Contractor Records
Home › Eugene › HVAC

HVAC permits in Eugene, OR

Data through September 2026 · updated 19 Oct 2026

5,394 HVAC permits were issued in Eugene, October 2024 through September 2026: about 2,697 a year and 30% of all permits. 2,630 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 5% fewer than the 2,764 in the 12 months before. The busiest month is July.

5,394permits issued
2,630last 12 months
Julbusiest month
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 246Oct2024Nov 2024: 237Dec 2024: 215Jan 2025: 207Jan2025Feb 2025: 211Mar 2025: 198Apr 2025: 201May 2025: 189Jun 2025: 247Jul 2025: 311JulAug 2025: 251Sep 2025: 251Oct 2025: 209Nov 2025: 181Dec 2025: 188Jan 2026: 180Jan2026Feb 2026: 186Mar 2026: 198Apr 2026: 206May 2026: 243Jun 2026: 293Jul 2026: 283JulAug 2026: 251Sep 2026: 212
The same numbers as a table
MonthPermits
Oct 2024246
Nov 2024237
Dec 2024215
Jan 2025207
Feb 2025211
Mar 2025198
Apr 2025201
May 2025189
Jun 2025247
Jul 2025311
Aug 2025251
Sep 2025251
Oct 2025209
Nov 2025181
Dec 2025188
Jan 2026180
Feb 2026186
Mar 2026198
Apr 2026206
May 2026243
Jun 2026293
Jul 2026283
Aug 2026251
Sep 2026212

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (132), January the quietest (86). A busy month at the permit counter usually means a longer wait for a contractor.

January: 86 (100 = an average month)February: 88 (100 = an average month)March: 88 (100 = an average month)April: 91 (100 = an average month)May: 96 (100 = an average month)June: 120 (100 = an average month)July: 132 (100 = an average month)132August: 112 (100 = an average month)September: 103 (100 = an average month)October: 101 (100 = an average month)November: 93 (100 = an average month)December: 90 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January86
February88
March88
April91
May96
June120
July132
August112
September103
October101
November93
December90

Download this table (CSV)

How these numbers are made

Source: City of Eugene Planning & Development, Building Activity Reports: Issued Building Permits (export), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The city's issued-permit report carries no permit status or completion date, so no finished share is shown.

Building, electrical, mechanical, plumbing, manufactured-home, fire-sprinkler and sign permits the City of Eugene issued inside the city. Public-works (right-of-way), erosion-control and site-development permits are left out. Springfield and unincorporated Lane County run their own permit offices and are not in this file.

  • Eugene issues the building, electrical, mechanical and plumbing work for one project as separate permits under one log number, each with its own issue date; each counts once here, under its own trade.
  • The city's report has no permit status or completion date, so we show no finished share and no time to final.
  • The report gives a street address but no ZIP code, so there are no ZIP pages.
  • Values are the declared value of work on building permits only; trade permits are left unpriced because most carry no value or the whole project's figure.
  • Homes are the permits the city files under its Residential application type (one- and two-family dwellings, townhouses, ADUs and manufactured homes); apartments of five or more units are commercial.
  • Building permits for alterations and repairs are sorted into roofing, solar, pools, fences or garages, sheds and decks where the city's project description names one.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in Eugene, OR", https://contractorrecords.com/eugene/hvac-permits, data through September 2026, from City of Eugene Planning & Development building-permit records.

Link to a table: By month · Season.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index).

Common questions

  • How many HVAC permits does Eugene issue a year?About 2,697 a year in Eugene: 5,394 permits issued October 2024 through September 2026, 2,630 of them in the last 12 months.
  • When do people in Eugene file the most HVAC permits?July (132 against an average month of 100); January is the quietest (86). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.