Electrical permits in Eugene, OR

Data through September 2026 · updated 19 Oct 2026

5,835 electrical permits were issued in Eugene, October 2024 through September 2026: about 2,918 a year and 33% of all permits. 2,900 electrical permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 2,935 in the 12 months before. The busiest month is August.

5,835permits issued
2,900last 12 months
Augbusiest month
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 295Oct2024Nov 2024: 228Dec 2024: 229Jan 2025: 206Jan2025Feb 2025: 225Mar 2025: 275Apr 2025: 248May 2025: 232Jun 2025: 211Jul 2025: 258JulAug 2025: 272Sep 2025: 256Oct 2025: 254Nov 2025: 170Dec 2025: 198Jan 2026: 197Jan2026Feb 2026: 239Mar 2026: 270Apr 2026: 266May 2026: 253Jun 2026: 292Jul 2026: 236JulAug 2026: 288Sep 2026: 237
The same numbers as a table
MonthPermits
Oct 2024295
Nov 2024228
Dec 2024229
Jan 2025206
Feb 2025225
Mar 2025275
Apr 2025248
May 2025232
Jun 2025211
Jul 2025258
Aug 2025272
Sep 2025256
Oct 2025254
Nov 2025170
Dec 2025198
Jan 2026197
Feb 2026239
Mar 2026270
Apr 2026266
May 2026253
Jun 2026292
Jul 2026236
Aug 2026288
Sep 2026237

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). August is the busiest (115), November the quietest (82). A busy month at the permit counter usually means a longer wait for a contractor.

January: 83 (100 = an average month)February: 95 (100 = an average month)March: 112 (100 = an average month)April: 106 (100 = an average month)May: 100 (100 = an average month)June: 103 (100 = an average month)July: 102 (100 = an average month)August: 115 (100 = an average month)115September: 101 (100 = an average month)October: 113 (100 = an average month)November: 82 (100 = an average month)December: 88 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January83
February95
March112
April106
May100
June103
July102
August115
September101
October113
November82
December88

Download this table (CSV)

How these numbers are made

Source: City of Eugene Planning & Development, Building Activity Reports: Issued Building Permits (export), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's issued-permit report carries no permit status or completion date, so no finished share is shown.

Building, electrical, mechanical, plumbing, manufactured-home, fire-sprinkler and sign permits the City of Eugene issued inside the city. Public-works (right-of-way), erosion-control and site-development permits are left out. Springfield and unincorporated Lane County run their own permit offices and are not in this file.

  • Eugene issues the building, electrical, mechanical and plumbing work for one project as separate permits under one log number, each with its own issue date; each counts once here, under its own trade.
  • The city's report has no permit status or completion date, so we show no finished share and no time to final.
  • The report gives a street address but no ZIP code, so there are no ZIP pages.
  • Values are the declared value of work on building permits only; trade permits are left unpriced because most carry no value or the whole project's figure.
  • Homes are the permits the city files under its Residential application type (one- and two-family dwellings, townhouses, ADUs and manufactured homes); apartments of five or more units are commercial.
  • Building permits for alterations and repairs are sorted into roofing, solar, pools, fences or garages, sheds and decks where the city's project description names one.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Eugene, OR", https://contractorrecords.com/eugene/electrical-permits, data through September 2026, from City of Eugene Planning & Development building-permit records.

Link to a table: By month · Season.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index).

Common questions

  • How many electrical permits does Eugene issue a year?About 2,918 a year in Eugene: 5,835 permits issued October 2024 through September 2026, 2,900 of them in the last 12 months.
  • When do people in Eugene file the most electrical permits?August (115 against an average month of 100); November is the quietest (82). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.