Remodel and repair permits in Chattanooga, TN

Data through September 2026 · updated 18 Oct 2026

1,082 remodel and repair permits were issued in Chattanooga, October 2024 through September 2026: about 541 a year and 8% of all permits. 521 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 7% fewer than the 561 in the 12 months before. The busiest month is July. The usual one took 74 days from issue to the city's final. 37404 has the most, 146.

1,082permits issued
521last 12 months
Julbusiest month
74days, usual issue to final
27%finished
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 52Oct2024Nov 2024: 38Dec 2024: 40Jan 2025: 28Jan2025Feb 2025: 42Mar 2025: 47Apr 2025: 37May 2025: 41Jun 2025: 56Jul 2025: 82JulAug 2025: 46Sep 2025: 52Oct 2025: 37Nov 2025: 35Dec 2025: 36Jan 2026: 45Jan2026Feb 2026: 47Mar 2026: 43Apr 2026: 61May 2026: 32Jun 2026: 53Jul 2026: 42JulAug 2026: 46Sep 2026: 44
The same numbers as a table
MonthPermits
Oct 202452
Nov 202438
Dec 202440
Jan 202528
Feb 202542
Mar 202547
Apr 202537
May 202541
Jun 202556
Jul 202582
Aug 202546
Sep 202552
Oct 202537
Nov 202535
Dec 202536
Jan 202645
Feb 202647
Mar 202643
Apr 202661
May 202632
Jun 202653
Jul 202642
Aug 202646
Sep 202644

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (138), January the quietest (81). A busy month at the permit counter usually means a longer wait for a contractor.

January: 81 (100 = an average month)February: 99 (100 = an average month)March: 100 (100 = an average month)April: 109 (100 = an average month)May: 81 (100 = an average month)June: 121 (100 = an average month)July: 138 (100 = an average month)138August: 102 (100 = an average month)September: 106 (100 = an average month)October: 99 (100 = an average month)November: 81 (100 = an average month)December: 84 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January81
February99
March100
April109
May81
June121
July138
August102
September106
October99
November81
December84

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 153 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025561
Finished27.3%
Usual days, issue to final74
Middle half, days20–119

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 1,082 remodel and repair permits.

ZIP codePermitsShare
3740414613%
3740613112%
3740512211%
3741111511%
3742111010%
37343929%
37407767%
37415706%
37410515%
37416505%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Modification Permit43340%
Residential Repair Replace (BRR)43340%
Residential Building Permit: Exterior Alterations10610%
Residential Building Permit: Interior Alterations1009%
Simple Residential Building Permit: Interior Alterations6under 1%
Simple Residential Building Permit: Exterior Alterations4under 1%

Download this table (CSV)

How Chattanooga compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Chattanooga Hub (ChattaData), All Permits (nightly CSV extract, ArcGIS item 9937e99e93de467eae5f592061c2672c), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Chattanooga Land Development Office issues inside the city: building, repair and replace, modification and demolition permits for homes, and electrical, plumbing, mechanical and gas permits the city marks residential. Commercial, industrial and institutional permits, street cuts, land disturbing, low voltage permits and certificates of occupancy in the same file are not counted. Unincorporated Hamilton County, East Ridge, Red Bank, Signal Mountain and the other towns run their own permit offices and are not in this file.

  • The file names a contractor company on about seven in ten of the permits counted here, and on none before 2020. The contractor table counts permits filed per firm among those; it does not rate, rank or compare their work.
  • The file has a declared cost on only a few commercial permits, so we show no costs.
  • The file's completion date is empty. A final date here is the date the city last changed the permit's status, on permits whose status is Complete. A permit with any other status (Active or Stopped) counts as open; the file has no expired status.
  • In mid-2025 the city renamed several permit types (for example 'Residential Building Permit Old' and 'Residential Modification Permit' became 'Residential Building Permit' and 'Residential Repair Replace'); both names are counted the same way.
  • A new house gets separate building, electrical, plumbing, mechanical and gas permits, so one project can count several times, once under each kind of work.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Chattanooga, TN", https://contractorrecords.com/chattanooga/remodel-permits, data through September 2026, from the City of Chattanooga Land Development Office building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Chattanooga issue a year?About 541 a year in Chattanooga: 1,082 permits issued October 2024 through September 2026, 521 of them in the last 12 months.
  • How long does a remodel and repair permit take in Chattanooga?The usual one took 74 days from issue to the city's final inspection, and the middle half took 20 to 119 days (153 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Chattanooga file the most remodel and repair permits?July (138 against an average month of 100); January is the quietest (81). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Chattanooga?37404, with 146 of the 1,082 (13%); then 37406 (131).