Contractor Records
Home › Guides › Orlando building permit search: how to look up permits on an address

Orlando building permit search: how to look up permits on an address

To look up an existing permit in Orlando, use the City's Permit Lookup tool, linked from the Get a Permit page. The City says it shows "your permit status, plan review completion dates, related permits, etc." and any fees due (read 23 October 2026). The same permits are published as the Permit Applications dataset on the City's open data portal, which is where our 42,936 Orlando permits from October 2023 to September 2026 come from.

By Contractor Records · data through October 17, 2026

Where Orlando permits live

Only permits the City of Orlando issued are in either place. An address outside the city limits, in unincorporated Orange County or a neighbouring city, will not show up, and is not in our Orlando file either.

The Permit Lookup site blocks automated reading, so we could not check its search fields ourselves; what is quoted here is from the City's Get a Permit page. The City's pages do not describe a search by contractor name. To see one contractor's Orlando permits together, open the firm on our compare pages, which group every permit by the firm that pulled it.

How to look up the permits on an Orlando address

  1. Open Get a Permit and follow the "Look up Permit" or "Check Permit Status" link to the Permit Lookup tool.
  2. Search for the property. If the address finds nothing, use the permit number from the contractor's paperwork or the permit card on site.
  3. Open each permit on the address and check the status. The City's own instruction is to "ensure that the status is final".
  4. Open any related permits the tool lists for the job; trade work can be filed separately from the building permit.
  5. If a permit is open, look at the dates. The City says a permit that is open for six months without an inspection will expire.

How to read Orlando permit statuses

The City puts it plainly: "Once you complete and pass your inspections the permit will be final." In the City's open data file, the labels we read are these:

Status in the record What it means Finished in our data?
Finaled Final inspection passed Yes
Completed Work signed off Yes
Open Issued, not yet final Not yet
Closed Closed without a final inspection No

We use the City's final date to measure how long each firm's permits take to reach final. We do not show a completion rate for Orlando: almost every permit here is eventually closed, so it did not separate contractors in our tests (see the Orlando about page and methodology).

When the permit you want is not online

For a permit file that is not in the lookup, use the City Clerk's Request a Public Record page. It lists "Permitting documents" among the records the City keeps. Requests go through the City's online form, by email to records@orlando.gov or on 407.246.2148. The City sends a confirmation with a request number and any fee within two business days; if the estimate is over $100 it wants payment before work starts (read 23 October 2026).

What our Orlando file adds

The Permit Lookup answers "what was permitted at this address". Our pages answer "what does this firm's Orlando record look like".

Trade Permits Firms Usual days to final
Roofing 9,818 1,058 27
HVAC 8,269 759 91
Electrical 7,076 751 127
Plumbing 6,075 468 123
Remodel 4,716 800 59
New home 3,107 292 203

5,030 firms pulled the 42,936 permits. A typical Orlando re-roof permit reached final in 27 days; a new home took 203.

The Orlando permit statistics page has the same file by trade, year and month; the firm lists are on the roofing, HVAC and remodel compare pages. To check the licence behind a name on a permit, use the Orlando contractor license lookup; to check whether your job needs a permit at all, see Do I need a permit?.

See every Orlando roofer by days to final →

What this does not tell you

We hold permits for one- and two-family homes issued from October 2023 to September 2026; commercial work and older permits are not in our pages. A permit on file shows the work was declared and inspected, not that it was done well.

How we know this

Portal details are quoted from the City of Orlando's Get a Permit and Request a Public Record pages, read 23 October 2026. The Permit Lookup site itself refuses automated reading, so its search fields are not described. Statuses are those in the City's Permit Applications file, October 2023 to September 2026.

Numbers come from City of Orlando building permits for one- and two-family homes, data through October 17, 2026. Nobody paid to be on this page and nobody can.

Questions

  • How do I find out if a permit was pulled on my house in Orlando?

    Search the property in the City's Permit Lookup tool, linked from orlando.gov under Get a Permit. It shows each permit's status, plan review dates, related permits and fees. Only addresses inside Orlando city limits are covered.

  • Are Orlando building permits public record?

    Yes. The City Clerk lists permitting documents among the City's public records, and the permits are also published on the City's open data portal as Permit Applications. Older files can be requested from records@orlando.gov or on 407.246.2148.

  • What does 'final' mean on an Orlando permit?

    That the inspections were completed and passed. The City tells permit holders to make sure the status is final; a permit that sits open for six months without an inspection expires.

  • Can I search Orlando permits by contractor name?

    The City's pages do not describe a contractor search. Our Orlando compare pages group every permit from October 2023 to September 2026 by the firm that pulled it.

  • How long does an Orlando permit take to reach final?

    It depends on the job. In our file the usual re-roof permit reached final in 27 days, an HVAC permit in 91 and a new home in 203.

Build your own list

Every firm with that kind of permit on record. Pick what you value. The list moves.