Contractor Records
Home › Guides › Do I need a remodel permit in Cary, NC? Kitchens, baths and walls: what the Town exempts, plan review and finish rates

Do I need a remodel permit in Cary, NC? Kitchens, baths and walls: what the Town exempts, plan review and finish rates

Yes, once a Cary remodel goes past cosmetic work: the Town exempts new cabinets, flooring and wall coverings but requires a permit to move a wall, add an island or relocate a plumbing fixture. Firms filed 1,857 remodel and repair permits on Cary homes from October 2023 to September 2026; the usual one carried a filed value of $40,000 and passed final 84 days after issue.

By Contractor Records · data through October 16, 2026

Where the Town draws the line

The Town's Residential Permits FAQ (read 23 October 2026) starts from "A permit is required anytime work is done on a building or structure, or the systems serving the structure", and says "Remodeling, repairs, alterations, decks, porches, and many other projects require a residential building permit". Its two lists, applied to a kitchen or bath:

Remodel work Permit in Cary?
New cabinets and casework in the same layout No: "cabinets and casework"
New flooring, tile, wall coverings No: "floor and wall coverings"
Cosmetic, non-structural replacement No: "Replacement or repair of non-structural cosmetic building elements"
Windows and doors in existing openings No
Swapping a light fixture, no work in the wall or ceiling cavity No
Swapping a plumbing fixture without changing "the design or capacity" No
Installing an island or peninsula cabinet Yes
"Interior and/or exterior wall demolition or addition" Yes
New sink, lavatory, toilet, or a shower pan Yes
Bathroom exhaust fan, range hood, under-cabinet lighting (hard-wired) Yes
New lighting and receptacle outlets Yes

The island line is the one that surprises people: it is cabinetry, but the Town lists it as permit work while ordinary cabinets are exempt. Questions go to 311, or (919) 469-4046 from outside Cary.

Plan review

Remodels go through plan review. The FAQ says "The plan review process for one- and two-family homes normally takes one to two weeks" and "The regular review cycle is approximately seven business days"; "your plot plan is checked for compliance with zoning requirements", and contractors' licenses are verified. "Be sure to include all of your contractors' names, addresses and state license numbers." If all is approved, the Town contacts you to pick up the permit.

The Town says "Building Permit Fees are figured based on square footage" and points to its Fees Estimation Guide. We could not open that guide to confirm the current alteration rate, so we give no figure; ask 311 before you budget.

Who can pull it

A licensed general contractor for a job of $40,000 or more: North Carolina's general contractor law starts at that value (G.S. 87-1, Chapter 87); check the license and its limitation on the NCLBGC search. The electrician and plumber inside a smaller job still need their own state licenses (Cary contractor license lookup).

You, on your own home. "Yes, an owner of the property can do their own building, electrical, plumbing, and mechanical work"; "The owner does not need to be licensed", but "the property must be the owner's primary residence for at least 12 months after completion of the work". A flip does not qualify.

Inspections and expiry

  • Which inspections: "determined by the plan review staff and listed on the permit documents at issuance", so read the permit card.
  • Booking: in Building Permits Online, at Town Hall (316 N. Academy St.), or by phone on 311.
  • Expiry: "A permit is active for six months without any activity, or one year after the last inspection"; starting over means a new permit "with the fees doubled" (Residential Inspections Information).
  • Done means certified: after all required inspections pass, a Certificate of Compliance goes to the contractor and the owner.

What 1,857 Cary remodel permits show

Measure Cary remodel and repair
Permits, October 2023 to September 2026 1,857
Firms 626
Firms with a permit in the 12 months to September 2026 325
Usual filed value $40,000
Middle half of firms' usual job value $20,000 to $65,439
Passed final (permits a year or more old) 88.9%
Usual days from issue to final 84
10th / 90th-percentile firm (10+ permits) 79.5% / 96.9%
Firms with one permit 376 (60.1%)
Busiest / quietest month (index, 100 = average) April (126) / December (61)

The Cary remodel market is fragmented: 60.1% of the 626 firms filed a single permit in three years, and only 20 filed ten or more. The busiest in the 12 months to September 2026 was EZ Pro Construction Group, LLC, with 79 permits. The usual filed value of $40,000 sits right at the $40,000 general contractor line, so ask any bidder near it for their NCLBGC license number. Plan about three months from issue to final. Prices by home value: Cary remodel cost.

See every Cary remodeler by permits finaled →

Related

Other places' rules: do I need a permit for a home remodel, a kitchen remodel and a bathroom remodel. The checklist: hiring a remodeling contractor; national prices: home remodel cost; local prices: Cary home improvement costs. Records: Cary building permit search; additions have their own compare list; counts by year: Cary permit statistics.

What this does not tell you

Our remodel category combines remodels and repairs, so its usual value is not a kitchen price. A recent permit may simply not be finaled yet. License status is not on our Cary pages.

How we know this

The permit and exemption lists, plan review times, owner rule and fee basis are quoted from the Town of Cary's Residential Permits FAQ, read 23 October 2026, and inspection and expiry wording from its Residential Inspections Information page. The $40,000 threshold is from G.S. 87-1. Our counts come from the Town's Building Permit Applications open data, remodel and repair permits on homes, October 2023 to September 2026; "passed final" counts permits a year or more old.

Numbers come from Town of Cary building permit applications (issued permits only), data through October 16, 2026. Nobody paid to be on this page and nobody can.

Questions

  • Do I need a permit to remodel a kitchen in Cary, NC?

    It depends on the scope. The Town of Cary exempts replacing cabinets and casework and floor and wall coverings, but requires a permit for wall demolition or addition, installing an island or peninsula cabinet, new plumbing fixtures, and lighting and receptacle outlets.

  • Do I need a permit to remodel a bathroom in Cary?

    Yes if you add or move fixtures, replace a shower pan, add an exhaust fan or move walls; the Town lists sinks, toilets, the shower pan and the bathroom exhaust fan as permit work. Replacing a fixture without changing the design or capacity, and new floor and wall coverings, are exempt.

  • How long does a remodel permit take in Cary?

    The Town says plan review for one- and two-family homes normally takes one to two weeks, with a regular review cycle of about seven business days. Once issued, the usual Cary remodel permit in our file passed final 84 days later.

  • Can a homeowner pull a remodel permit in Cary?

    Yes. The Town says an owner can do their own building, electrical, plumbing and mechanical work without a license, provided the property is the owner's primary residence for at least 12 months after the work is complete.

  • How much does a remodel cost in Cary?

    The usual Cary remodel permit carried a filed value of $40,000, and the middle half of firms' usual jobs ran $20,000 to $65,439. A remodel of $40,000 or more needs a licensed general contractor under state law.

Build your own list

Every firm with that kind of permit on record. Pick what you value. The list moves.