A home EV charger installation usually costs between $925 and $2,296, going by what electricians file with the city. The usual filed value of an EV charger permit was $1,104 across 2,922 permits in Cary, North Carolina, $925 in Elk Grove, California, and $2,296 in Marin County, the highest of the eight cities that record a value. The federal tax credit that used to take up to $1,000 off ended for chargers placed in service after 30 June 2026 (IRS).

By Contractor Records · data through October 17, 2026

EV charger cost by city

City EV charger permits Firms Usual filed value Middle half of firms' usual job Usual days to final Reached final
Elk Grove, CA 1,353 119 $925 $850–$1,312 18 87.8%
Cary, NC 2,922 244 $1,104 $1,000–$1,400 17 95.0%
Wilmington, NC 165 60 $1,200 $1,100–$1,500 10 95.3%
Sacramento County, CA 839 111 $1,400 $984–$1,624 25 94.2%
Naperville, IL 266 70 $1,600 $1,322–$1,964 59 70.4%
Burlington, VT 268 56 $1,600 $1,000–$2,250 49 74.9%
Seattle, WA 2,602 311 $1,701 $1,192–$2,500 20 94.1%
Marin County, CA 213 68 $2,296 $1,600–$3,000 64 67.6%
Bellevue, WA 1,257 295 no value filed — 14 89.7%
San Diego County, CA 490 105 no value filed — 95 60.3%
Anaheim, CA 549 158 no value filed — 12 96.5%
Bellingham, WA 248 56 no value filed — 18 86.1%
Bend, OR 188 47 no value filed — 24 84.5%

The spread inside a city is narrow. In Cary, the middle half of 112 firms usually file between $1,000 and $1,400; in Elk Grove, $850 to $1,312. A charger install is a standard job, so a quote two or three times the city's usual figure is worth a question.

Level 1 or Level 2: what you are paying for

Level 1 Level 2
Plug 120-volt standard outlet, using the cordset most EVs come with 240-volt circuit (208 V in commercial buildings)
Range added About 5 miles per hour of charging; about 40 miles in 8 hours for a mid-size EV About 25 miles per hour of charging
Circuit An existing outlet A residential unit at up to 30 amps (7.2 kW) needs a dedicated 40-amp circuit under NEC Article 625
Installer and permit None if the outlet exists A licensed electrician and an electrical permit; this is the job priced in the table above

All figures from the U.S. Department of Energy's Alternative Fuels Data Center (read 21 October 2026). If you drive 30 miles a day, eight hours on Level 1 overnight covers it by those numbers, and the installation cost is zero. Charging from an existing outlet needs no permit, so it is not in the table above.

What moves the price

The filed value is the electrician's own figure for the permitted work. What pushes a job above the usual:

  • A panel upgrade. If the panel has no room for the charger's breaker, the job becomes a service change, which is a bigger permit and a bigger number. Ask whether the quote includes a load calculation.
  • Distance. A garage on the far side of the house from the panel means a longer run of heavier wire and, outdoors, conduit or trenching.
  • The charger itself. Some electricians include the wall unit in the filed value and some file labor only. Ask which.
  • Permit and inspection fees. Cary's guide puts the minimum at $100 per trade, and a typical home install with a mechanical permit for ventilation at $200 (Town of Cary, rev. September 2025). Your city's fee schedule may differ.

The federal credit has ended

The IRS's page on the Alternative Fuel Vehicle Refueling Property Credit (section 30C) says that for individuals it was "30% of the cost of the property up to a maximum credit of $1,000 per item", only for a charger at your main home in a low-income or non-urban census tract, and only for property placed in service "from January 1, 2023, to June 30, 2026" (IRS, read 21 October 2026). A charger installed now does not qualify. Utility and state rebates are separate and change often; check your utility's site before you sign, because some require a pre-approval.

Who may install it

A home charger on a 240-volt circuit is electrical work, so the person to check is the electrical contractor. Cary's guide says the installation must "comply with Article 625 of the National Electrical Code" and puts responsibility on "both the owner and contractor" (Town of Cary).

State License to ask for Look it up
California CSLB C-10 Electrical CSLB Check a License
Illinois No state license; Naperville registers electrical contractors Naperville registration
North Carolina NCBEEC electrical contractor license NCBEEC search
Oregon CCB license plus a BCD electrical license BCD search
Vermont Electrician license, Division of Fire Safety Licensed electricians
Washington L&I electrical contractor license L&I Verify

The check takes two minutes: type the license number from the quote into the lookup, confirm it is active and in an electrical class, then open the firm on our compare page. In Cary, 49.4% of EV charger permits went to the five busiest firms, so most quotes there come from firms with a long record you can read. In Elk Grove, 6 of the 25 firms with 10 or more charger permits finished under 70% of them; that is the number to ask a busy installer about. For more on choosing one, see hiring an electrician.

See every Cary EV charger installer by finished share →

What these numbers cannot tell you

Five of the thirteen cities file no job value on charger permits, so they appear above for counts and timing only. We do not have a clean year-by-year price series for chargers, so we cannot say whether 2026 installs cost more than 2025's; the usual value here covers the whole three-year window. Filed values are the contractor's statement to the city, not the invoice, and a job with a panel upgrade may be filed under a separate service permit we do not count here. A charger plugged into an existing outlet needs no permit and appears nowhere in this file.

How we know this

EV charger permits are those each city files under an EV charger work type or description, over its three-year window (Burlington April 2023 to March 2026; the others October 2023 to September 2026). The usual filed value is the median of permits that carry a value; the middle-half range uses firms with 3 or more charger permits; "reached final" is the share of permits a year or more old that the city closed with a final, and days to final is the median from issue to final. The tax credit and Cary fee facts are quoted from the IRS and Town of Cary pages under Sources, read 21 October 2026.

Numbers come from Town of Cary building permit applications (issued permits only); City of Elk Grove TRAKiT building permits on single-family, duplex, mobile-home and ADU homes; Sacramento County building permits on single-family, duplex and townhouse homes in the unincorporated county (the County's Accela permit layer); City of Seattle (SDCI) building, trade and electrical permits on single-family and duplex homes (the city's open-data exports); City of Naperville building permits (the current permit system plus the city's older records); City of Burlington permits on 1–4 family homes, condos and mobile homes (the city's OpenGov permit feed); Marin County Community Development Agency building permits on homes in unincorporated Marin (the County's open-data permit and inspection files); New Hanover County Building Safety permits on homes inside the City of Wilmington (the County issues the City's building permits), data through October 17, 2026. Nobody paid to be on this page and nobody can.

Questions

  • How much does it cost to install a home EV charger?

    By the permit record, usually between $925 and $2,296. The usual filed value of an EV charger permit was $925 in Elk Grove, $1,104 in Cary, $1,400 in Sacramento County, $1,701 in Seattle and $2,296 in Marin County. A new panel or a long wire run costs more.

  • Is there still a federal tax credit for a home charger?

    Not for chargers installed now. The IRS says the 30C credit (30% of the cost, up to $1,000 per item for individuals, only in eligible low-income or non-urban census tracts) covers property placed in service from 1 January 2023 to 30 June 2026.

  • Do I need a permit for an EV charger?

    For a hard-wired charger or a new 240-volt circuit, usually yes; all thirteen cities here issue them. Cary, North Carolina, says the permit is required under state law, with a minimum fee of $100 per trade, and a typical home install with a mechanical permit for ventilation comes to $200.

  • How long does an EV charger permit take?

    Days to a few weeks. The usual EV charger permit reached its final in 12 days in Anaheim, 14 in Bellevue, 17 in Cary and 20 in Seattle.

  • Can I charge from a regular outlet instead?

    Yes, at Level 1: the cord that comes with most EVs plugs into a standard 120-volt outlet and adds about 5 miles of range per hour, or about 40 miles in 8 hours for a mid-size EV (U.S. DOE). No installer or permit is needed if the outlet is already there. A Level 2 charger adds about 25 miles an hour and needs a 240-volt circuit.

  • Who should install an EV charger?

    A licensed electrical contractor, who pulls the electrical permit in its own name: CSLB C-10 in California, NCBEEC in North Carolina, an L&I electrical contractor license in Washington. Check the number before you pay a deposit.