Nashville electrical in numbers
| What we measured | Nashville |
|---|---|
| Electrical permits, three years | 50,235 |
| Firms | 1,163 |
| Firms with a permit in the last 12 months | 764 |
| Firms matched to an active Tennessee license | 55.1% |
| Usual filed value | $5,000 |
| Middle half of firms' usual value | $3,000 to $20,000 |
| Reached a final (permits a year or more old) | 89.5% |
| 10th / 90th-percentile firm (10+ permits) | 71.4% / 100.0% |
| Firms under 70% finished | 40 of 445 |
Filing is fairly even through the year: the index peaks in February (114) and is lowest in December (85), where 100 is an average month. Prices by job size are on the Nashville electrical cost page.
Which license a Nashville electrician needs
Two layers. Metro Codes' Mechanical, Plumbing, Electrical Examiners & Appeals Board examines and issues the master electrician's certificate, plus equipment installer and low-voltage wiring installer licenses (Metro Codes, read 22 October 2026). That certificate is what the trade permit runs on, so it is the first thing to ask for.
The State comes in by dollar amount. Tennessee's Board for Licensing Contractors requires electrical subcontractors to hold their own license when their part is "$25,000 or more" (classification CE), and Davidson County is one of nine counties where residential jobs from $3,000 to $24,999 need a home improvement license (Board for Licensing Contractors, read 22 October 2026). A panel upgrade usually sits in that middle band; the middle half of Nashville electrical firms file between $3,000 and $20,000.
The five-minute check: search the license number or business name on verify.tn.gov and read the status and monetary limit, then call Metro Codes on 615-862-6500 to confirm the master's certificate named on your quote is current; we found no public online search for Metro's certificates. More in the Nashville contractor license lookup.
The permit rule for electrical work in Nashville
Electrical work goes through Metro Codes as a trade permit. Metro's trades page says "Only licensed contractors with an e-permit account can apply for a trade permit using our online system"; everyone else applies in person, and the examiners board also tests homeowners who want a homeowner permit (Metro Codes, read 22 October 2026). Once the job is booked, open Metro's Parcel Viewer, search your address and choose Permit History: the electrical permit should be there with your electrician's name on it. Panel rules in other cities are in do I need a permit for an electrical panel upgrade.
Red flags in the Nashville record
- A finished share under 71.4%. That is the 10th-percentile line among the 445 Nashville electricians with 10 or more permits; 40 of them finish under 70%. Ask about open permits by address.
- No master's name on the quote. 42.0% of electrical firms had no state license match by name, many because their jobs are under $25,000. Without a certificate holder's name there is nothing to check.
- A $25,000+ job with no state license. A service upgrade with a generator or a whole-house rewire can cross the line; the monetary limit on the state record must cover your contract.
- A firm that stopped filing. 93 electrical firms with 5 or more permits filed none in the last 12 months.
- "You pull the permit." A homeowner permit names you, not the firm, and the job then appears in no electrician's record.
The busiest Nashville electricians in the last 12 months
Ranked by Nashville electrical permits in the last 12 months of the window. Volume, not quality; some busy firms are plumbing-and-HVAC companies with an electrical arm, and some do mostly small service calls.
| Firm | Permits, last 12 months | Permits, three years |
|---|---|---|
| Strada Services LLC | 659 | 2,295 |
| Romanoff Electric Residential LLC | 657 | 2,291 |
| Morgan Electric Co Inc | 632 | 1,674 |
| Hiller Plumbing Heating Cooling & Electrical dba Hiller LL | 401 | 821 |
| Music City Handymen LLC | 313 | 1,155 |
The five busiest firms hold only 16.5% of the city's electrical permits, and 482 firms filed 10 or more, so you have plenty of records to compare. The compare list shows each firm's finished share and license match next to its volume.
See every Nashville electrician by finished share and license match →
What the Nashville record does not tell you
A final means Metro's inspector passed the work against code; it says nothing about the price, the cleanup or the warranty. Our file has no days-to-final figure for Nashville, so ask the electrician when the final inspection will be booked. We match firms to the state license file by business name; we do not hold Metro's master certificates or the home improvement license file, so unmatched is not unlicensed. Insurance never appears on a permit. The national checklist is in hiring an electrician, and statewide rules in how to check a contractor's license in Tennessee.
How we know this
Permits are Metro Nashville Codes electrical trade permits on homes in Davidson County, 2023-09 to 2026-09. "Reached a final" uses permits a year or more old. Percentile and under-70% figures use electrical firms with 10 or more permits; the filed-value range uses firms with 3 or more. The busiest-firm table ranks by permits in the last 12 months. License status is our business-name match to the Tennessee Board for Licensing Contractors' file. Rules are quoted from the Tennessee Department of Commerce & Insurance and Metro Codes pages, read 22 October 2026.
Numbers come from Metro Nashville (Davidson County) building and trade permits, data through September 21, 2026. Nobody paid to be on this page and nobody can.
Questions
- How do I choose an electrician in Nashville?
Ask whose Metro master electrician's certificate the permit will be pulled under, check the Tennessee license on verify.tn.gov when the job is $25,000 or more, and read the firm's Nashville record: 89.5% of Nashville electrical permits a year or more old reached a final, and the 10th-percentile firm with 10 or more permits reached 71.4%.
- Does an electrician need a license in Nashville?
Yes. Metro Codes' examiners board issues the master electrician's certificate that electrical work is permitted under. Tennessee adds a state CE electrical license once the electrical part of a job is $25,000 or more, and in Davidson County a home improvement license on residential jobs from $3,000 to $24,999.
- Do I need a permit for electrical work in Nashville?
Electrical work is permitted through Metro Codes as a trade permit. Metro says only licensed contractors with an ePermits account can apply online; anyone else applies in person. The electrician should pull it, and you can see it under Permit History on Metro's Parcel Viewer.
- What does a Nashville electrician usually charge?
The usual Nashville electrical permit was filed at $5,000, and the middle half of firms usually file between $3,000 and $20,000. That is the value written on the permit, not a quote.
- Who are the busiest electricians in Nashville?
By permits in the last 12 months, Strada Services LLC led with 659, followed by Romanoff Electric Residential LLC with 657. The five busiest hold 16.5% of Nashville electrical permits, so the market is wide.
Build your own list
Every firm with that kind of permit on record. Pick what you value. The list moves.
Related guides
- Contractor red flags, including the three you can see in the public record
- Hiring an electrician: 5 red flags and 10 questions, checked against electrical permits in 45 cities
- Hiring an electrician in Austin: the TDLR license, the permit, and what 24,000 electrical permits show
- Hiring an electrician in Bellevue, WA: the L&I electrical license, the permit, and what 8,000 electrical permits show
- Hiring an electrician in Raleigh: the NC electrical license, the permit, and what 16,800 electrical permits show
For one city
- Tennessee license search (verify.tn.gov) — Department of Commerce & Insurance (2026-10-22)
- Subcontractors / Who is Required to be Licensed — Board for Licensing Contractors (2026-10-22)
- Home Improvement Contractor — Tennessee Board for Licensing Contractors (2026-10-22)
- Mechanical, Plumbing, Electrical Examiners & Appeals Board — Metro Codes (2026-10-22)
- Obtaining a Trades Permit — Metro Codes (2026-10-22)
- Property Permit History — Metro Codes (2026-10-22)