Data through December 2023 · updated 19 Oct 2026
3,299 solar permits were issued in the City of Carlsbad, April 2022 through December 2023: about 1,885 a year and 39% of all permits. The busiest month is March. The usual one took 130 days from issue to the city's final. 92009 has the most, 1,377.
Permits issued each month, April 2022 through December 2023.
| Month | Permits |
|---|---|
| Apr 2022 | 168 |
| May 2022 | 155 |
| Jun 2022 | 154 |
| Jul 2022 | 163 |
| Aug 2022 | 141 |
| Sep 2022 | 150 |
| Oct 2022 | 170 |
| Nov 2022 | 145 |
| Dec 2022 | 121 |
| Jan 2023 | 118 |
| Feb 2023 | 134 |
| Mar 2023 | 283 |
| Apr 2023 | 380 |
| May 2023 | 260 |
| Jun 2023 | 164 |
| Jul 2023 | 164 |
| Aug 2023 | 116 |
| Sep 2023 | 88 |
| Oct 2023 | 78 |
| Nov 2023 | 91 |
| Dec 2023 | 56 |
By calendar month, 100 = an average month (the thin line). March is the busiest (180), December the quietest (56). A busy month at the permit counter usually means a longer wait for a contractor.
| Month | Index |
|---|---|
| January | 75 |
| February | 85 |
| March | 180 |
| April | 174 |
| May | 132 |
| June | 101 |
| July | 104 |
| August | 82 |
| September | 76 |
| October | 79 |
| November | 75 |
| December | 56 |
Permits issued Apr 2022–Dec 2022, at least 12 months before the file ends. Usual days is the middle permit among the 1,149 with a final date.
| Measure | Value |
|---|---|
| Permits issued Apr 2022–Dec 2022 | 1,367 |
| Finished | 84.1% |
| Expired | 0.0% |
| Usual days, issue to final | 130 |
| Middle half, days | 78–238 |
Counted at the property's ZIP code. Share is the part of the city's 3,299 solar permits.
How the city filed these permits. We group its types into kinds of work; this is the split.
| Permit type | Permits | Share |
|---|---|---|
| BLDG-Residential | 3,266 | 99% |
| BLDG-Commercial | 33 | 1% |
HVAC (1,434)Plumbing (981)Roofing (651)Electrical (560)Remodels & repairs (433)Pools & spas (214)
From our cross-city data studies: the same measure, read the same way, for every city we cover.
Solar permits for other places in San Diego. Each permit office keeps its own file, so the numbers are not added together.
Source: City of Carlsbad GIS BuildingPermits (BLDS format, ArcGIS FeatureServer), read 19 Oct 2026. We count permits issued April 2022 through December 2023; denied and withdrawn permits are left out.
Building permits the City of Carlsbad issued inside the city limits, residential and commercial, for applications filed in 2022 and 2023. Carlsbad issues one building permit per job, so re-roofs, solar, water heaters and HVAC change-outs are building permits here. Neighbouring Oceanside, Vista, San Marcos, Encinitas and unincorporated San Diego County are not in this file.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "Solar permits in the City of Carlsbad, CA", https://contractorrecords.com/carlsbad/solar-permits, data through December 2023, from City of Carlsbad Building Division building-permit records.Link to a table: By month · Season · Days to final · By ZIP code · Permit types.
Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: days to final · Solar permits by ZIP code · Solar permits by permit type.