. Status is as of January 2024, so permits issued late in 2023 had had little time to finish.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Building permits in 92010, the City of Carlsbad", https://contractorrecords.com/carlsbad/zip/92010, data through December 2023, from City of Carlsbad Building Division building-permit records.

Link to a table: By kind of work · By year · How permits finish.

Download the tables (CSV): Permits in 92010 by kind of work · Permits in 92010 by year · Permits in 92010: finished and days to final.

Common questions

  • How many building permits were issued in 92010?1,162 permits issued by the city in ZIP code 92010, April 2022 through December 2023: 517 solar, 169 HVAC, 118 plumbing. 677 were in the last 12 months on file (to December 2023).
  • What is built most in 92010?Solar: 517 of the 1,162 permits (44%), against 39% citywide.
  • How long does a permit take in 92010?The usual permit issued here Apr 2022–Dec 2022 took 145 days from issue to final (319 permits with a final date), against 150 days citywide.
  • Who did the work in 92010?The city's file doesn't name contractors, so we can't say. Ask a contractor for the permit numbers of past jobs and check them with the city.