How much does home addition cost in Minneapolis? The usual addition job filed with Minneapolis is $100,000, from 403 priced permits (October 2023 through September 2026); the middle half of firms file between $120,000 and $225,000. A filed value is what the contractor wrote on the permit, not a quote or the final bill.
The usual addition job filed with Minneapolis is $100,000, from 403 priced permits, October 2023 through September 2026. The middle half of firms usually file between $120,000 and $225,000. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. An addition permit here usually takes 338 days from issue to final inspection. How long permits take →
Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 403 priced permits across 260 firms, pooled into one. Half of Minneapolis addition permits were filed between $49,700 and $194,000.
| Percentile | Filed value | Reads as |
|---|---|---|
| 10th | $15,000 | 1 in 10 permits filed below |
| 25th | $49,700 | 1 in 4 filed below |
| 50th | $115,000 | the middle permit |
| 75th | $194,000 | 1 in 4 filed above |
| 90th | $300,000 | 1 in 10 filed above |
Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: City of Minneapolis assessor values (2026).
| Firms working on | Usual home value | Usual filed value | Firms | Permits |
|---|---|---|---|---|
| Lower third | under $395,200 | $70,000 | 86 | 107 |
| Middle third | $395,200–$586,500 | $146,000 | 86 | 156 |
| Upper third | $598,900 and up | $200,000 | 87 | 140 |
Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in; both are shown for firms with 5 or more priced permits. Busy is not the same as careful: pick what you value to build a list.
| Firm | Permits | Last 12 mo | Usual | Middle half | Finished |
|---|---|---|---|---|---|
| White Crane Construction | 14 | 3 | $214,778 | $167,357–$257,665 | 90.1% |
| Terra Firma Building & Remodeling | 10 | 3 | $230,000 | $56,250–$342,500 | 5 of 7 |
| A Squared Design LLC | 5 | 3 | $65,000 | $65,000–$135,000 | — |
| I Site Dev LLC | 3 | 3 | — | — | — |
| Hanson Remodeling | 8 | 2 | $161,551 | $126,351–$231,328 | 5 of 6 |
| Sylvestre Construction Inc | 5 | 2 | $59,800 | $19,950–$92,875 | — |
| Full Circle Construction | 4 | 2 | — | — | — |
| City Construction Services LLC | 3 | 2 | — | — | — |
| KJB Homes | 3 | 2 | — | — | — |
| Lindus Construction | 3 | 2 | — | — | — |
Line your quote up against the file. In Minneapolis, 1 in 10 addition filed values sit under $15,000, the middle half between $49,700 and $194,000, and 1 in 10 over $300,000.
Minneapolis files the fewest addition permits in February (58 against an average month of 100) and the most in June (135). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Minneapolis →
Source: City of Minneapolis construction permits (CCS). The window is October 2023 through September 2026; a permit filed after that isn't here yet.
Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.
The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.
Nobody paid to be on this page and nobody can. How the records work in Minneapolis →
Addition cost in other cities: Orlando Cincinnati Miami Denver San Diego Honolulu Albuquerque Boulder Greensboro Saint Paul Arlington, VA Scottsdale Somerville Cary Naperville Bellevue Cape Coral Bellingham Bend San Francisco Anaheim Columbus, OH Marin County (unincorporated)
Other job costs in Minneapolis: Roofing · Remodel · Windows & Doors · Siding · Solar · Drain Tile & Waterproofing · Garage & Accessory · Deck, Porch & Stoop · New Home · Demolition