Data through September 2026 · updated 23 Oct 2026

664 remodel and repair permits were issued in unincorporated Maricopa County, October 2024 through September 2026: about 332 a year and 4% of all permits. 363 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 21% more than the 301 in the 12 months before. The busiest month is April. The usual one took 80 days from issue to the county's final. 85351 has the most, 111.

664permits issued
363last 12 months
Aprbusiest month
80days, usual issue to final
78%finished
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 25Oct2024Nov 2024: 14Dec 2024: 21Jan 2025: 27Jan2025Feb 2025: 22Mar 2025: 16Apr 2025: 31May 2025: 37Jun 2025: 26Jul 2025: 19JulAug 2025: 35Sep 2025: 28Oct 2025: 28Nov 2025: 25Dec 2025: 35Jan 2026: 29Jan2026Feb 2026: 40Mar 2026: 32Apr 2026: 33May 2026: 24Jun 2026: 38Jul 2026: 28JulAug 2026: 29Sep 2026: 22
The same numbers as a table
MonthPermits
Oct 202425
Nov 202414
Dec 202421
Jan 202527
Feb 202522
Mar 202516
Apr 202531
May 202537
Jun 202526
Jul 202519
Aug 202535
Sep 202528
Oct 202528
Nov 202525
Dec 202535
Jan 202629
Feb 202640
Mar 202632
Apr 202633
May 202624
Jun 202638
Jul 202628
Aug 202629
Sep 202622

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (116), November the quietest (70). A busy month at the permit counter usually means a longer wait for a contractor.

January: 101 (100 = an average month)February: 112 (100 = an average month)March: 87 (100 = an average month)April: 116 (100 = an average month)116May: 110 (100 = an average month)June: 116 (100 = an average month)July: 85 (100 = an average month)August: 116 (100 = an average month)September: 90 (100 = an average month)October: 96 (100 = an average month)November: 70 (100 = an average month)December: 101 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January101
February112
March87
April116
May110
June116
July85
August116
September90
October96
November70
December101

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 235 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025301
Finished78.1%
Expired18.9%
Usual days, issue to final80
Middle half, days39–164

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the county's 664 remodel and repair permits.

ZIP codePermitsShare
8535111117%
8524810416%
853758212%
85086558%
85373365%
85340254%
85207244%
85355203%
85331173%
85208142%

Download this table (CSV)

How Maricopa County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Phoenix. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Maricopa County Planning & Development building permits (ArcGIS: Building_Permits_(view) and BuildingPermitsAndAllCases), read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the county issues for unincorporated land only: Sun City, Sun City West, Anthem and New River, Rio Verde, Tonopah, Wittmann, county islands and similar places. Phoenix, Mesa, Scottsdale, Glendale and the other cities run their own permit offices and are not in this file.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for this county.
  • The file has no declared job value, so we show no costs.
  • The county moved to a new permit system in 2022 to 2024 and older permits were not carried over, so the window starts in October 2024, the first month the counts settle.
  • A final date comes from the county's finaled date; a permit the file marks Complete without one counts as finished but adds no days.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in unincorporated Maricopa County, AZ", https://contractorrecords.com/maricopa-county/remodel-permits, data through September 2026, from Maricopa County Planning & Development building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits by ZIP code.

Common questions

  • How many remodel and repair permits does Maricopa County issue a year?About 332 a year in unincorporated Maricopa County: 664 permits issued October 2024 through September 2026, 363 of them in the last 12 months.
  • How long does a remodel and repair permit take in Maricopa County?The usual one took 80 days from issue to the county's final inspection, and the middle half took 39 to 164 days (235 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Maricopa County file the most remodel and repair permits?April (116 against an average month of 100); November is the quietest (70). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Maricopa County?85351, with 111 of the 664 (17%); then 85248 (104).