Remodel, addition or rebuild: the filed costs
The usual filed value of each permit type, from each city's own file. A rebuild is roughly the demolition plus the new home.
| City | Remodel | Addition | Demolition | New home | New home: usual days to final |
|---|---|---|---|---|---|
| Minneapolis, MN | $15,000 | $100,000 | $15,000 | $433,850 | 396 |
| Saint Paul, MN | $15,000 | $94,000 | $12,000 | $342,000 | 559 |
| Columbus, OH | $22,000 | $113,269 | $11,854 | $350,000 | 252 |
| Cincinnati, OH | $17,856 | $100,000 | $15,000 | $204,000 | 660 |
| Cary, NC | $40,000 | $125,000 | $21,750 | $359,500 | 176 |
| Greensboro, NC | $35,000 | $66,975 | $10,449 | $189,075 | 156 |
| Miami, FL | $15,000 | $38,564 | $11,500 | $648,376 | 648 |
| Cape Coral, FL | $34,733 | $125,000 | $8,000 | $416,297 | 232 |
| Honolulu, HI | $20,000 | $100,000 | $5,000 | $370,000 | 295 |
| Pittsburgh, PA | $12,547 | — | $26,900 | $223,373 | 660 |
City cost pages: Minneapolis new homes, Columbus remodels, Cary new homes, Cape Coral new homes, Miami remodels.
Reading the table
The gap is large everywhere. In Columbus a new house ($350,000) is filed at about 16 times the usual remodel ($22,000); in Cape Coral ($416,297 against $34,733) about 12 times. Even an addition, the biggest common remodel, is a fraction of a new house: $125,000 against $359,500 in Cary.
But the usual remodel is a small job. The remodel column mixes bathrooms with gut renovations, so it understates what a whole-house remodel costs. For a whole-house job, the top of each city's band of remodel firms is a better comparison: in Minneapolis the middle half of remodel firms usually file $11,400 to $50,000, and in Columbus $17,000 to $65,000. When your remodel quote approaches half of the city's usual new home, it is worth pricing a rebuild.
A rebuild takes far longer. The usual new home took 176 days from permit to final in Cary, against 84 for a remodel; in Miami 648 against 182. That is after demolition, which has its own permit and clock (133 days to final in Miami), and after plan review. You will usually be living elsewhere for all of it.
When rebuilding is the answer
- The flood-zone 50% rule. In a flood zone, if the cost of "reconstruction, rehabilitation, addition, or other improvement" to a building "equals or exceeds 50 percent of the building's market value", the building "must meet current flood zone construction requirements"; substantially damaged buildings must be brought up to the same standards (City of Cape Coral, read 21 October 2026). Once a remodel crosses that line, much of the cost of a new house arrives anyway. Ask your building department how it sets market value and whether it adds up improvements over several years before you design the remodel.
- Structure. If the foundation or framing is failing, the remodel becomes a rebuild in stages.
- Most walls move. A layout change that moves most walls and every pipe is priced like new construction. Arlington County, for example, treats moved pipes or drywall as permitted work even in a kitchen (Arlington County).
When remodelling is the answer
When the structure is sound and you want more room or new rooms, not a different house. An addition gives you square footage at a fraction of a new home's filed value, and the house stays lived-in for part of the work. It also keeps you clear of rules that apply to new construction, such as current setbacks and, on some lots, the 50% rule above.
Who builds which
Different firms do each. Remodels are spread across many small firms: 49.4% of Minneapolis remodel firms filed exactly one remodel permit. New homes are concentrated: in Cape Coral, 362 firms filed 3,254 new-home permits, and 92.1% of those a year or more old reached a final. For a rebuild, you are choosing a home builder: see how to choose a home builder. For a remodel, see hiring a remodeling contractor, and for adding space, ADU vs addition.
See Minneapolis remodelers and their finished share →
What this does not tell you
Filed values are the contractors' figures for the permitted work, not your total cost: land, design, temporary housing and finishes are often outside them, and a new-home filing may cover the shell only. The new-home column covers houses of every size on every kind of lot. The remodel column mixes job sizes. Demolition permits include garages and outbuildings as well as houses. Compare your own quotes with these ranges; do not price a project from them.
How we know this
Each column is the median filed value of that city's permits of that type over its three-year window ending September 2026; new-home days are the median from issue to final. "Reached final" is the share of permits a year or more old that the city closed with a final. The 50% rule is quoted from the City of Cape Coral's substantial improvement page and the Arlington County rule from its residential permits page, read 21 October 2026.
Numbers come from City of Minneapolis construction permits (CCS); City of Columbus Building & Zoning Services permits on 1-, 2- and 3-family homes (the city's Accela permit layer); Town of Cary building permit applications (issued permits only); City of Cape Coral building permits (the city's open permit table starts January 2025); City of Miami building permits (since 2014); City of Saint Paul approved building permits; City & County of Honolulu building permits (DPP); City of Greensboro building and trade permits, data through October 17, 2026. Nobody paid to be on this page and nobody can.
Questions
- Is it cheaper to remodel or rebuild?
Remodelling, by a wide margin, for most jobs. The usual new-home permit was filed at $350,000 in Columbus against $22,000 for a remodel and $113,269 for an addition; in Cary, $359,500 against $40,000 and $125,000. A rebuild also adds demolition: $11,854 in Columbus, $21,750 in Cary.
- When does rebuilding make sense?
When the remodel would be most of a new house anyway: structural problems, a layout that cannot be fixed without moving most walls, or, in a flood zone, a renovation big enough to trigger the 50% rule, which requires the whole building to meet current flood construction rules.
- What is the 50% rule?
In a flood zone, if the cost of an improvement "equals or exceeds 50 percent of the building's market value", the building "must meet current flood zone construction requirements" (City of Cape Coral). It applies to reconstruction, additions and rehabilitation, so a large remodel can carry the cost of a rebuild.
- How long does a rebuild take compared with a remodel?
Much longer. From permit to final, the usual new home took 176 days in Cary against 84 for a remodel, and 396 days in Minneapolis against 161. Demolition and plan review come before that.
- Do I need a separate permit to demolish the house?
Yes, in every city in the table, and demolition permits are filed as their own type. The usual one was filed at $15,000 in Minneapolis and $11,500 in Miami, and took 133 days to final in Miami.
Build your own list
Every firm with that kind of permit on record. Pick what you value. The list moves.
Related guides
- How much does it cost to hire a general contractor? Filed job values in 12 cities, and what the fee covers
- How long does a home project take? Permit to final inspection, by job and city
- Contractor didn't finish the job: what to do, and what the permit file shows
- Design-build vs general contractor: one contract or two, and who may draw your plans
- New home construction cost in 2026: what new-house permits were filed at in 20 cities
For one city
- Substantial improvement requirements — City of Cape Coral, FL (accessed 2026-10-21)
- Residential permits — Arlington County, VA (accessed 2026-10-21)