The program is run by the Florida Department of Financial Services, not the City or OUC. Everything below is from its FAQ, read 23 October 2026, unless marked otherwise.
Who qualifies
| Step | Requirement |
|---|---|
| Free inspection | Site-built, owner-occupied single-family home on its own parcel, with a homestead exemption (ch. 196, F.S.) |
| Not eligible | Condos, co-ops, mobile or manufactured homes, multi-family, retirement homes, second homes, rentals |
| Grant | Initial inspection done; insured value $700,000 or less; built before 1 January 2008 per the county property appraiser |
| Also for the grant | Contractor's name and state license number; agree to a final inspection and to share any insurer discount |
| Application windows | Open in phases, low-income applicants aged 60+ first; dates "TBD" on the FAQ |
Orlando's single-family value figure in our data is $377,000, under the $700,000 cap; the cap is on insured value, so check your declarations page. Look up the year built on the Orange County Property Appraiser record before you apply, because that is the date the program uses.
What the money pays for
Only items the initial inspection recommends and the final inspection sees count:
| Improvement | What it is |
|---|---|
| Secondary water resistance | A self-adhering underlayment under the roof covering |
| Roof deck attachment | Re-nailing the roof deck |
| Roof-to-wall attachment | Clips or straps tying the roof to the walls |
| Opening protection | Impact-rated windows, doors, garage doors and skylights |
The grant amounts:
| Grant | Pays | Example from the FAQ |
|---|---|---|
| Matching | $2 per $1 the homeowner pays, up to $10,000 | $15,000 job: $10,000 reimbursed, $5,000 from you |
| Low-income | Up to $10,000, no match, no paid-in-full invoice |
Both are "subject to legislative appropriation". The matching grant is a reimbursement by mailed check after the final inspection and a paid-in-full invoice, so you or your financing carry the full cost first.
Two of those items overlap with what a Florida re-roof must include anyway. Florida Statutes 553.844(3)(a) (2026) says a roof replacement on a site-built single-family home must include the secondary water barrier and roof-decking attachment techniques. So the grant does not buy extras on a re-roof so much as share the cost of work the code already requires; roof-to-wall clips and opening protection are where it adds something new. The statute's 25% repair rule is covered in roof repair vs replacement.
Hiring the contractor
- You choose. The program "no longer maintains an authorized contractor list" and stays out of disputes between you and the contractor.
- License. General, building, residential, specialty or roofing contractor, certified or registered with DBPR. Check the number on Verify a Licensee in two minutes; 97.7% of Orlando roofing firms in our file matched an active license.
- Inspector. Program-contracted only. You cannot use your own inspector for either inspection.
- Order of events. Inspection, grant approval, then contract and permit. Starting construction before official approval disqualifies you.
- Deadline. 18 months from approval to finish and request the final inspection, or the application is treated as abandoned. You get one final-inspection request.
- Permit. Before you request the final, every contractor permit must be approved and closed.
Write the program items into the contract line by line (underlayment type, deck nailing, clips), so the final inspector can find each one and the invoice matches the initial report.
What Orlando's roofing permits show
| Measure | Orlando roofing |
|---|---|
| Permits on homes, October 2023 to September 2026 | 9,818 |
| Firms | 1,058 |
| Usual filed value | $11,015 |
| Middle half of firms' usual value (3+ permits) | $10,000 to $15,760 |
| Usual days from issue to final | 27 |
| Busiest / quietest month | March (index 125) / September (85) |
| Firms with one permit only | 373 (35.3%) |
The usual permit is filed at $11,015, but the FAQ lists only the four items above as eligible, so the grant applies to those lines, not automatically to the whole invoice; ask the roofer to price them separately. The permit closes fast here, 27 days at the middle, which matters because the final inspection cannot be requested until it does. Filing peaks in March and dips in September. The busiest firm over the last 12 months was Skymark Roofing LLC with 387 permits.
Compare Orlando roofers by permit record →
Permit steps and inspection codes: Orlando roofing permit. Checklist: hiring a roofer in Orlando. Prices by firm: Orlando roofing cost. Counts by year: Orlando permit statistics. Impact windows from the same grant need a licensed contractor too; see check a contractor license in Florida.
What this does not tell you
Our data is City of Orlando permits; homes with an Orlando mailing address in unincorporated Orange County are not in it. Filed values are the contractor's estimate on the permit, and we cannot tell which permits were grant-funded or which included clips or impact windows. Program funding and application windows change with each legislative session, so check MySafeFLHome.com before you sign anything.
How we know this
Eligibility, grant amounts, contractor rules and the order of steps are from the My Safe Florida Home FAQ (Florida Department of Financial Services), read 23 October 2026; the re-roof requirement from Florida Statutes 553.844 (2026). Permit counts are City of Orlando building permits classified as roofing on homes, October 2023 to September 2026; days to final is the median from issue to final.
Numbers come from City of Orlando building permits for one- and two-family homes, data through October 17, 2026. Nobody paid to be on this page and nobody can.
Questions
- Who qualifies for My Safe Florida Home in Orlando?
For the free inspection: a site-built, owner-occupied single-family home on its own parcel, with a Florida homestead exemption. For the grant, the home also needs an insured value of $700,000 or less and must have been built before 1 January 2008, per the Orange County property appraiser record (My Safe Florida Home FAQ, read 23 October 2026).
- How much is the My Safe Florida Home grant?
The matching grant pays $2 for every $1 you put in, up to $10,000 from the state; the program's own example is a $15,000 job with $10,000 reimbursed and a $5,000 homeowner share. A low-income grant pays up to $10,000 with no match. Both depend on the Legislature's appropriation.
- Can I pick my own roofer for My Safe Florida Home?
Yes. The program no longer keeps an approved contractor list. Your contractor must be licensed with Florida DBPR as a general, building, residential, specialty or roofing contractor, and you give the program the name and license number. The inspector, though, must be the program's; you cannot use your own.
- Can I start the roof before the grant is approved?
No. The program says starting construction before official grant approval disqualifies you from reimbursement. After approval you have 18 months to finish and request the final inspection.
- Do I need a permit for a My Safe Florida Home roof?
Yes. Orlando needs a building permit for a re-roof, and the program says all contractor permits must be approved and closed before you request the final inspection. The usual Orlando roofing permit in our data reached its final 27 days after issue.
Build your own list
Every firm with that kind of permit on record. Pick what you value. The list moves.
Related guides
- Marin County wildfire rules for remodels: Class A roofs, the 50% siding and deck triggers, tempered windows, and the vegetation plan
- The best month to start electrical, HVAC and solar work (by city)
- How to check a contractor's license in Florida
- Do I need a permit to replace my roof? It splits: the rule in 16 cities, and how many get filed
For one city
- Frequently Asked Questions — My Safe Florida Home (Florida Department of Financial Services) (accessed 2026-10-23)
- Florida Statutes § 553.844 Windstorm loss mitigation; requirements for roofs and opening protection (2026) (accessed 2026-10-23)
- Verify a Licensee — Florida DBPR (accessed 2026-10-23)