Contractor Records
Home › Guides › Prince George's County building permit search: Momentum, ePermits and MPIA requests

Prince George's County building permit search: Momentum, ePermits and MPIA requests

To look up a building permit in Prince George's County, Maryland, search the address in Permit LookSee on the county's Property Explorer for permits applied for on or after May 1, 2023, and in the legacy ePermit search for older ones. The Department of Permitting, Inspections and Enforcement (DPIE) says Permit LookSee takes "the application number OR the address" and that "All permits applied for on or after May 1, 2023, are in Momentum" (Permits Search Flyer, read 24 October 2026). The county's open data file lists 78,924 permits from May 2021 to April 2023.

By Contractor Records · data through October 19, 2026

Which system has your permit

DPIE permits building, electrical, mechanical, fire-protection, sign and raze work across the county, from Upper Marlboro and Bowie to Hyattsville, Laurel and Fort Washington. Plumbing and gas permits come from WSSC Water. A few municipalities issue some permits of their own. For the neighbouring counties, see the Montgomery County and Washington, DC guides.

Tool Search by What it covers
Permit LookSee (Property Explorer) Application number or address, then the Building Permits tab Momentum permits, applied for from May 1, 2023
Permit History by Street Address (legacy ePermits) Street address Permits applied for or issued before May 1, 2023
Permit Search, Permit Status Tracking, Inspection History (legacy ePermits) Permit number Status and inspections of a legacy permit
PG-County App Tracker Application number Plan review progress; DPIE says the number must contain letters
Open data: Residential and Commercial Permits Any column, as a download Permits from July 2013; our source

How to look up the permits on a Prince George's County address

  1. Open Permit LookSee, enter the address, choose the Building Permits tab and click Search. This finds permits from May 2023 on.
  2. For older work, open Permit History by Street Address in the legacy ePermit system and enter the address.
  3. Note each permit number. Electrical and mechanical permits are separate from the building permit.
  4. For a legacy permit, run the number through Permit Status Tracking and Inspection History by Permit Number, linked from the same site.
  5. For plumbing or gas work, ask WSSC Water; DPIE does not issue those permits.

What the statuses mean here

The county's open data file has no status and no final inspection date, so it can't say which permits were finished. Status lives in the systems themselves: Permit Status Tracking and Inspection History for legacy permits, and the Momentum record behind Permit LookSee for newer ones. DPIE notes that permit status in ePlan (ProjectDox) is shown only to the applicant on each case, so an owner who hired a contractor should ask to be added as "Applicant–Owner–Principal" (Permits Search Flyer, read 24 October 2026).

When the record is not online

Request older files, plans and inspection records under the Maryland Public Information Act. DPIE says requests "should be submitted on the DPIE MPIA form and emailed to" DPIE.MPIA@co.pg.md.us, naming the subject and a date range. The first two hours of search are free, then $82 an hour; paper copies are $0.32 a page, and duplicate permits, inspection history and certified copies are $6.60 each. DPIE has up to 30 working days to respond and tells you the cost before copies are made (Methods for Submitting MPIA Requests, read 24 October 2026).

What our Prince George's County pages add

Our Prince George's County page counts DPIE permits from May 2021 to April 2023:

Kind of work Permits (May 2021–Apr 2023) Share Homes
Electrical 32,079 41% 79%
HVAC 12,659 16% under 1%
Solar 9,331 12% 82%
Garages, sheds and shade structures 3,826 5% 100%
New homes 3,787 5% 100%
Fences and walls 3,242 4% 100%
Remodels and repairs 3,029 4% 100%
Roofing 880 1% 95%
Additions 869 1% 100%

Solar permits rose 25% between the two years of the window (May 2021–April 2022 against May 2022–April 2023). HVAC shows almost no homes because the file doesn't say whether a mechanical permit is for a house. ZIP 20772 had the most permits, 7,325. The permit statistics page has year, month and ZIP counts, and browse permits lists the rows. Home improvement contractors in Maryland are licensed by the Maryland Home Improvement Commission.

What this does not tell you

Our window ends in April 2023. When DPIE moved building permits to Momentum in 2023, the open data file thinned out, and the separate Momentum file covers building permits only and stops in July 2025, so no current public file covers every kind of permit. The file names no contractor, so we have no firm lists, and it has no status or final date, so we show no finished share or time to final. The declared construction cost is filled on about half of the permits.

How we know this

The search tools and the May 1, 2023 Momentum cut-over are from DPIE's Permits Search Flyer, and the MPIA route and fees from DPIE's Methods for Submitting MPIA Requests page, both read 24 October 2026. Our counts are the county's open data Residential and Commercial Permits (July 2013 to Present) file, read 19 October 2026: permits issued May 2021 to April 2023.

Numbers come from public permit records in 57 cities, data through October 19, 2026. Nobody paid to be on this page and nobody can.

Questions

  • How do I find out if a permit was pulled on my house in Prince George's County?

    Search the address in two places. Permits applied for on or after May 1, 2023 are in Momentum, searched through Permit LookSee on the county's Property Explorer. Earlier permits are in the legacy ePermit system: use Permit History by Street Address at dpiestatus.princegeorgescountymd.gov.

  • Where are plumbing permits in Prince George's County?

    Plumbing and gas permits are issued by WSSC Water, not by the county's Department of Permitting, Inspections and Enforcement (DPIE), so they are not in DPIE's searches or our counts.

  • Can I look up Prince George's County permits by contractor?

    DPIE's public searches are by permit number or address, and the county's open permit file names no contractor. Get the licence number from the contractor and check it with the Maryland Home Improvement Commission.

  • How many building permits does Prince George's County issue?

    About 39,500 a year in the last full stretch of the county's open data file: 78,924 permits from May 2021 to April 2023. Electrical led with 32,079, then HVAC with 12,659 and solar with 9,331.

  • How do I get an old Prince George's County permit file?

    Email DPIE's Maryland Public Information Act request form to DPIE.MPIA@co.pg.md.us. DPIE says the first two hours of search are free and it has up to 30 working days to respond.

Build your own list

Pick your city and the kind of work. Every firm with a permit on record, sorted by what you value.