860 remodel and repair permits were issued in the City of Tempe, October 2024 through September 2026: about 430 a year and 18% of all permits. 463 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 17% more than the 397 in the 12 months before. The busiest month is April. The usual one took 85 days from issue to the city's final. 85282 has the most, 276.

860permits issued
463last 12 months
Aprbusiest month
85days, usual issue to final
80%finished
$10,000usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 34Oct2024Nov 2024: 34Dec 2024: 28Jan 2025: 33Jan2025Feb 2025: 46Mar 2025: 28Apr 2025: 41May 2025: 37Jun 2025: 29Jul 2025: 29JulAug 2025: 30Sep 2025: 28Oct 2025: 34Nov 2025: 40Dec 2025: 33Jan 2026: 35Jan2026Feb 2026: 36Mar 2026: 42Apr 2026: 68May 2026: 43Jun 2026: 35Jul 2026: 27JulAug 2026: 38Sep 2026: 32
The same numbers as a table
MonthPermits
Oct 202434
Nov 202434
Dec 202428
Jan 202533
Feb 202546
Mar 202528
Apr 202541
May 202537
Jun 202529
Jul 202529
Aug 202530
Sep 202528
Oct 202534
Nov 202540
Dec 202533
Jan 202635
Feb 202636
Mar 202642
Apr 202668
May 202643
Jun 202635
Jul 202627
Aug 202638
Sep 202632

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (152), July the quietest (78). A busy month at the permit counter usually means a longer wait for a contractor.

January: 95 (100 = an average month)February: 114 (100 = an average month)March: 98 (100 = an average month)April: 152 (100 = an average month)152May: 112 (100 = an average month)June: 89 (100 = an average month)July: 78 (100 = an average month)August: 95 (100 = an average month)September: 84 (100 = an average month)October: 95 (100 = an average month)November: 103 (100 = an average month)December: 85 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January95
February114
March98
April152
May112
June89
July78
August95
September84
October95
November103
December85

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 310 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025397
Finished79.8%
Expired12.6%
Usual days, issue to final85
Middle half, days51–156

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 851 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$10,000
Middle half$4,990–$26,089

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 860 remodel and repair permits.

ZIP codePermitsShare
8528227632%
8528325630%
8528414217%
8528112314%
85288627%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Miscellaneous(Barns, Sheds, Tennis Courts, etc.)54163%
Additions or Alterations - Residential31036%
Renewal of Existing Permit7under 1%
Residential Non-Structural Projects2under 1%

Download this table (CSV)

How Tempe compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Phoenix. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Tempe Open Data, Permits Issued by Building Safety (BLDS layer from Accela), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, trade, pool, sign and demolition permits the City of Tempe Building Safety Division issues inside the city limits only. Phoenix, Mesa, Chandler, Scottsdale and unincorporated Maricopa County run their own permit offices and are not in this file. The city's engineering permits (water and sewer, drainage, paving, grading) are left out.

  • The city's open permit file leaves the contractor field blank on building permits, so there are no contractor lists, rankings or firm pages for Tempe.
  • The value is the estimated project cost on the permit; electrical, plumbing and mechanical permits are filed as no-value permits and carry none. It is not a final cost.
  • Kinds of work come from the permit's federal building class; general residential alterations and miscellaneous permits are sorted into trades by keywords in the work description.
  • Few roof replacements appear in the file, so roofing has no page of its own.
  • A final date is the date the city recorded the permit as completed. Permits marked Final, Finaled, CofO Issued or Closed count as finished; some of them carry no completed date and add no days.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in the City of Tempe, AZ", https://contractorrecords.com/tempe/remodel-permits, data through September 2026, from the City of Tempe Building Safety Division building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits: declared value · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Tempe issue a year?About 430 a year in the City of Tempe: 860 permits issued October 2024 through September 2026, 463 of them in the last 12 months.
  • How long does a remodel and repair permit take in Tempe?The usual one took 85 days from issue to the city's final inspection, and the middle half took 51 to 156 days (310 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Tempe file the most remodel and repair permits?April (152 against an average month of 100); July is the quietest (78). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Tempe?85282, with 276 of the 860 (32%); then 85283 (256).