Home › Guides › Do I need an HVAC permit in Prince George's County? Which permits an AC, heat pump or furnace needs, the 1.3% fee, and 12,659 permits

Do I need an HVAC permit in Prince George's County? Which permits an AC, heat pump or furnace needs, the 1.3% fee, and 12,659 permits

Yes: in Prince George's County, Maryland, installing or replacing a central air conditioner or heat pump takes both an electrical permit and a mechanical permit, and a gas furnace adds a third, a plumbing permit from WSSC Water. The county's Department of Permitting, Inspections and Enforcement (DPIE) issued 12,659 mechanical permits from May 2021 to April 2023, the usual one declared at $7,088.

By Contractor Records · data through October 19, 2026

Which permits each system needs

DPIE's When Is a Permit Required? table, under "Appliance Installations (includes replacements)" (read 24 October 2026):

Install Electrical Mechanical Plumbing (gas) Plans?
Electric air conditioning Yes Yes No No
Heat pump Yes Yes No No
Oil furnace Yes Yes No No
Gas furnace Yes Yes Yes No
Electric furnace Yes No No No
Solar heating system Yes Yes Building permit too No
Portable or window A/C No No No No

A cord-and-plug unit needs no permit. Plumbing and gas permits are issued by WSSC Water, not DPIE.

Who can pull it. DPIE's Mechanical Permits page says the "Licensed/Master HVACR will need to register" to apply online. Since 15 July 2024, electrical and mechanical permits "must be obtained via the Prince George's County Momentum" system. Registration takes the Electronic Signature Acknowledgment form, a Momentum profile and an email to onlinemechanicalpermits@co.pg.md.us with the license and driver's license; DPIE asks applicants to allow 24 hours for verification. The page describes no homeowner route.

What it costs

From the DPIE Fee Schedule, effective 16 October 2026:

Permit Fee
Mechanical, residential or commercial Greater of $86 or 1.3% of the mechanical construction cost
Electrical, A/C equipment unit $50
Administrative fee (residential), each permit $66
Technology fee 10%

At the usual declared value in our data, $7,088, 1.3% is $92.14, so a typical replacement's mechanical permit is about $92 plus $66, plus 10%: $174. The electrical permit for the condenser adds $50 plus $66, plus 10%: $127.60. The WSSC permit for a gas furnace is separate.

Inspections

DPIE's Mechanical Permits page says residential systems outside the Third-Party Inspection Program are inspected by DPIE building inspectors, including duct rough-in and system setup. The master HVAC installer submits third-party certification of system data, distribution, zones, start-up and performance testing, and a DPIE inspector makes a final visual quality-assurance inspection. Projects with a total construction cost of $200,000 or more go into the Third-Party Inspection Program.

What 12,659 HVAC permits show

Measure Prince George's County mechanical permits
Permits, May 2021 to April 2023 12,659 (16% of all DPIE permits)
May 2021–April 2022 / May 2022–April 2023 6,768 / 5,891 (−13%)
Usual declared value $7,088 (middle half $4,145 to $9,983)
Filed online (DPIE Online MECC) 12,534 (99%)
Busiest / quietest month June (128) / January (79)
ZIPs with the most 20772 (1,230), 20613 (955), 20774 (910), 20744 (732)

Filing follows the cooling season: June is 28% above an average month and July 19%, while January is 21% below. 20772 (Upper Marlboro) leads, ahead of 20613 (Brandywine) and 20774. The middle half of declared values is a narrow band, $4,145 to $9,983. Monthly counts are on Prince George's County HVAC permits; every kind of work on Prince George's County permit statistics and the rows on browse Prince George's County permits.

Before you hire

Look up past permits on your address in Permit LookSee and the legacy ePermit search (Prince George's County building permit search), and ask for the installer's Maryland HVACR license number. Next door: Montgomery County HVAC permit. Elsewhere: do I need a permit to replace my furnace or AC and filed values in HVAC replacement cost.

What this does not tell you

Our window ends in April 2023, when DPIE's move to Momentum thinned the open data; no current public file has mechanical permits. The file does not say whether a mechanical permit is for a house, so we cannot split homes from businesses, and it names no contractor and has no status or final date.

How we know this

Permit requirements are quoted from DPIE's When Is a Permit Required table, the licensing, Momentum and inspection rules from its Mechanical Permits page, and fees from the DPIE Fee Schedule effective 16 October 2026, all read 24 October 2026. Our counts are the county's open data Residential and Commercial Permits (July 2013 to Present) file, read 19 October 2026: mechanical permits issued May 2021 to April 2023.

Numbers come from public permit records in 57 cities, data through October 19, 2026. Nobody paid to be on this page and nobody can.

Questions

  • Do I need a permit to replace my AC in Prince George's County?

    Yes. DPIE's permit table lists installing electric air conditioning, replacements included, as needing an electrical and a mechanical permit, with no plans. A window or portable unit needs no permit.

  • What permits does a gas furnace need in Prince George's County?

    Three: electrical, mechanical and plumbing, according to DPIE's When Is a Permit Required table. An oil furnace or heat pump needs electrical and mechanical permits; an electric furnace only an electrical permit. Gas and plumbing permits come from WSSC Water, not DPIE.

  • How much is an HVAC permit in Prince George's County?

    Under DPIE's fee schedule effective 16 October 2026, a mechanical permit is $86 or 1.3% of the mechanical construction cost, whichever is greater, plus a $66 administrative fee and a 10% technology fee. The matching electrical permit for an A/C unit is $50 plus the same fees.

  • Who can pull a mechanical permit in Prince George's County?

    A licensed master HVACR contractor, who registers with DPIE and applies in Momentum. DPIE's Mechanical Permits page describes no homeowner route.

  • How many HVAC permits does Prince George's County issue?

    12,659 mechanical permits from May 2021 to April 2023, about 6,330 a year. The second year, 5,891, was 13% below the first year's 6,768.

Build your own list

Pick your city and the kind of work. Every firm with a permit on record, sorted by what you value.